Procurement for the Design, Supply, Installation and Commissioning of Hydrogen Equipment for the Purpose of Production, Compression, Storage and Dispensation of Hydrogen Fuel (“Hydrogen Technology Package”) (Revised Tender)
Engineering design services
Engineering services
Fuel-gas systems
+4 more
Published value
Not published
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: Bp Aberdeen Hydrogen Energy Limited: "Procurement for the Design, Supply, Installation and Commissioning of Hydrogen Equipment for the Purpose of Production, Compression, Storage and Dispensation of Hydrogen Fuel (“Hydrogen Technology Package”) (Revised Tender)". Published status: complete. Published value: Value not published. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
| Contracting Authority | Bp Aberdeen Hydrogen Energy Limited | Scope & Categories | Not published | Submission Window | complete No deadline published |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | Not published |
Bidder Intelligence · Authority Profile: Bp Aberdeen Hydrogen Energy Limited
Market Analytics
Derived from OCDS awards & bid statistics
Published history for Bp Aberdeen Hydrogen Energy Limited. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Competition Density
4Bids / Report
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate availablePayment Terms
Check noticePublished terms
Coverage: 1 active published awards; 1 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityBp Aberdeen Hydrogen Energy Limited | Procedure methodNot published | Procurement categoryNot published |
Statuscomplete | Framework / DPSNot published | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published26 Sept 2024, 16:17 BST | Last source update26 Sept 2024, 16:17 BST | Recurring procurementNot published |
ClassificationEngineering design services, Engineering services, Fuel-gas systems, Hydrogen, Installation services of electrical and mechanical equipment, Miscellaneous engineering services, Other sources of energy supplies and distribution | ||
Delivery area | ||
OCIDocds-h6vhtk-03c639 | ||
What is being bought
Please note this is a revised tender, following the decision to discontinue tender ref 20230214-000004 (2023/S 000-004438).
bp Aberdeen Hydrogen Energy Limited (bpAHEL) is a Joint Venture (JV) between bp and Aberdeen City Council (ACC), secured through a public procurement process. The JV has been created with the purpose of delivering a scalable green hydrogen production, storage and distribution facility in the city powered by renewable energy. The facility is targeting manufacture and dispensing of between 770 kilograms (min.) and 1000 kilograms (peak) of green hydrogen per day – enough to fuel 25 buses and a range of other fleet vehicles.
This contract notice relates to the following scope of work:
Optimised and integrated design, supply, installation, testing and commissioning of the following, to produce and dispense the required volume and rates, at the required quality, of hydrogen per day:
- Hydrogen electrolyser and associated power unit
- Ancillary package equipment (i.e., compression, conditioning, storage, as required)
- Refueling/dispensing hub for vehicles
- Interconnections between supplied packages including pipework, cabling etc.
- Control Alarms and Safety Instrumented Systems (SIS), Fire & Gas, Emergency Shutdown etc., as per referenced control philosophy and as vendor deems necessary. (Capable of being integrated into a wider site SCADA system.)
- Clearly defining any utility requirements (power/water) and working with others to ensure seamless integration.
- Allowance for hydrogen import facilities
What changed
From the official release history
- Status changed to complete
26 Sept 2024, 16:17 BST - Official notice release published
26 Sept 2024, 16:17 BST - Submission deadline changed to published date
26 Sept 2024, 16:17 BST - Status changed to active
17 May 2023, 08:47 BST - Official notice release published
17 May 2023, 08:47 BST - Submission deadline changed to 16 Jun 2023, 17:00 BST
17 May 2023, 08:47 BST - Buyer information updated
17 May 2023, 08:47 BST - Status changed to planned
4 May 2023, 10:45 BST - Official notice release published
4 May 2023, 10:45 BST - Buyer information updated
4 May 2023, 10:45 BST
Lots and requirements (1)
Published by the contracting authority
- Lot 1 · #1Individual lot title not publishedcancelledPublished valueNot publishedDescription of Scope bpAHEL intend to conduct a procurement for the provision of the required hydrogen technology (electrolyser unit) and hydrogen refueling station (compression, storage, dispensation, as required). An output-based specification has been developed and Client is looking for a safe, reliable, and operable system based on the most-competitive industry-led, standardized offering from the tendering process, considering the specifications within the project brief but also the bidder's own capability and experience, supplier relationships, proprietary technology, and knowledge of delivering cost effective hydrogen solutions within the current environment. It is recognized that there will be options to improve in certain areas of the project, such as plant availability, redundancy, delivery schedule, etc., and these will be evaluated post-contract award in collaboration with chosen Contractor through appropriate cost benefit analysis. The Contractor will be responsible for the finalised design, specification, supply, installation, testing and commissioning of the specialist hydrogen equipment within the proposed project scope, and will provide and undertake the following within the scope of supply: - Design & Engineering of the scheme as a “system” including technical safety, process, mechanical, piping, structural, control, automation & instrumentation - The system should be provided with its own local control & automation whilst being capable of integration to a wider SCADA system including external signalling for remote control and monitoring - Project management - Project controls including estimating, scheduling, cost, risk and performance management and reporting - HSEQ management systems, including Design and Construction under the CDM legislation - Attendance and facilitation of reviews including design, scheme, constructability, Operations & Maintenance, logistics, etc. - Interface management and liaising with Other Contractors to ensure design is integrated to overall project - Procurement & manufacturing - Offsite fabrication, manufacturing, assembly, and Factory Acceptance Testing (FAT) - Transport, logistics and shipping from factory to a site in Aberdeen - Offloading, unloading & final positioning - On site installation, testing, completions & commissioning - Records from design through procurement to construction & commissioning - Start-up & performance trials to ensure system meets functional specification - Operation procedures & maintenance manuals - Training and demonstration of the system - Liaise with the Client throughout project's lifecycle and obtain approval on technical deliverables including -but not limited to- calculations, drawings, technical notes, inspection and test plans etc. Further Information: If you are interested in this project but are unable to provide the full scope, please provide the following information to chris.gough@turntown.co.uk, kenzey.fordyce@bp.com and sam.munro@turntown.co.uk. - company name - contact details - summary of company capability relevant to this contract opportunity The information will be shared with other potential bidders via the etender system with a view to enabling interested parties to work together.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Procedure published
26 Sept 2024, 16:17 BST - Award active
Not published · Not published - Contract active
Signed 25 Jul 2024, 00:00 BST · Not published
Commercial outcome and competition
Awards Hydrasun Limited Not published · Not published · active |
Contracts Contract Not published · signed 25 Jul 2024, 00:00 BST · active |
Bid statistics highestValidBidValue: 12496577 lowestValidBidValue: 7836603 bids: 4 (lot 1) electronicBids: 4 (lot 1) foreignBidsFromEU: 1 (lot 1) foreignBidsFromNonEU: 3 (lot 1) highestValidBidValue: 12496577 (lot 1) lowestValidBidValue: 7836603 (lot 1) smeBids: 3 (lot 1) |
Buyer and organisations in this procedure
Bp Aberdeen Hydrogen Energy Limited
Contracting authority GB-FTS-82918Documents (0)
Official links; attachments are not copied
No linked documents are published
Related procedures (0)
No related procedures published