PQQ PRINCIPAL CONTRACTOR ACCESS INFRASTRUCTURE AND TIMBER POND INFILL, PEMBROKE DOCK MARINE

Official notice

Authority: Milford Haven Port Authority (Public body)

WorksCompetitive procedure with negotiation
Budget not disclosedValue not published
Awarded 7 Apr 2021
Awarded to BAM Nuttall Limited

What is being bought

Published requirement description

The Access Infrastructure and Timber Pond Infill project is a key part of the Pembroke Dock Marine Development and will specifically include the construction of

the following elements:

  1. A new supersize access slipway, and
  2. A new workboat berthing facility.
  3. Bulk infilling and surcharging of existing Timber Pond with excavated material

The Port has appointed a Lead Consultant for the Detail Design of the slipway and berthing facility structures and will subsequently issue an ITT for the Construction Works for each of the elements listed above. Interested parties will be expected to have substantial experienced in the successful delivery of large Civil Engineering Marine projects.

The PQQ documentation can be accessed by pasting the link below into your internet browser.

mhpa.sharepoint.com/:f:/s/O365Tenders/Es… ↗

CPV: Works for complete or part construction and civil engineering work

The lotProcurement structure

single lot · no lot value published
Lot #1The Port of Milford Haven is a trust port and is the UK’s top energy port and Wales’…Awarded

The Port of Milford Haven is a trust port and is the UK’s top energy port and Wales’ busiest port handling around 20% of Britain’s seaborne trade in oil and gas. The Port of Milford Haven also owns and operates Pembroke Port and Milford Dock.

The Port of Milford Haven has prepared a Development Plan for the strategic improvement of Pembroke Port, aligning itself with the Swansea Bay City Deal, named Pembroke Dock Marine. This UK and Welsh Government supported project will support the diversification of a strategic UK fossil fuel energy hub into a centre for the renewable energy industry. This will protect both the region and UK in terms of energy security, economy and inclusivity while also working towards achieving decarbonisation targets.

Pembroke Dock Marine comprises four separate but interrelated elements that together will build on an existing energy cluster that has grown around the Pembroke Dock area, in order to develop a world class centre for blue economic development.

The ERDF funded Pembroke Dock Access Infrastructure project is a key part of the Pembroke Marine Project and will specifically include

the construction of the following:

  1. A new supersize access slipway,
  2. A new workboat berthing facility, and.
  3. Infilling of the existing timber pond.

The Principal Contractor appointed must have substantial experience in the successful delivery of a large Civil Engineering Marine Project or Projects with a value in excess of 10 million GBP.

The slipway construction will involve demolition, capital dredging, piling, excavation, the construction of retaining walls and a new supersize concrete slipway together with associated Temporary works, repairs to existing Quay walls, electrical and water distribution, network communications, SCADA and CCTV/security systems and the sequencing of the construction works to minimise disruption to the existing slipway operations.

The new workboat facility will involve modification of the existing Tee-Head building structure and access facility, structural modifications to the existing Ferry Terminal dolphins, new structural steel installations, the provision and fixing of 140m of new pontoon mooring facilities and restraints, together with the installation of electrical and water distribution, network communications, SCADA and CCTV/security systems.

The timber pond infilling involves the deposition into the existing pond of approx. 40,000 m3 and the surcharging of a further (approx.) 15,000 m3 of excavated material with a significant component of rock (to be crushed on site as part of the works). The infill requires to be designed to achieve a controlled settlement with fill laid over a protective sand layer and carefully compacted in layers to accommodate a future construction of a large Fabrication Building over the former pond (not within the scope of the works).

The Timber Pond is a Grade II listed structure and it is anticipated that key features such as the existing limestone retaining wall and sloping stone revetment will be retained and protected or otherwise subject to minimal and localised disturbance through the works where this is unavoidable.

The successful contractor will be appointed as the Principal Contractor and compliance with all H&S Environmental and Ecological legislation, WEFO and SBCD Procurement Procedures and Cross Cutting Themes will be mandatory.

The works will be undertaken under the NEC3 suite of contracts and the successful contractor will be expected to work collaboratively with the Client and its appointed Engineering Design Consultants, Environmental and Ecological Consultants, Project Manager, NEC Supervisor and Quantity Surveyor throughout the project.

Timescales:

It is anticipated the Construction Works contract will start in Q2 2021. However, ECI in the Design Process will be expected in Q1 2021.

Following evaluation of the PQQ returns it is envisaged a minimum number four and maximum number of 6 contractors will be invited to tender (ITT) for stage 2.

Delivery: Wales · Pembroke Dock

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
Quality: 65%Price: 35%
Published sub-criteria (9)
  • Waste Management Plan: 5%
  • Project Execution Plan: 10%
  • Delivery within budget: 10%
  • ECI and COnstruction phase programmes: 10%
  • CVs: 5%
  • Protection of listed structures: 5%
  • Collaborative working during ECI: 10%
  • Risks/opportunities: 10%
  • price: 35%
Published award criteria (9)
  • Waste Management Plan: 5
  • Project Execution Plan: 10
  • Delivery within budget: 10
  • ECI and COnstruction phase programmes: 10
  • CVs: 5
  • Protection of listed structures: 5
  • Collaborative working during ECI: 10
  • Risks/opportunities: 10
  • Price: 35
What this means for your bid
  • Price carries 35 of 100 points: a 10% discount moves about 3.5 points. The method statement decides this lot, not the discount.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record · publisher note attached
Procedure method
Competitive procedure with negotiation
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Works
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
3 Jun 2021, 16:34 BST
Last source update
3 Jun 2021, 16:34 BST
FTS notice number
2021/S 000-012481
Classification (CPV)
Works for complete or part construction and civil engineering work
Delivery area
Wales (UKL1)
Official registry OCID
ocds-h6vhtk-02b833 Find a Tender

Publisher note: The PQQ can be access at the following link: https://mhpa.sharepoint.com/:f:/s/O365Tenders/EsdPF-WoVEdGm4L-GCv1dx8BGlChyd-M37Ij1Aknr1D-xw?e=8YMxIT NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=102420. (WA Ref:109712)

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 1
Bids received 3
Contracts signed 1latest 7 Apr 2021
Awarded toValueDateStatus
BAM Nuttall Limited——Awarded

Contracts

Bid statistics published by the authority

LotBidsSMEVCSEValid bid range
The Port of Milford Haven is a trust port and is the UK’s top energy port and Wales’…3bids · 3 electronic · 3 from abroad0—£14,761,635 – £17,195,930
Whole notice———£14,761,635 – £17,195,930

Contracting authority & participating public bodies

2 public bodies on the notice

Milford Haven Port Authority

Contracting authorityPublic bodyPortPilotage Services Gorsewood Drive, Milford Haven, Pembrokeshire, Wales, SA73 3ERContact name, email, phone

Other public bodies

  • European UnionFunder

Dispute resolution & review bodies

  • High CourtReview body LondonContact phone

Bidders & participating suppliers

1 commercial party on the notice
  • BAM NuttallAwarded supplier St James House, Camberley, South East, GU153xwContact phone

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.