Official UK procurement notice
Procurement and Support of Replacement Second Naval Navigation Radar (SNNR) on T23 Frigates.
Authority: Defence Equipment and Support
What is being bought
Published requirement descriptionThe procurement and in service support of replacement Second Naval Navigation Radar (SNNR) for use on Royal Navy Type 23 Frigate.
CPV: Navigation equipment · Radar · Radar sets · Radar station construction work
The lotProcurement structure
single lot · no lot value publishedProcedure terms & legal framework
From the official record- Procedure method
- Direct award
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Works
- Notice status
- Awarded without competition
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Direct award (no call for competition)
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 8 Jul 2025, 10:55 BST
- Last source update
- 30 Aug 2026, 17:56 BST
- Authority reference
714960450- FTS notice number
2026/S 000-082397- Latest notice
- Contract details notice (UK7)
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-055ae6Find a Tender
- Why no open competition
- Single Suppliers Technical Reasons; Urgency; Defence Security Operational
- Published justification
MOD Voluntary Transparency Notice for the Maritime Radar Update Programme (MRUP)
Second Naval Navigation Radar (SNNR) T23 Frigates./LPD
- United Kingdom Ministry of Defence (the “Authority”) intends to place a contract with Hensoldt UK Limited (company number 06391386) (the “Company”) for Maritime Radar Update Programme (MRUP) Second Naval Navigation Radar (SNNR) used on Royal Navy T23 Frigates
- The planned term of the contract is for 5 years with two one-year option years (up to 7 years total). The estimated value of this contract is up to £3.5m
- The contract will be for the procurement and In Service Support of a Second Naval Navigation Radar (SNNR) for use on Royal Navy Type 23 Frigate/LPD. Options will apply to this procurement.
- This procurement falls to be regulated under the provisions of the Procurement Act 2023 and it is considered that the award of the contract without prior publication of a contract notice in Defence Sourcing Portal and the UK e-notification service (in accordance with the relevant legislation) is lawful in accordance with paragraph 6 of Schedule 5 of the Procurement Act 2023, due to an absence of competition for technical reasons .
a. The MRUP team are in an unusual and unplanned position whereby the current SNNR used on Royal Navy Type 23 Frigates is unsupported; as SNNR is a critical system this presents a significant risk to Navigational Safety for the T23 vessels and a risk to the operational capability of these Royal Navy vessels. The failure of a Navigation Radar will result in a high-level Operational Defect (OPDEF) and could prevent the ship sailing. With this in mind timescales to procure a replacement radar are of the upmost importance.
b.Due to the necessity to replace the radar at the earliest opportunity, the Authority will seek to limit any change on the platform. The Authority’s requirement is therefore for a radar which has identical properties to the current radar so as to enable the existing infrastructure on the platform to be used. This will remove the time required to undertake design work, and to model interaction with it and other systems. This approach will also ensure that the time required to update the radar on the platform is kept to the bare minimum and that the impact on platform readiness is limited, thereby enabling an update to be done whilst a vessel is operational. The Hensoldt S Band Turning Unit and Antenna is the only solution which meets the Authority’s requirement.
- This VEAT Notice is not a request for Expressions of Interest (EoI) so please do not apply to be invited to tender. This notice advises that the Authority has decided to negotiate a contract with the named supplier on a single source basis and is published for reasons of transparency. If you are interested in becoming a sub-contractor for this requirement, you should apply directly to the Company named above.
How it was run
Official notice- Submission deadline
- —
Timeline
8 Jul 2025 → 30 Aug 2026 · 4 dates- Planning notice published8 Jul 2025, 10:55 BST
- Next notice expected9 Jul 2025, 23:59 BST
- Contract starts397 days ago22 Sept 2025, 00:00 BST
- Latest notice published54 days ago30 Aug 2026, 17:56 BST
Notice history
8 events · 5 releases on Find a Tender · since 8 Jul 2025- Pipeline notice published8 Jul 2025, 10:55 BSTUK1
- Transparency notice published10 Jul 2025, 14:34 BSTUK5
- Status changed to complete10 Jul 2025, 14:34 BST
- Procurement method changed10 Jul 2025, 14:34 BST
- Transparency notice published2 Dec 2025, 08:43 GMTUK5
- Contract award notice published14 Jul 2026, 16:20 BSTUK6
- Contract signature expected27 Jul 2026, 23:59 BSTscheduled
- Contract details notice published30 Aug 2026, 17:56 BSTUK7
Routine re-releases (5)
- 2025-07: 2 releases · 8 Jul 2025, 10 Jul 2025
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| Kelvin Hughes LimitedSMEProcurement and Support of Replacement Second Naval Navigation Radar (SNRNR) on T23 Frigates27 Jul 2026 – 26 Jul 2031 · up to 26 Jul 2033Extensions: Two one-year option years · Options: Two one-year option years · Amended: Adjustment to note - Options will apply to this procurement. | £2,334,836 | 14 Jul 2026 | Awarded |
Contracts
Contract 1 · Kelvin Hughes LimitedSME
- Signed
- 30 Jul 2026
- Value
- £2,334,836
- Period
- 30 Jul 2026 – 30 Jul 2031 · up to 30 Jul 2033 with extensions
- Status
- active
- Extensions
- Contract Condition 48.5.1 a) i) and ii) extensions for Option Year 6 and Year 7.
- Options
- Contract condition 48.5.1 a) iii) to vii) Phase 1 Options iii) SoR 5.1.1a: MDMFD to additional T23. iv) Not Used v) SoR 5.2.1b: Technical Publication T23s (to BR format). vi) SoR 5.3.1a: Additional Operator and Maintainer Training. vii) SoR 5.6.1a: Security Testing Contract condition 48.5.1 b) i) to v) Phase 2 Options i) SoR 9.1.1(1): Replacing the existing T23 RT1084 equipment with new HUK equipment (Sharpeye System). ii) SoR 9.1.1(2): implementing RT1058 system improvements, as identified during the Phase 1 Concept Design Study (referenced at section 5.13.1 of the SoR). iii) SoR 9.1.1(3): A combination of (1) - Replacement of RT1084 and (2) - RT1058 system improvements. iv) SoR 9.1.2(1): PTP - Replacing the existing T23 RT1084 JUG console with new HUK MDMFD only. v) SoR 9.1.2(2): PTP - Replacing the existing T23 RT1084 equipment with new HUK MDMFD and Mk11 S Band Sharpeye
4 agreed KPIs: KPI 1 - Helpdesk Responsiveness & Resolution Plan · KPI 2 - Delivery of Availability · KPI 3 - Provision of Reports and Contract Deliverable Documents …
- KPI 1 - Helpdesk Responsiveness & Resolution Plan
- KPI 2 - Delivery of Availability
- KPI 3 - Provision of Reports and Contract Deliverable Documents
- KPI 4 - Response to TAFs and RFQs
Contracting authority & participating public bodies
Bidders & participating suppliers
1 commercial party on the notice- Kelvin Hughes LimitedAwarded supplier
Official documents & specifications (5)
Official links; attachments are not copiedNotices published for this procedure
- Contract details notice Contract details notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Transparency notice Transparency notice on Find a Tender
- Transparency notice Transparency notice on Find a Tender
- Pipeline notice Pipeline notice on Find a Tender