TenderlineUK
Procurement Intelligence
Official OCDS
Find a Tender
planned
Official procurement procedure

PEACEPLUS Works Contractor for Reconnected Belfast Project at Waterworks and Alexandra Park

Construction work
Construction work of leisure facilities
Installation of street furniture
+5 more
UK
Published value
£10,700,000
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: Belfast City Council: "PEACEPLUS Works Contractor for Reconnected Belfast Project at Waterworks and Alexandra Park". Published status: planned. Published value: £10,700,000. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
Contracting AuthorityBelfast City CouncilScope & CategoriesNot publishedSubmission Window
planned
No deadline published
Submission GatewayDirect notice routeLegal Basis & RegimeStandard procurementEstimated Value (exc. VAT)£10,700,000
Bidder Intelligence · Authority Profile: Belfast City Council
Market Analytics
View Authority Profile →
Derived from OCDS awards & bid statistics
Published history for Belfast City Council. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Requires at least 5 comparable procedures
Competition Density
6.1Bids / Report
44.8% of reports have one bid
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate available
Payment Terms
Check noticePublished terms
Payment obligations depend on the applicable regime and contract. Consult the official documents.
Coverage: 58 active published awards; 58 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityBelfast City Council
Procedure methodNot published
Procurement categoryNot published
Statusplanned
Framework / DPSNot published
CompetitionNot published
Above thresholdNot published
Legal basisNot published
Tender period startsNot published
Clarification deadlineNot published
Electronic submissionNot published
Submission languagesNot published
Published5 Dec 2025, 10:17 GMT
Last source update5 Dec 2025, 10:17 GMT
Recurring procurementNot published
ClassificationConstruction work, Construction work of leisure facilities, Installation of street furniture, Landscaping work for green areas, Pedestrian zone construction work, Repair and maintenance work in connection with sports facilities, Reservoir construction works, Surface work for highways
Delivery area
UK
OCIDocds-h6vhtk-05ef60
What is being bought
The Project focuses on re-generating Waterworks and Alexandra Park, the objective of the project is to increase cross-community integration through a transformed shared space in north Belfast, which will enable 33.18 hectares of parkland space to be upgraded and capable of facilitating participation of thousands of people from all communities. Improvements at Waterworks Park comprise the demolition of the existing Waterworks Bothy and replacement with a new building to include public toilets, Changing Places, multi-purpose community room and kitchenette, extension to existing Cavehill Road gatehouse building, entrance improvements, new events space including multipurpose decking, resurfacing of footways, new pedestrian lighting along key routes, a dog park, replacement platforms and viewing area, replacement surface to existing small sided 3G pitch, and upgrades to existing Queen Mary’s playground. Improvements at Alexandra Park include the resurfacing of footways, new pedestrian lighting along key routes, new reinforced grass event space, new lake viewing area, new public toilets and changing places, entrance improvements, 2no existing bridges replaced, new pedestrian entrance, new multi-sport synthetic surface with cover, and upgrades to existing play parks. Streetscape improvements along Camberwell Terrace and Castleton Gardens include resurfacing of footways with new kerbs; resurfaced carriageways and new tactile paving at pedestrian crossings; and all associated works. Additionally, works include refurbishment and safety works to the Waterworks upper and lower reservoirs, and Alexandra Park lake reservoir, to be complemented with wider environmental, landscape and connectivity improvements. The proposed reservoir works comprise of a new overflow structure with reinforcement and protection of the return embankment parallel to the bywash channel at Waterworks Upper reservoir, repairs to the upstream face of Waterworks Lower reservoir with the addition of wetland planting to reduce the overall capacity of the reservoir, and removal of an existing parapet wall and embankment reinforcement at the Alexandra Park Lake reservoir.
What changed
From the official release history
  1. Published value updated to £10,700,000
    5 Dec 2025, 10:17 GMT
  2. Status changed to planned
    5 Dec 2025, 10:17 GMT
  3. Official notice release published
    5 Dec 2025, 10:17 GMT
  4. Buyer information updated
    5 Dec 2025, 10:17 GMT
Lots and requirements (1)
Published by the contracting authority
  • Lot 1 · #1
    Individual lot title not published
    planned
    Published valueNot published
    The Project focuses on re-generating Waterworks and Alexandra Park, the objective of the project is to increase cross-community integration through a transformed shared space in north Belfast, which will enable 33.18 hectares of parkland space to be upgraded and capable of facilitating participation of thousands of people from all communities. Improvements at Waterworks Park comprise the demolition of the existing Waterworks Bothy and replacement with a new building to include public toilets, Changing Places, multi-purpose community room and kitchenette, extension to existing Cavehill Road gatehouse building, entrance improvements, new events space including multipurpose decking, resurfacing of footways, new pedestrian lighting along key routes, a dog park, replacement platforms and viewing area, replacement surface to existing small sided 3G pitch, and upgrades to existing Queen Mary’s playground. Improvements at Alexandra Park include the resurfacing of footways, new pedestrian lighting along key routes, new reinforced grass event space, new lake viewing area, new public toilets and changing places, entrance improvements, 2no existing bridges replaced, new pedestrian entrance, new multi-sport synthetic surface with cover, and upgrades to existing play parks. Streetscape improvements along Camberwell Terrace and Castleton Gardens include resurfacing of footways with new kerbs; resurfaced carriageways and new tactile paving at pedestrian crossings; and all associated works. Additionally, works include refurbishment and safety works to the Waterworks upper and lower reservoirs, and Alexandra Park lake reservoir, to be complemented with wider environmental, landscape and connectivity improvements. The proposed reservoir works comprise of a new overflow structure with reinforcement and protection of the return embankment parallel to the bywash channel at Waterworks Upper reservoir, repairs to the upstream face of Waterworks Lower reservoir with the addition of wetland planting to reduce the overall capacity of the reservoir, and removal of an existing parapet wall and embankment reinforcement at the Alexandra Park Lake reservoir.
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
Timeline
  1. Procedure published
    5 Dec 2025, 10:17 GMT
Commercial outcome and competition
AwardsNo award published
ContractsNo contract published
Bid statisticsNo aggregate bid statistics published
Buyer and organisations in this procedure

Belfast City Council

Contracting authority GB-FTS-21397
View buyer profile
Documents (0)
Official links; attachments are not copied
No data
No linked documents are published
Related procedures (0)
No data
No related procedures published