PE0715 Wavenet –Managed Internet Service and Cabling
No classification published
Location not published
Published value
Not published
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: Peabody Trust: "PE0715 Wavenet –Managed Internet Service and Cabling". Published status: complete. Published value: Value not published. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
| Contracting Authority | Peabody Trust | Scope & Categories | Not published | Submission Window | complete No deadline published |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | Not published |
Bidder Intelligence · Authority Profile: Peabody Trust
Market Analytics
Derived from OCDS awards & bid statistics
Published history for Peabody Trust. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Average Price Reduction
Not availableInsufficient comparable data
Competition Density
4.5Bids / Report
Supplier ConcentrationModerate Concentration
Firntec LTDTop vendor: 27.9% of attributable valuePayment Terms
Check noticePublished terms
Coverage: 70 active published awards; 14 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Price reduction compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Historical Awarded Suppliers With This Authority:
| Supplier Name | Historic Awards | Attributable GBP Value |
|---|---|---|
| Firntec LTD | 1 win | £598,602 |
| PBL Group Ltd | 1 win | £279,568 |
| Pennington Choices Limited | 1 win | £150,000 |
| SEVILLE DEVELOPMENTS LIMITED | 1 win | £145,810 |
| Patos Construction Ltd | 1 win | £138,430 |
Procedure terms
Contracting AuthorityPeabody Trust | Procedure methodNot published | Procurement categoryNot published |
Statuscomplete | Framework / DPSNot published | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published8 May 2025, 16:08 BST | Last source update8 May 2025, 16:08 BST | Recurring procurementNot published |
ClassificationNot published | ||
Delivery areaLocation not published | ||
OCIDocds-h6vhtk-050f18 | ||
What is being bought
Wavenet will be providing a fully managed internet service for the site at New Mansion
Square which consists of providing connectivity to the commercial units (tech hub, cultural
unit, 11 other units + 1 more in future) and the residents longue (coworking, cinema
room, phone booths)
Following the cablers recent site survey, it has been identified that additional cabling
infrastructure is required to support the delivery of a managed connectivity solution.
The existing cabling infrastructure is only suitable for BT’s FTTP network, which is residential
in nature and does not support the service levels or resilience expected of a business-grade
managed service.
In order to deliver on the brief, the following works need to be carried out:
Cabling
• Cables linking each unit to the Main IT Room
• 1 x cable will be run from the Main IT room to each of the 14 units in scope
• Cables will be 4 core fibre
• Cables will be run using existing routes – roof voids, cable trays, and underground
ducting
• Internal cables will be tight buffer internal type
• External cables will be CST armoured protected
• 1 x LC 4 Duplex fibre tray will be installed in each of the in-unit comms cabinets
Units 1 and 2
• Although not currently in scope, a cable will be run to the marketing suite to save cost
and complexity in future
• If the suite is not accessible, the cable can be left coiled and secure nearby, ready for
installation when this unit is being refurbished
Main IT Room
A new cabinet will be installed to keep our equipment safe and segregated from other contractors
•
This will be a 20u floor standing cabinet (800mm x 800mm)
•
1 x LC 48 Duplex fibre tray will be installed
•
1 x 6way PDU will be installed. This will connect to the Commando unit – currently not in-use
•
Cabling for WiFi Access Points (APs)
•
In the resident’s lounge and the tech hub, a single Cat6 cable will need to be installed for connecting the AP
•
This will be run from the in-unit cabinet to the ceiling, where the AP will be installed
•
In all of the other units, the APs will be wall mounted to save on additional cabling work
Wavenet will be providing a fully managed internet service for all commercial units as mentioned above.
•
Wired and wireless internet access on day 1 for all incoming tenants
•
Fully managed support
•
Scalable service which can be replicated at other sites
Once the cables have been linked they will install a 10Gb bearer with 1Gb bandwidth. This will allow Peabody to increase capacity to 10Gb at anytime.
They will install the infrastructure which consists of 10Gb firewall, which will meet the requirements of content filtering.
Wifi
WiFi experience includes: secure access, private networks, roaming (the ability to stay
connected across the entire site), and analytics.
Monitoring and Analytics
Wavenet will have visibility of the network health and performance and proactively resolve issues. All systems will provide visibility, insights and reports to our teams.
Remote and Onsite Engineers
•
Helpdesk and 24 / 7 Network Operations Centre (NOC)
•
Proactive Network Monitoring
•
Performance optimisation
•
Incident Response and Troubleshooting
•
Documentation and Reporting
Wavenet Limited shall perform the services to provide connectivity to the commercial units mentioned as described in their proposal Schedule 2 (Wavenet Connected Proposal for Peabody) Option A – Enterprise Switches and Opex costs.
Due to the existing cables not being suitable and tenants moving in quickly Peabody require a temporary solution to be put in place as mentioned in the Temporary Connectivity – Option 2 1GB Wireless Leased Line, this will be retained as a backup service.
To view this notice, please click here:
https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=945648319
What changed
From the official release history
- Status changed to complete
8 May 2025, 16:08 BST - Official notice release published
8 May 2025, 16:08 BST - Buyer information updated
8 May 2025, 16:08 BST
Lots and requirements (1)
Published by the contracting authority
- Lot 1 · #1Individual lot title not publishedcompletePublished valueNot publishedThe source published no individual title or description for this lot.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Procedure published
8 May 2025, 16:08 BST - Award pending
Not published · £102,753
Commercial outcome and competition
Awards Wavenet £102,753 · Not published · pending |
ContractsNo contract published |
Bid statisticsNo aggregate bid statistics published |
Buyer and organisations in this procedure
Peabody Trust
Contracting authority GB-PPON-PYJY-3925-DVJDAward and contract changes
Documents (0)
Official links; attachments are not copied
No linked documents are published
Related procedures (0)
No related procedures published