Port of Dover Maintenance Dredging 2023

Marine services
Published value
Not published
Submission deadline 27 Apr 2023, 01:00 BST
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: Dover Harbour Board: "Port of Dover Maintenance Dredging 2023". Published status: active. Published value: Value not published. 1 published lot. Recorded submission deadline: 27 Apr 2023, 01:00 BST. See the official notice for participation instructions.
Contracting AuthorityDover Harbour BoardScope & CategoriesNot publishedSubmission Window
Closed
27 Apr 2023, 01:00 BST
Submission GatewayDirect notice routeLegal Basis & RegimeStandard procurementEstimated Value (exc. VAT)Not published
Bidder Intelligence · Authority Profile: Dover Harbour Board
Market Analytics
View Authority Profile →
Derived from OCDS awards & bid statistics
Published history for Dover Harbour Board. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Requires at least 5 comparable procedures
Competition Density
Not availableNo published reports
Bid counts are not published for this buyer
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate available
Payment Terms
Check noticePublished terms
Payment obligations depend on the applicable regime and contract. Consult the official documents.
Coverage: 2 active published awards; 0 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityDover Harbour Board
Procedure methodNot published
Procurement categoryNot published
Statusactive
Framework / DPSNot published
CompetitionNot published
Above thresholdNot published
Legal basisNot published
Tender period startsNot published
Clarification deadlineNot published
Electronic submissionNot published
Submission languagesNot published
Published27 Mar 2023, 15:52 BST
Last source update27 Mar 2023, 15:52 BST
Recurring procurementNo
ClassificationMarine services
Delivery area
OCIDocds-h6vhtk-03b65e
What is being bought
The works consist of the maintenance dredging of the berth, basins and approaches in the Port of Dover. The primary scope of works is the restoration of advertised depths within the Inner Harbour, Outer Harbour and the Eastern Docks. Dredging shall be carried out by trailing suction hopper dredger only. Bed levelling is also permitted. The sediment sample test results classify the sediment as the fine sandy silt. With respect to disposal, material from the Port of Dover can only be placed at the designated offshore disposal site, DV010. Any navigation beacons which have to be removed in connection with the Contract will be removed and re-established by the Contractor. Pre and post dredge formal contract surveys using a multi-beam echo sounder, resulting in near total seabed coverage, shall be commissioned by the Employer from an independent survey Contractor.
What changed
From the official release history
  1. Status changed to active
    27 Mar 2023, 15:52 BST
  2. Official notice release published
    27 Mar 2023, 15:52 BST
  3. Submission deadline changed to 27 Apr 2023, 01:00 BST
    27 Mar 2023, 15:52 BST
  4. Buyer information updated
    27 Mar 2023, 15:52 BST
Lots and requirements (1)
Published by the contracting authority
  • Lot 1 · #1
    Individual lot title not published
    active
    Published valueNot published
    The works consist of the maintenance dredging of the berth, basins and approaches in the Port of Dover. The primary scope of works is the restoration of advertised depths within the Inner Harbour, Outer Harbour and the Eastern Docks. Dredging shall be carried out by trailing suction hopper dredger only. Bed levelling is also permitted. The sediment sample test results classify the sediment as the fine sandy silt. With respect to disposal, material from the Port of Dover can only be placed at the designated offshore disposal site, DV010. Any navigation beacons which have to be removed in connection with the Contract will be removed and re-established by the Contractor. Pre and post dredge formal contract surveys using a multi-beam echo sounder, resulting in near total seabed coverage, shall be commissioned by the Employer from an independent survey Contractor.
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
Timeline
  1. Procedure published
    27 Mar 2023, 15:52 BST
  2. Submission deadline
    27 Apr 2023, 01:00 BST
Commercial outcome and competition
AwardsNo award published
ContractsNo contract published
Bid statisticsNo aggregate bid statistics published
Buyer and organisations in this procedure

Dover Harbour Board

Contracting authority GB-FTS-11952
View buyer profile
Documents (0)
Official links; attachments are not copied
No data
No linked documents are published
Related procedures (0)
No data
No related procedures published