Find a TenderPlanned procurementPipeline notice
Published 23 Jun 2026, 08:11 BST

Official UK procurement notice

NRW All Wales Mountain Bike Trail and Maintenance Framework

Authority: Natural Resources Wales (Central government)

Framework agreementWorksOpen procedureAbove thresholdSME suitable
Planned pipeline value£2,000,000pipeline notice, not a live tender
Tender notice expected 3 Aug 2026from the planned procurement notice
Framework period 4 yrsends 3 Jan 2031 · starts 4 Jan 2027

What is being bought

Published requirement description

NRW intends to award a Framework Agreement to support the maintenance of over 500km official NRW mountain bike trails across Wales. The Framework contains two separate Lots, each divided further into geographical sub-Lots.

Lot 1 – Mountain Bike Trail Maintenance Works

Lot 1 covers the preventative and reactive maintenance activities identified through the regular trail inspection programme. The specification of works includes, but is not limited to:

  • Maintenance of mountain bike trail tread, trail chassis and trailside features, including de-berming, culvert repairs, ditch clearance, grade dip repairs, and repairs to trail tread and chassis using hand tools, whacker plates, powered wheelbarrows and other plant and equipment as required. This also includes clearance of fall zones and maintenance of the wider trail corridor.
  • Maintenance of trail corridors and sightlines through vegetation management, including cutting back encroaching vegetation and brashing trailside trees flush to the trunk.
  • Small-scale installation, maintenance and repair of fencing and motorcycle barriers. Detailed specifications for all works will be agreed in advance between the Contractor and the Lot Manager.
  • Installation, maintenance and replacement of waymarker posts, interpretation panels, signage and other associated trailside infrastructure.
  • Small-scale chemical treatment and manual control of weeds and invasive species within car parks and along trail networks. Chemical use must be kept to a minimum, with manual clearance being the preferred method wherever practicable. Written approval from the Project Manager must be obtained prior to any chemical application, including approval of the products to be used and the proposed application method. Chemical usage records and data sheets must be provided by the Contractor following completion of spraying activities.
  • Emergency call-out works, including outside normal working hours (09:00–17:00, Monday to Friday), for repairs, maintenance activities, route diversions and other urgent operational requirements.

Lot 2 – Mountain Bike Trail Design and Construction

Lot 2 covers the design and construction of new mountain bike trails and trail sections to the grades specified by the Client. Detailed project-specific requirements will be provided for each commission; however, the scope is expected to include:

  • Detailed trail design.
  • Securing all necessary permissions, approvals, consents and licences required for project delivery.
  • Corridor clearance and construction of trails to the specification and grading requirements defined by the Client.
  • Testing, commissioning and certification that the completed works are fit for purpose.
  • Formal handover of completed trails and associated documentation to the Client.

CPV: Paths and other metalled surfaces · Repair work on recreational areas

How this framework works

From the published notice
Framework period
4 yrs from 4 Jan 2027

The lotProcurement structure

single lot · no lot value published
Lot #1Planned 4 yrsSME
Contract period: 4 Jan 2027 – 3 Jan 2031 (4 yrs)
Delivery: WalesEligibility: SME eligible

Who is likely to bid for this lot ↓

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
What this means for your bid
  • “NRW All Wales Mountain Bike Trail and Maintenance Framework” is a framework: the contest is a place on its panel, not a single contract.

Pipeline intelligence · planning stage: how this market runs before the tender is published

How Natural Resources Wales buys Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork (CPV 4523), and who usually turns up

Natural Resources Wales’s own published record, next to the published market for the same work. This notice is a framework or DPS, so only frameworks and DPS are compared. Whole-market view: Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork (CPV 4523) →

1

How the contest usually goes

Winner shares use published awards; bid and price charts use contested lots.

How often do SMEs win?
i

How often small and medium firms win.

Share of awards where the winner’s size is known.

The counts under this question show how many awards have a known supplier size.

Last 36 months.

Buyer: 14 of 16 known-size awards · market: CPV 4523 · Wales (Cymru), n=17
88%71%

Small firms have won here. Neither number says whether you qualify; it describes who has been winning.

How often do local suppliers win?
i

How often local firms win similar work.

Winners with a registered address in the delivery region, out of awards with a known address.

Here, local means registered in Wales (Cymru).

A local branch does not count if the registered address is elsewhere.

Last 36 months.

Buyer: 9 of 15 known-location awards · market: CPV 4523 · Wales (Cymru), n=24
60%50%

Most of this buyer’s recorded winners are registered in Wales (Cymru).

How long to a decision?
i

How long buyers here take to decide after bids close.

Middle value in days from the deadline to the first award notice, on competitions that published both dates.

Only decided tenders count, so slow ones still waiting are not in.

Last 36 months.

Buyer: 15 decided notices · market: CPV 4523 · Wales (Cymru), n=6
65 days51 days

Half of these awards were announced within 65 days of the bid deadline.

How often single-bid or direct?
i

How often work is awarded with no recorded rival.

Direct awards and tenders where every published lot count shows one bid.

The market share is a minimum: some awards have no bid count.

Thin markets produce this too; it is not proof of a tailored specification.

Last 36 months.

Buyer: exactly 1 of 12 procurements with awards had no recorded rival · market: CPV 4523 · Wales (Cymru), n=7
8%29%

Missing bid counts may hide more single-bid awards. This share is a minimum.

How many bids did past lots attract?

i

How many bids past lots received.

Each colour is a bid-count range. Only competed lots with a published count are included.

Past bids do not predict this tender.

Last 36 months.

This buyer8 lots with bid counts · broad CPV 45
0% had one bid
The market36 lots with bid counts · CPV 4523 · Wales (Cymru)
6% had one bid
Buyer / market · select a colour for counts
1 bid0% / 6%
Buyer: 0 of 8 lots with published bid counts. Market: 2 of 36 lots with published bid counts.
2–313% / 8%
Buyer: 1 of 8 lots with published bid counts. Market: 3 of 36 lots with published bid counts.
4–60% / 72%
Buyer: 0 of 8 lots with published bid counts. Market: 26 of 36 lots with published bid counts.
7+88% / 14%
Buyer: 7 of 8 lots with published bid counts. Market: 5 of 36 lots with published bid counts.

How did awards compare with estimates?

i

Where winning prices landed against estimates.

Each colour shows awards below, close to or above the published estimate, one lot at a time.

On a framework or DPS, prices are agreed when work is called off.

Past prices are a guide, not a bid price.

Last 36 months.

Not comparable on a framework or DPS. The notice sets up a supplier panel and a ceiling value; what the work actually costs is agreed later, on each call-off or mini-competition, and those publish as contract notices of their own. The award-vs-estimate record of this market therefore sits on the call-offs; this page shows it on the contracts, not on the panel that frames them.

2

Assess each lot
i

What past awards tell you about each lot.

See the forecast, this buyer’s earlier suppliers and firms with relevant wins.

No supplier is confirmed as a bidder.

Open a lot for its forecast, this buyer’s previous supplier and possible competitors, from published award history, not a bid list

Lot #1CPV 452348 monthsSME suitablePublished estimate£2.0m
Expected competition
i

How many bids this lot may attract.

The forecast uses similar past competitions. The bar shows either that forecast or past bid counts; the line below says which.

Each lot shows its own forecast based on its own category; forecasts for different lots of the same notice are not comparative. The bar shows 36 past lots.

A forecast, not a list of bidders.

—No model forecast yet6% single-bid risk
Past bids on 36 similar lots
1 bid6%
2 of 36 similar past lots received 1 bid (6%).
2–38%
3 of 36 similar past lots received 2–3 (8%).
4–672%
26 of 36 similar past lots received 4–6 (72%).
7+14%
5 of 36 similar past lots received 7+ (14%).
Comparable past lots usually drew 5 bids.
Commercial price forecast
i

Where the award price may land.

The forecast uses similar awards and the buyer’s estimate. The band covers the middle half of likely prices.

No comparable awards for this lot yet.

A statistical guide from past awards, not a price to bid.

—Priced at call-off
On a framework or DPS the price is agreed on each call-off, so there is no award price to forecast here: the published figure is a ceiling.

Who has supplied this buyer on similar work?
i

Who has done similar work for this buyer.

Past contracts are matched by buyer, title and type of work.

A past supplier may not bid again.

No earlier contract of this buyer matches this lot on the published record.

Who could compete for this lot?
i

Who could compete for this lot?

Firms with relevant past wins. On a framework, we show firms on that agreement.

None is confirmed as a bidder.

Candidate suppliers for this notice have not been worked out yet, so this is not a verdict that nobody fits.

About this data
  • Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
  • Two views, kept apart. The authority’s own track record and the wider market for the same kind of work sit side by side and are never mixed. Where the local picture is too thin, a figure widens to a broader market and says which one it used.
  • Forecasts are labelled. The price forecast and its range, possible competitors and the earlier-work matches are our estimates from past awards: not published facts, not win chances and not price advice. Official notices do not say who is bidding.
  • Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.

Procedure terms & legal framework

From the official record
Procedure method
Open procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Works
Notice status
Planned procurement
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
23 Jun 2026, 08:11 BST
Last source update
23 Jun 2026, 08:11 BST
Authority reference
NRW55737
FTS notice number
2026/S 000-058736
Latest notice
Pipeline notice (UK1)
Classification (CPV)
Paths and other metalled surfacesRepair work on recreational areas
Delivery area
Wales (UKL)
Official registry OCID
ocds-h6vhtk-06ba93 Find a Tender

How it was run

Official notice
Appointment period ends
—

Timeline

23 Jun 2026 → 4 Jan 2027 · 3 dates
  1. Planning notice published119 days ago
    23 Jun 2026, 08:11 BST
  2. Tender notice expected77 days ago
    3 Aug 2026, 23:59 BST
  3. Today
    20 Oct 2026
  4. Contract startsin 76 days
    4 Jan 2027

Notice history

1 event · 1 release on Find a Tender
  1. Pipeline notice published
    23 Jun 2026, 08:11 BST
    UK1

Commercial outcome & contract awards

Pipeline notice
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Contracting authority & participating public bodies

Natural Resources Wales

Contracting authorityPublic authority - central governmentWelsh devolved regulations apply GB-PPON: PBBR-3628-MPRN Welsh Government Offices Cathays Park , Cardiff, Wales, CF10 3NQContact name, email

Official documents & specifications (1)

Official links; attachments are not copied

Notices published for this procedure

  • Pipeline notice planningPipeline noticeUK1Pipeline notice on Find a Tender