Precast Slab Track System

Official notice

Authority: High Speed Two (HS2) Limited (Public body)

Goods
Awarded value£292,000,000published contract · exc. VAT
Awarded 12 Dec 2020
Awarded to PORR UK Ltd
Contract term 8 yrs 2 moends 1 Apr 2029 · starts 18 Jan 2021

What is being bought

Published requirement description

No description was published on the notice. See the official documents.

CPV: Transport equipment and auxiliary products to transportation

The lotProcurement structure

single lot · no lot value published
Lot #1Contract to design, manufacture and supply precast concrete track slabs for the open… 8 yrs 2 mo

Contract to design, manufacture and supply precast concrete track slabs for the open route sections of HS2 Phase 1 and 2a and the further provision of identical slabs for the standard slab track tunnel sections on the same route, including installation training and quality support services.

Contract period: 18 Jan 2021 – 1 Apr 2029 (8 yrs 2 mo)
Delivery: UK

Procedure terms & legal framework

From the official record · publisher note attached
Legal basis
CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
Procurement category
Goods
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
24 Nov 2021, 22:45 GMT
Last source update
24 Nov 2021, 22:45 GMT
FTS notice number
2021/S 000-029302
Classification (CPV)
Transport equipment and auxiliary products to transportation
Delivery area
UK
Official registry OCID
ocds-h6vhtk-02f9e5 Find a Tender

Publisher note: HS2 considers that the intended modification described in this notice is not substantial within the meaning of Regulation 88.7 of the Utilities Contracts Regulations 2016. In addition, this modification may fall into the category of modifications in Regulation 88.1(b) of the Utilities Contracts Regulations 2016 (and this has been noted in VII.2.2 below). In any event, HS2 considers that the intended modification falls within the scope of the original contract notice published in the Official Journal of the European Union and HS2 is therefore publishing this notice in the interests of completeness and transparency. HS2 reserves all its rights in respect of the reasons for this publication and whether it is legally obliged to publish such a notice. All values given in this notice are approximate and the best estimates of HS2 at the time of publication of this Notice. HS2’s decision to publish this notice does not constitute any waiver of any rights it may have or impose any further obligations on it in respect of any future contract modifications and the publication thereof.

How it was run

Official notice
Submission deadline
—

Timeline

18 Jan 2021 → 24 Nov 2021 · 2 dates
  1. Contract starts
    18 Jan 2021
  2. Notice published
    24 Nov 2021, 22:45 GMT

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 1
Awarded value £292,000,0001 contract exc. VAT
Contracts signed 1latest 12 Dec 2020
Awarded toValueDateStatus
PORR UK Ltd£292,000,000 †—Awarded

Contracts

  • Contract 029302-2021-C1186-1 · PORR UK Ltd

    Signed
    12 Dec 2020
    Value
    £292,000,000
    Period
    18 Jan 2021 – 1 Apr 2029
    Status
    active
    • Change The new value of the contract in VII.1.6 is the estimated maximum new value, but the value of the additional work may range from nil to 38000000 GBP. The purpose of the modification is to permit HS2 to instruct its Track Systems Contractors to procure slab track supplies for the tunnel sections of the current route through this contract rather than through their own supply arrangements. Please note that the values in this notice are in relation to the core goods and services and exclude the optional services available to the Track Systems Contractors related to logistics. The value of optional services was originally 13000000 GBP in addition to the 260000000 GBP total contract value, and the estimated maximum new value of these optional services is 15000000 GBP in addition to the Total contract value after the modifications of 292000000 GBP; but the value of additional optional work may range from nil to 2000000 GBP., Need for additional works, services or supplies by the original contractor/concessionaire: The new value of the contract in VII.1.6 is the estimated maximum new value, but the value of the additional work may range from nil to 38000000 GBP. The purpose of the modification is to permit HS2 Ltd to instruct its Track Systems Contractors to procure additional slab track supplies through this contract for the tunnel sections of the current route rather than through their own supply arrangements.

Contracting authority & participating public bodies

HS2

Contracting authorityPublic body High Speed Two (HS2) Ltd, Two Snowhill, Queensway, Birmingham, UKContact email

Dispute resolution & review bodies

  • The High CourtReview body London

Bidders & participating suppliers

1 commercial party on the notice

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.