Official UK procurement notice
Purchase of Power Tools for the Conservation of HMS Victory
Authority: NMRN Operations
What is being bought
Published requirement descriptionThe aim of the HMS Victory Conservation Project is to deliver a fully-conserved ship, able to survive in an open environment, and in a condition to survive for the next 50 years without major work beyond a programme of planned maintenance. This programme will commence in 2022.
The conservation work includes the replacement of all external and some internal planking and structural timber elements.
New power tools are needed to enable this work to take place. This work will include;
- Stripping existing fittings and planking (externally and internally)
- Repairs to hull frames
- Producing laminated planking/large knees for external/internal for the hull
- Fitting and fixing planking and large knees as well as other replacement items internally/externally
- Fitting and fixing of iron work, as well as other similar fittings internally/externally to the ship.
The first phase of the hull conservation project takes place in the ships midships for a minimum of 4 years before work continues to the Fore/Aft of the ship.
CPV: Power tools · Workshop equipment
The lotProcurement structure
single lot · no lot value publishedLot #1This tender is split into two phases which will be awarded for both of them
This tender is split into two phases which will be awarded for both of them. As there is a firm requirement for the first phase of the conservation programme.
Then when we move to the next phase of this we will require purchase of new power tools for this from the same awarded supplier for continuity.
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Goods
- Notice status
- Closed
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 26 Jul 2022, 13:25 BST
- Last source update
- 26 Jul 2022, 13:25 BST
- Award evaluation window
- 31 Aug 2022 – …
- FTS notice number
2022/S 000-020306- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-0355faFind a Tender
Publisher note: (MT Ref:226914)
How it was run
Official notice- Submission deadline
- 31 Aug 2022, 12:00 BST
- Submission channel
- {"electronicSubmission"}
- Accepted languages
- en
- Bids opened
- 31 Aug 2022, 12:00 BST
Timeline
26 Jul 2022 → 31 Aug 2022 · 3 dates- Notice published26 Jul 2022, 13:25 BST
- Submission deadline31 Aug 2022, 12:00 BST
- Bids opened31 Aug 2022, 12:00 BST
Contracting authority & participating public bodies
Dispute resolution & review bodies
- Public Procurement Review ServiceReview body
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.