Provision of Planned and Responsive Maintenance and Minor Works - Belfast Electrical Lot 2

Official notice

Authority: the Education Authority (Central government)·Consortium: 2 public authorities

WorksAward procedure without prior publication of a call for competition
Awarded value£43,265,0012 contracts · exc. VAT
Awarded 12 Apr 2024no call for competition
Awarded to Irwin ME Ltd2 awards
Contract term 1 yr 2 moends 31 Aug 2025 · extension options published · starts 19 Jun 2024

What is being bought

Published requirement description

The award of a contract by Education Authority Northern Ireland (EANI) without prior publication of a call for competition in the Official Journal of the European Union, in respect of the continued provision of a Term Service Contract for Electrical Maintenance and Minor Works (Belfast Region) Lot 2 as further described in OJEU Contract Notice and as outlined in the previous VEATs issued on 28 May 2021, 15 April 2022, 13 December 2022, September 2023 and 8 February 2024.

CPV: Building construction work

The lotProcurement structure

single lot · no lot value published
Lot #1The award of a contract by Education Authority Northern Ireland (EANI) without prior 1 yr 2 mo

The award of a contract by Education Authority Northern Ireland (EANI) without prior

publication of a call for competition in the Official Journal of the European Union, in respect

of the continued provision of a Term Service Contract for Electrical Maintenance and Minor

Works (Belfast Region) Lot 2 as further described in OJEU Contract Notice and as outlined

in the previous VEAT issued on 28 May 2021, 15 April 2022, 13 December 2022, 7 September 2023, 27 October 2023, 8 February 2024 and 12 April 2024.

Contract period: 19 Jun 2024 – 31 Aug 2025 (1 yr 2 mo)
Extensions: The previous VEAT 2024/S 000-004319 issued on 8 February 2024 extended this contract until 31 August 2025 with an option for the EANI to terminate, at its sole discretion, the contract by providing the contractor with written notice of its intention to terminate the contract. This option has not been exercised. Instead, this notice concerns EA’s intention, upon receipt of compelling evidence, to consider the review of certain prices in the price lists for specific elements of which the impact of inflation is higher than what could have reasonably and diligently anticipated. The overall nature of contract is not altered.

Procedure terms & legal framework

From the official record · publisher note attached
Procedure method
Award procedure without prior publication of a call for competition
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Works
Notice status
Awarded without competition
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Direct award (no call for competition)
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
12 Apr 2024, 17:07 BST
Last source update
18 Jun 2024, 16:59 BST
Authority reference
Belfast Electrical Lot 2
FTS notice number
2024/S 000-018823
Classification (CPV)
Building construction work
Delivery area
Northern Ireland (UKN)
Official registry OCID
ocds-h6vhtk-04520c Find a Tender
Why no open competition
The procurement falls outside the scope of application of the directive
Published justification

We refer to the previously issued VEAT Notice (2024/S 000-010445) published on 28 March 2024. The indices values referenced therein are incorrect and the EANI therefore publish this VEAT in order to rectify these indices values. Please disregard the previous VEAT.

To secure continuity, Task Orders issued on/after 1 July 2021 as per VEAT (2021/S 105-278050) will be adjusted for inflation, calculated with the BCIS Measured Term Contract Updating Percentages. Inflation from mid-point of original contract to 31 March 2021 is: PSA SOR ELEC11 Rate A, Rate B/D/E, Rate C 4.7 pct, 8.4 pct and 6.0 pct respectively, applies to Sections 1, 2, 3, 4, 5 and 6 of Price List; Rate B/D/E applies to Sections 3, 5 and 6; PSA SOR BCE15 5.5 pct applies to Section 7 Item OT020. Inflation after 1 April 2021 will be change in BCIS MTC Updating Percentages from 31 March 2021 indices based on TO issue date/latest published index. For travel expenses for Response Task Orders issued outside of the Lot received on or after 1 June 2022, an additional amount for travel has been included.

It is the EA’s intention, upon receipt of compelling evidence, to consider the review of certain prices in the price lists for specific elements of which the impact of inflation is higher than what could have reasonably and diligently anticipated. This includes:

Copper cabling comprising HV/LV cables: standard power cables 600/1000V, armoured and armoured: fire resistant, sizes exceeding 500mm² one core, 185mm² two core, 120mm² three core and 95mm² four core (Rate A only), Copper cabling comprising HV/LV cables: standard power cables 1900/3300V, armoured, sizes exceeding 150mm² one core and 120mm² two core (Rate A only), Surface trunking: steel; standard; one / two compartment; size 50 x 50 / 75 x 75 / 100 x 50 / 100 x 100; including lids and extra over items, i.e. accessories (Rate A only), 600 / 1000 V: armoured insulated cable to BS 7846: fire resistant to BS 6387 category CWZ, BS EN 50200 PH60, BS 8434-1 30 minutes, BS EN 60332-1-2, BS EN 60332-3-24: low emission of smoke and corrosive gases when affected by fire to BS EN 61034-2,BS EN 60754-1 and 2; four core; size 10mm2 / 16mm2 / 25mm2 (Rate A only), Insulation; aluminium foil; joints sealed with tape and banded around pipe and fittings; all sizes / thickness (Rate A only), Flexible conduit; metallic; steel; size 20mm (Rate A only), Cable tray; perforated galvanised steel; plain flange edge; light / medium / heavy duty; width 50mm / 100mm / 150mm including ventilated cover and extra over items, i.e. accessories (Rate A only), Cable tray; wire basket; zinc plated steel; not exceeding 30mm deep / 30 to 60mm deep / 60 to 110mm deep; width 50mm / 100mm / 150mm; including extra over items, i.e. accessories (Rate A only), 450 / 750 V: wiring cable: insulated and sheathed flame retardant to BS EN 60332-1-2: low emission of smoke and corrosive gases when affected by fire to BS EN 61034-2 and BS EN 60754-1 and 2; single core to BS 7211: flame retardant to BS EN 60332-1-2; two / three / four core screened: flame retardant to BS EN 60332-1-2 and BS EN 60332-3-4: size 1.5mm2 or greater (Rate A only), 600 / 1000 V: armoured insulated cable to BS 7846: fire resistant to BS 6387 category CWZ, BS EN 50200 PH60, BS 8434-1 30 minutes, BS EN 60332-1-2, BS EN 60332-3-24: low emission of smoke and corrosive gases when affected by fire to BS EN 61034-2,BS EN 60754-1 and 2; 3 / 4 core; 1.5mm2 or greater (Rate A only), 600 / 1000 V: mains power cable: thermosetting insulated: steel wire armoured; three / four core; 6.0mm2 or greater (Rate A only) and Radiators: panel: steel; single and double convector; all sizes (Rate A only)

See continued in VI.3

Publisher note: It has become necessary for EANI to further increase the value and extend the period of this contract to 31 August 2025. EANI published VEAT Notice 2024/S 000-004319 on 8 February 2024 detailing their intention to extend to the value and time of the Contract. This was required as additional expenditure has been incurred due to an unforeseen additional budget release by which the consequent additional funding facilitated the performance of additional works and the unforeseen demand particularly in respect of response works and for works to accommodate children with Special Education Needs. These factors, combined with the continued effect of inflation which were not anticipated at the time of the original Contract Notice or subsequent VEAT Notices, has precipitated a more rapid consumption of the value of the contract stated in the previous VEAT Notice. . This extension of the contract is also required due to delays in the ongoing procurement process, which has had the ramification of consequent delays on the next phases of the procurement, which could not have been reasonably foreseen and which has resulted in the requirement to increase the value and period of this contract. . In addition to extending the value and time of the Contract, EANI issued a further VEAT 2024/S 000-012067 dated 12 April 2024 outlining their intention, upon receipt of compelling evidence, to consider the review of certain prices in the price lists for specific elements of which the impact of inflation is higher than what could have reasonably and diligently anticipated. The overall nature of contract is not altered. The relevant percentage indices to be applied in respect of each exceptional item are set out in the previously published VEAT Notice 2024/S 000-012067. . In applying for a price uplift in respect of these Exceptional items, the Contractor will have the choice to either claim the rates in the Price List applying the appropriate indexation percentage or claim under the Defined Costs. If the price of an Exceptional Item has been previously agreed, the Contractor may continue to claim at this rate. The Contractor is not required to produce evidence if they do not wish to avail of the Defined Costs. . Regulation 72(1)(c) permits the above modifications, including the change to the uplift mechanism for exceptional items, the increase in value of the Contract and the extension of the Contract, due to unforeseen circumstances which a diligent contracting authority could not have foreseen. In addition the overall nature of the contract is not altered and Modification value is GBP 4 000 000 which does not exceed 50 % of the original contract value. This contingency includes sums to permit work in other Lots (as per the contract and Regulation 72 (1)(a)). . The uplift to the contract value also being sought as a precautionary measure to ensure continued service delivery of the SEN placement programme and in particular the potential of further ongoing response maintenance works as may be required before the contract expiry. . In order to provide continued access to schools and the scale, complexity and nature of the construction works and possible duplication of costs it is not possible to change the current provider. Regulation 72(1)(b) further permits this as a change of provider: . (i) cannot be made for economic and technical reasons as requirements of interchangeability or interoperability of services procured under the original procurement and given the need to ensure continued access to EANI schools and facilities and could result in partial/total closure of schools; and . (ii) will cause significant inconvenience and duplication of costs. . EANI envisages new contract award by no later than 31/08/25 and the contract extension shall permit the contracting authority to terminate the contract before this date upon the provision of three months’ notice.

How it was run

Official notice
Submission deadline
—

Timeline

18 Jun 2024 → 19 Jun 2024 · 2 dates
  1. Notice published
    18 Jun 2024, 16:59 BST
  2. Contract starts
    19 Jun 2024, 00:00 BST

Notice history

1 event · 2 releases on Find a Tender
  1. Buyer details updated
    18 Jun 2024, 16:59 BST

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 2
Awarded value £43,265,0012 contracts exc. VAT
Contracts signed 2latest 12 Apr 2024
Awarded toValueDateStatus
Irwin ME LtdSME£1 †—Awarded
Irwin ME LtdSME£43,265,000 †—Awarded

Contracts

  • Contract 012067-2024-1 · Irwin ME LtdSME

    Signed
    12 Apr 2024
    Value
    £1
    Period
    … – 31 Aug 2025
    Status
    active
  • Contract 018823-2024-2024/S 000-012067-1 · Irwin ME LtdSME

    Signed
    28 Mar 2024
    Value
    £43,265,000
    Period
    19 Jun 2024 – 31 Aug 2025
    Status
    active
    • Change Nature and extent of the modifications (with indication of possible earlier changes to the contract): The previous VEAT 2024/S 000-004319 issued on 8 February 2024 extended this contract until 31 August 2025 with an option for the EANI to terminate, at its sole discretion, the contract by providing the contractor with written notice of its intention to terminate the contract. The VEAT also detailed an increase to the value of the contract of 4,000,000.00 GBP which does not exceed 50 % of the original contract value. This Notice concerns the above modifications along with the previous VEAT Notice 2024/S 000-012067 issued on 12 April 2024 detailing EANI’s intention, upon receipt of compelling evidence, to consider the review of certain prices in the price lists for specific elements of which the impact of inflation is higher than what could have reasonably and diligently anticipated. The overall nature of contract is not altered. The total value of the extension is 4,000,000.00GBP. Further information in VI.3 Additional Information section, Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: See information in VI.3 Additional Information section

Contracting authority & participating public bodies

2 public bodies on the notice

the Education Authority

Contracting authorityCentral Government 40 Academy Street, Belfast, Northern Ireland, BT1 2NQContact email

Consortium members and other public bodies

  • Education Authority NIContracting authorityBody governed by public lawEducation Belfast, Northern IrelandContact email

Dispute resolution & review bodies

  • The UK does not have any special review body with responsibility for appeal/mediation procedures in public procurement competitionsReview body Belfast

Bidders & participating suppliers

1 commercial party on the notice
  • Irwin ME LtdAwarded supplier Portadown, Northern IrelandContact email

Official documents & specifications