Railway Systems Procurement for Control, Command, Signalling and Traffic Management (CCS and TM) systems
Railway signalling works
UK
Published value
Not published
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: HS2: "Railway Systems Procurement for Control, Command, Signalling and Traffic Management (CCS and TM) systems". Published status: complete. Published value: Value not published. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
| Contracting Authority | HS2 | Scope & Categories | Not published | Submission Window | complete No deadline published |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | Not published |
Bidder Intelligence · Authority Profile: HS2
Market Analytics
Derived from OCDS awards & bid statistics
Published history for HS2. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Average Price Reduction
Not availableInsufficient comparable data
Competition Density
2.7Bids / Report
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate availablePayment Terms
Check noticePublished terms
Coverage: 22 active published awards; 20 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Price reduction compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityHS2 | Procedure methodNot published | Procurement categoryNot published |
Statuscomplete | Framework / DPSNot published | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published20 Jan 2025, 17:36 GMT | Last source update20 Jan 2025, 17:36 GMT | Recurring procurementNot published |
ClassificationRailway signalling works | ||
Delivery area UK | ||
OCIDocds-h6vhtk-04d4de | ||
What is being bought
The CCS and TM scope comprises (for a high speed railway):
- traffic management system (TMS),
- European Train Control System (ETCS) with all lineside equipment,
- signalling equipment including interlocking and train detection equipment,
- automatic train operation (ATO) Grade of Automation 2 over ETCS,
- possession management system,
- enterprise service bus,
- weather monitoring system and adhesion management system.
This includes without limitation the design, manufacture, supply, installation, supervision, inspection, safety authorisation, testing, commissioning and maintenance until handover to trial operations and ongoing technical support services of the CCS and TM Systems.
What changed
From the official release history
- Status changed to complete
20 Jan 2025, 17:36 GMT - Official notice release published
20 Jan 2025, 17:36 GMT - Buyer information updated
20 Jan 2025, 17:36 GMT
Lots and requirements (1)
Published by the contracting authority
- Lot 1 · #1Individual lot title not publishedcancelledPublished valueNot publishedThis package of work comprises the CCS and TM Systems. The controller workstations and centrally located equipment cubicles will be located at the Network Integrated Control Centre (NICC) at Washwood Heath. Other equipment will be located along the route, in stations and at the interfaces with depots and Network Rail infrastructure. The CCS and TM Systems will have the following minimum requirements. • The trackside ETCS will deliver level 2 functionality (without signals); ETCS will be provided on all open route, sidings, spurs, loops, tunnels and stations on HS2 infrastructure. • Automatic train operation (ATO) with Grade of Automation 2 will be available on all open route, sidings, spurs, loops, tunnels and stations on HS2 infrastructure and into Washwood Heath Rolling Stock Depot stabling roads and bypass road. • The main TMS functionality will include as a minimum automatic train supervision and regulation including plan/replan functionality, automatic platform re-allocation, reconfigurable control areas, interfaces to third party stock and crew systems and interfaces to third party support tools for automatic incident management. The TMS will provide timetable and contingency plan management, conflict identification and conflict decision support. The TMS will provide outputs for real-time passenger information • The possession management system will permit the safe reservation/occupation of sections of the track for personnel and trains. • The enterprise service bus will enable the NICC and other stakeholders’ systems to access and exchange common, real-time status information for all trains and HS2 CCS assets. • The weather monitoring system will provide information about wind, on specific locations of the HS2 infrastructure. Data shall be provided to the CCS & TMS systems to indicate areas where speed restrictions should be applied due to high winds. • The adhesion monitoring system will provide information about low adhesion areas. Uninterruptible power supplies will be provided where necessary to meet the required reliability and availability of the CCS and TM systems. All works to be undertaken under this procurement shall give due cognisance to and be compliant with the appropriate elements of the High Speed Rail (London — West Midlands) Act 2017. The route will be handed over to the track system contractors by the Main Works Civils Contractors in stages following the completion of works under their contracts. The track installation will be staged based upon multiple testing areas. Initially, the track system contractor will have exclusive access to enable their installation to be completed. Access will then be granted to the other railway systems contractors including the CCS and TM Contractor. The CCS and TM Contractor will mobilise to commence the works as each area becomes available. It is proposed that HS2 Ltd will take on the role of client and principal designer. The CCS and TM Contractor may be required to act as principal contractor for certain stages of the NICC systems installation or for remote locations. The employer will require the contractor to provide technical support services as part of a separate technical support contract. The technical support contract will be entered into at contract award but will only become effective upon successful completion of trial operations.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Procedure published
20 Jan 2025, 17:36 GMT - Award active
Not published · Not published - Contract active
Signed 20 Dec 2024, 00:00 GMT · Not published
Commercial outcome and competition
Awards Siemens Mobility Limited Not published · Not published · active |
Contracts Contract Not published · signed 20 Dec 2024, 00:00 GMT · active |
Bid statistics bids: 6 (lot 1) electronicBids: 6 (lot 1) |
Buyer and organisations in this procedure
HS2
Contracting authority GB-FTS-6976Documents (0)
Official links; attachments are not copied
No linked documents are published
Related procedures (0)
No related procedures published