Find a TenderAwardedContract details notice
Published 24 Oct 2025, 09:42 BST

Official UK procurement notice

Strategic Design Partner to Support Deconversion - Framework Agreement

Official notice

Authority: United Kingdom National Nuclear Laboratory (Public body)·Consortium: 2 public authorities

Framework agreementServicesCompetitive flexible procedureAbove thresholdSME suitable
Framework ceiling (notional)£3,500,000framework ceiling, not attributable revenue
Submissions closed 16 Jan 2026awarded 27 Feb 2026
Awarded to NORTH WEST PROJECTS LIMITED (trading as ACTEMIUM DESIGN UK)
Framework period 4 yrsends 15 Mar 2030 · starts 16 Mar 2026

What is being bought

Published requirement description

Please note this notice is a copy of notice reference: 2026/S 000-027524 from March 2026, which is being republished to replace an incorrect notice reference: 2026/S 000-077106.

This Contract Award Notice confirms the appointment by UKNNL of a single supplier framework agreement to undertake the role of "Strategic Design Partner" to support UKNNL with HALEU Deconversion.

The Strategic Design Partner (SDP) Framework is intended to comprise of four stages, these are:

Stage 1: Defining Period

Stage 2: Preliminary Design

Stage 3: Detailed Design

Stage 4: Design Support During Manufacture

UKNNL will enter into a new call-off for each stage of work, UKNNL reserves the right to not award future call-offs and to amend the call-off schedule for alternative HALEU Deconversion related design work. UKNNL will continually assess Key Performance Indicators to inform decision making surrounding future call-offs.

  • How the procedure runs: The Competitive Flexible Procedure will consist of three distinct stages, allowing for an initial assessment of interested suppliers. A fourth stage is included as an optional stage and UKNNL reserves the right to add/remove additional stages including a negotiation stage as required. Suppliers will be evaluated against the specific objectives of the contract through the following stages: Stage 1: Procurement Specification Questionnaire (Shortlisting) - DEADLINE 28th November 2025 Stage 2: Supplier Presentations Stage 3: Final Tender - DEADLINE estimated to be 16th January 2026 Stage 4: Negotiation (optional stage used if required) Shortlisting will be to the highest ranked 5 suppliers. Should suppliers score equal in all questions, UKNNL may submit more or less suppliers through to Stage 2 and Stage 3. If negotiation is required, the preferred supplier identified in Stage 3 will proceed through to the negotiation stage. Interested parties should refer to the Invitation to Tender document on the e-tendering portal for full guidance on the procedure and associated evaluation criteria for all stages. UKNNL reserves the right to award the framework agreement before completing all stages should supplier numbers reduce to 1 and sufficient evaluation have been undertaken to determine if the supplier is able to offer the most advantageous tender. UKNNL will not be bound by the inclusion of the tenderer’s own terms and conditions in any part of the submission, unless expressly agreed to in writing. There is a known unknown risk that UKNNL may need to vary the scope of the framework to include design support to also support other deconversion related design support, outside of the rig design. Currently UKNNL cannot include this scope in the framework and do not know the scale and value of this risk. This risk if materialised may require a modification to the contract to expand the contract scope to include wider engineering-based activities. If this is required, the supplier will be made aware in writing and agreement on additional scope agreed via a call-off contract. If the risk materialised UKNNL will modify the contract where awarding a new contract would not be in the public interest.

CPV: Engineering design services

How this framework works

From the published notice
Type
Closed framework
Call-offs
call-offs are awarded directly to appointed suppliers, without further competition
Places
up to 1 suppliers · 5 bids received (5.0 per place) · 1 appointed (full)
Framework period
4 yrs from 16 Mar 2026
Published description of the framework

The framework is a single supplier framework, all awards are direct to that supplier.

The framework operates under an NEC PSC contract with the ability to contract using options A, C or E.

A rate card has been provided which is subject to increases as stipulated in the contract.

Call-offs published through it2

Notices that name this framework as their framework in the official record. Many call-offs are never published, so this is a floor, not utilisation.

The lotProcurement structure

single lot · value published
Lot #1Awarded 4 yrsSMEPublished value£3,500,000
Contract period: 16 Mar 2026 – 15 Mar 2030 (4 yrs)Value: £3,500,000 exc. VAT · £4,200,000 inc. VAT
Delivery: UK, North WestEligibility: SME eligible
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    Financial Capacity: Turnover Ratio Financial Capacity: Acid Ratio Insurances GDPR Refer to the tender documents for full details on the conditions of participation and evaluation criteria. The Procurement Specific Questionnaire includes the Conditions of Participation questions, this is used for shortlisting in stage 1.

  • Technical & professional ability

    Relevant Experience and Contract Examples Safety, Health and Wellbeing Nuclear Safety Culture Cyber Essentials Plus Refer to the tender documents for full details on the conditions of participation and evaluation criteria. The Procurement Specific Questionnaire includes the Conditions of Participation questions, this is used for shortlisting in stage 1.

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
Quality: 70%Price: 20%Social value: 10%
Published sub-criteria (4)
  • Technical Criteria: 60%
  • Programme: 10%
  • Commercial Evaluation: 20%
  • Social Value: 10%
Published award criteria (4)
  • Technical Criteria: For stage 3: final tender
  • Programme: For stage 3: final tender
  • Social Value: For stage 3: final tender
  • Commercial Evaluation: For stage 3: final tender
Conditions of participation2
  • Economic & financial standing

    Financial Capacity: Turnover Ratio Financial Capacity: Acid Ratio Insurances GDPR Refer to the tender documents for full details on the conditions of participation and evaluation criteria. The Procurement Specific Questionnaire includes the Conditions of Participation questions, this is used for shortlisting in stage 1.

  • Technical & professional ability

    Relevant Experience and Contract Examples Safety, Health and Wellbeing Nuclear Safety Culture Cyber Essentials Plus Refer to the tender documents for full details on the conditions of participation and evaluation criteria. The Procurement Specific Questionnaire includes the Conditions of Participation questions, this is used for shortlisting in stage 1.

What this means for your bid
  • Price carries 20 of 100 points: a 10% discount moves about 2 points. The method statement decides this lot, not the discount.
  • “Strategic Design Partner to Support Deconversion - Framework Agreement” is a framework: the contest is a place on its panel, up to 1 suppliers, not a single contract, and call-offs are awarded directly: getting appointed is the whole game.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Competitive flexible procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Services
Notice status
Awarded
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use the vehicle
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
24 Oct 2025, 09:42 BST
Last source update
20 Aug 2026, 12:39 BST
Award evaluation window
Submission end – 11 Mar 2026
Authority reference
NNLC661
FTS notice number
2025/S 000-072122
Latest notice
Contract details notice (UK7)
Classification (CPV)
Engineering design services
Delivery area
UKNorth West (UKD)
Official registry OCID
ocds-h6vhtk-05d301 Find a Tender
How it runs

The Competitive Flexible Procedure will consist of three distinct stages, allowing for an initial assessment of interested suppliers. A fourth stage is included as an optional stage and UKNNL reserves the right to add/remove additional stages including a negotiation stage as required. Suppliers will be evaluated against the specific objectives of the contract through the following stages: Stage 1: Procurement Specification Questionnaire (Shortlisting) - DEADLINE 28th November 2025 Stage 2: Supplier Presentations Stage 3: Final Tender - DEADLINE estimated to be 16th January 2026 Stage 4: Negotiation (optional stage used if required) Shortlisting will be to the highest ranked 5 suppliers. Should suppliers score equal in all questions, UKNNL may submit more or less suppliers through to Stage 2 and Stage 3. If negotiation is required, the preferred supplier identified in Stage 3 will proceed through to the negotiation stage. Interested parties should refer to the Invitation to Tender document on the e-tendering portal for full guidance on the procedure and associated evaluation criteria for all stages. UKNNL reserves the right to award the framework agreement before completing all stages should supplier numbers reduce to 1 and sufficient evaluation have been undertaken to determine if the supplier is able to offer the most advantageous tender. UKNNL will not be bound by the inclusion of the tenderer’s own terms and conditions in any part of the submission, unless expressly agreed to in writing. There is a known unknown risk that UKNNL may need to vary the scope of the framework to include design support to also support other deconversion related design support, outside of the rig design. Currently UKNNL cannot include this scope in the framework and do not know the scale and value of this risk. This risk if materialised may require a modification to the contract to expand the contract scope to include wider engineering-based activities. If this is required, the supplier will be made aware in writing and agreement on additional scope agreed via a call-off contract. If the risk materialised UKNNL will modify the contract where awarding a new contract would not be in the public interest.

Review and risk notes
Risks

There is a known unknown risk that UKNNL may need to vary the scope of the framework to include design support to also support other deconversion related design support, outside of the rig design. Currently UKNNL cannot include this scope in the framework and do not know the scale and value of this risk. This risk if materialised may require a modification to the contract to expand the contract scope to include wider engineering-based activities. If this is required, the supplier will be made aware in writing and agreement on additional scope agreed via a call-off contract. If the risk materialised UKNNL will modify the contract where awarding a new contract would not be in the public interest.

How it was run

Official notice
Run through: EU-Supply (CTM) · Who buys & how to bid on EU-Supply
Public notice page · account needed to bidElectronic submission allowedLanguage: EN
Access & registration note: Free · 5–10 minutes
Appointment period ends
16 Jan 2026, 13:00 GMT
Clarification deadline
28 Nov 2025, 13:00 GMT
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Timeline

24 Oct 2025 → 20 Aug 2026 · 11 dates
  1. Planning notice published357 days ago
    24 Oct 2025, 09:42 BST
  2. Market engagement344 days ago
    6 Nov 2025, 23:59 GMT

    UKNNL will be hosting a Market Engagement Session on MS Teams on Thursday 6th November from 11:00-12:00. Suppliers can sign-up to attend this market engagement/briefing session by emailing [email protected] and [email protected] confirming the names and email addresses of attendees. To engage with UKNNL suppliers must: 1. Sign-up to the engagement session 2. Attend the session 3. Provide feedback/ ask questions UKNNL wishes to confirm appetite in the market for this contract and ensure the contracting model is attractive to potential suppliers. If you would like to pre submit questions ahead of the call please email these to [email protected] and [email protected] . We plan to share the attendees list of the call with all attendees. If you do not wish for your details to be shared, please notify us when registering and we will remove your information from the list before distributing.

  3. Tender notice published343 days ago
    7 Nov 2025, 15:16 GMT
  4. Next notice expected343 days ago
    7 Nov 2025, 23:59 GMT
  5. Clarification questions by322 days ago
    28 Nov 2025, 13:00 GMT
  6. Admission / appointment period ends273 days ago · period end, not a bid countdown
    16 Jan 2026, 13:00 GMT
  7. Assessment summaries sent232 days ago
    27 Feb 2026
  8. Standstill ends220 days ago
    10 Mar 2026, 23:59 GMT
  9. Award decision expected by219 days ago
    11 Mar 2026, 23:59 GMT
  10. Contract starts215 days ago
    16 Mar 2026
  11. Latest notice published57 days ago
    20 Aug 2026, 12:39 BST

Notice history

13 events · 6 releases on Find a Tender · since 24 Oct 2025
  1. Preliminary market engagement notice published
    24 Oct 2025, 09:42 BST
    UK2
  2. Tender notice published
    7 Nov 2025, 15:16 GMT
    UK4
  3. Status changed to active
    7 Nov 2025, 15:16 GMT
  4. Procurement method changed
    7 Nov 2025, 15:16 GMT
  5. Deadline published: 16 Jan 2026, 13:00 GMT
    7 Nov 2025, 15:16 GMT
  6. Contract award notice published
    27 Feb 2026, 10:27 GMT
    UK6
  7. Status changed to complete
    27 Feb 2026, 10:27 GMT
  8. Procurement method changed
    27 Feb 2026, 10:27 GMT
  9. Buyer details updated
    27 Feb 2026, 10:27 GMT
  10. Contract signature expected
    11 Mar 2026, 23:59 GMT
    scheduled
  11. Contract details notice published
    25 Mar 2026, 16:38 GMT
    UK7
  12. Contract details notice published
    13 Aug 2026, 10:46 BST
    UK7
  13. Contract details notice published
    20 Aug 2026, 12:39 BST
    UK7
Routine re-releases (6)
  • 2026-02: 1 release · 27 Feb 2026
  • 2025-11: 1 release · 7 Nov 2025
  • 2025-10: 1 release · 24 Oct 2025

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 1admitted to the panel · see the list ↓
Bids received 5
Contracts signed 3latest 9 Jul 2026
Awarded toValueDateStatus
NORTH WEST PROJECTS LIMITED (trading as ACTEMIUM DESIGN UK)12 Mar 2026 – 11 Mar 2030£3,500,00027 Feb 2026Awarded

2 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.

Contracts

All 2 of these contracts carry the same published figure, £3,500,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.

  • Contract 2

    Signed
    9 Jul 2026
    Value
    £887,764
    Period
    13 Jul 2026 – 24 Feb 2027 · up to 31 Mar 2027 with extensions
    Status
    active
    Extensions
    The contract may be extended in accordance with the contract terms and conditions (NEC4 PSC).

    No agreed KPIs: Contract is not in excess of £5million.

  • Contract 1 · NORTH WEST PROJECTS LIMITED (trading as ACTEMIUM DESIGN UK)

    Signed
    13 Mar 2026
    Value
    ceiling above
    Period
    16 Mar 2026 – 15 Mar 2030
    Status
    active
  • Contract 3

    Signed
    13 Mar 2026
    Value
    ceiling above
    Period
    16 Mar 2026 – 15 Mar 2030
    Status
    active

Bid statistics published by the authority

BidsSMEVCSEValid bid range
5final-stage tenders00—

Contracting authority & participating public bodies

2 public bodies on the notice

UNITED KINGDOM NATIONAL NUCLEAR LABORATORY LIMITED

Contracting authorityPublic authority - sub-central government GB-COH: 03857752 · GB-PPON: PVXT-8784-YGNV Chadwick House Warrington Road, Warrington, North West, WA3 6AEContact email

Consortium members and other public bodies

Framework contractors & participating bidders

1 commercial party on the notice

Official documents & specifications (6)

Official links; attachments are not copied

Notices published for this procedure