Find a TenderAwarded without competitionContract details notice
Published 13 Jan 2026, 15:38 GMT

Official UK procurement notice

Rail Replacement System · UK public procurement notice

Official notice

Authority: NETWORK RAIL (HIGH SPEED) LIMITED (Public body)

Direct awardUtilities
Sectors: Industrial machinery (42) Delivery: UK
Budget not disclosedValue not published
Awarded 26 Feb 2026no call for competition
Awarded to Geismar Rail Industry Technologies & Services SAS

What is being bought

Published requirement description

The requirement for this procurement is four Rail Replacement Gantries systems for use on the HS1 route. The gantry system must be able to deliver the following requirements and conform to particular interfaces:

Key requirements:

System must deliver renewals in CP4

System must operate in single-bore tunnel environment

System must perform rail replacement activities in weeknight shift

System must be capable of exchanging both S&C assets and CWR

System must deliver rail, exchange rails, and collect scrap in the same working shift

Key considerations for interface groups:

Permanent way:

The track gauge is 1435mm. The rail type is UIC60 (aka CEN60) on mainly ballasted track with twin block sleepers, and ~50km single track on slab track.

The maximum installed cant is 160mm. The maximum gradient is 1 in 40 (2.5%).

Open sections have a maximum speed of 300km/h, with track centres spaced at 4.5m.

The infrastructure is predominantly built to GC gauge. UIC GB+ gauge applies to the Ashford

connecting lines on the NR Network. The most restrictive, W6a gauge applies to a small number of locations on NRHS-managed infrastructure.

Buildings & Civils:

Several tunnels exist on HS1 including twin tunnels under London from Stratford westwards towards St Pancras and eastwards towards Dagenham. Tunnel depth varies between 24m and 50m. The two London tunnels are 7.5km and 10.1km long and split by Stratford International station. Other major tunnels include the 3.1km tunnel under the Thames at Thurrock in Essex and the 3.2km North Downs Tunnel near Maidstone in Kent.

HS1 features several major viaducts with three exceeding 1km in length: Medway Viaduct carries the line over the river Medway adjacent to the M2 motorway, Thurrock Viaduct takes the line over the A282 Dartford Crossing and Ashford Viaduct takes the fast lines over Ashford International station.

Signalling & Telecoms (S&T):

TVM430 in-cab signalling is used across the infrastructure - except at Ashford and St Pancras

International stations which are equipped with the KVB train protection system.

Electricfication & Plant (E&P):

Catenary compliant with the Energy (High Speed) TSI supplies 25kV at 50Hz AC. The contact wire height is 5080mm above rail level except for the Ashford Station platforms where it is at 4680mm minimum.

Maintenance Depot:

The infrastructure maintenance depot for HS1, Singlewell Infrastructure Maintenance Depot (SIMD), is located at Singlewell, near to Gravesend, Kent. Storage, maintenance and overhaul of the proposed system would need to take place at SIMD.

The contract will also includes the provision of training for Network Rail High Speed personnel to operate and maintain the Gantries once they are delivered to site.

The lotProcurement structure

single lot · no lot value published
Lot #1Awarded

Procedure terms & legal framework

From the official record
Procedure method
Direct award
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Notice status
Awarded without competition
Procurement threshold
Unspecified in notice
Regulatory regime
Utilities
Commercial structure
Stand-alone contract (no framework)
Competition type
Direct award (no call for competition)
GPA / WTO covered
Yes (GPA, CPTPP)
Recurring procurement
Unspecified in notice
First published
13 Jan 2026, 15:38 GMT
Last source update
7 May 2026, 11:33 BST
FTS notice number
2026/S 000-041821
Latest notice
Contract details notice (UK7)
Delivery area
UK
Official registry OCID
ocds-h6vhtk-0604eb Find a Tender
Why no open competition
Single Suppliers Technical Reasons
Published justification

We intend to direct award under the justification that the competition is absent due to technical reasons and in this case only a particular supplier can supply goods. This is because any incompatibility between existing systems/equipment and new goods could also result in time consuming and complex redesign and modification which is unacceptable in the circumstances as this will have a major impact on delivering future work banks. In this case we cannot wait for bespoke alternatives due to the increased risk, cost and expected delay to CP4 renewals. There is a risk that train services will be delayed, delay costs incurred and reputational damage due to faulty assets and that NRHS does not have a viable methodology to address this.

The Geismar ‘PMC’ gantries are intended for S&C replacement and are used extensively by SNCF on their high-speed lines. The gantries are transported to the worksite affixed to rail wagons, meaning they can be moved during passenger service to maximise the maintenance window. A series of PMC units can operate in tandem to replace S&C assets (half sets switches, crossings etc.) as well as longer

lengths of continuously welded rail (CWR). They are remote control operated and self-deploy from the wagon using a combination of offloading legs and the larger,

primary support legs. The assets being replaced can be transported to the worksite on the same consist that delivers the PMC units, where the rail assets are affixed to

the wagon deck, underneath the PMC unit. This allows for the significant benefit of delivering new, replacing, and removing scrap, assets in the same shift – reducing the requirement from three, to one maintenance shift.

The PMC solution has a significantly reduced profile when compared to other larger, tracked gantry systems used for major track renewals works. This unlocks their utility under live OHLE (without isolation) and in areas of restricted structure gauge (i.e tunnels) – both of which are vital for planned NRHS infrastructure maintenance.

The justification is based on schedule 5, paragraph 6 which states:

The following conditions are met in relation to the public contract—

(a)due to an absence of competition for technical reasons, only a particular supplier can supply the goods, services or works required, and

(b)there are no reasonable alternatives to those goods, services or works.

How it was run

Official notice
Submission deadline
—

Timeline

9 Mar 2026 → 7 May 2026 · 2 dates
  1. Standstill ends224 days ago
    9 Mar 2026, 23:59 GMT
  2. Notice published166 days ago
    7 May 2026, 11:33 BST

Notice history

4 events · 3 releases on Find a Tender · since 13 Jan 2026
  1. Transparency notice published
    13 Jan 2026, 15:38 GMT
    UK5
  2. Contract award notice published
    26 Feb 2026, 12:16 GMT
    UK6
  3. Contract signature expected
    11 Mar 2026, 23:59 GMT
    scheduled
  4. Contract details notice published
    7 May 2026, 11:33 BST
    UK7

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 1
Contracts signed 1latest 8 Apr 2026
Awarded toValueDateStatus
Geismar Rail Industry Technologies & Services SAS12 Mar 2026 – 16 Mar 2028€5,271,50026 Feb 2026Awarded

Contracts

Contracting authority & participating public bodies

NETWORK RAIL (HIGH SPEED) LIMITED

Contracting authorityPublic authority - sub-central government GB-PPON: PPWG-4728-MXTL Waterloo General Offices, London, London, SE1 8SWContact name, email, phone

Bidders & participating suppliers

1 commercial party on the notice

Official documents & specifications (3)

Official links; attachments are not copied

Notices published for this procedure

  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Transparency notice awardTransparency noticeUK5Transparency notice on Find a Tender