← Back to search results

plannedFind a Tender · planning

NICC Group Training Simulator

Buyer: HS2 →

BuyerHS2
Statusplanned
DeadlineNot published
ValueValue not published
Published10 Feb 2025

What is being bought

The HS2 Group Training Facility (GTF) is used specifically to facilitate the training and retention of competence of the roles as a group i.e. the interworking between the various roles required in different modes of operation e.g. normal working, perturbed, under maintenance and emergency. It builds on other separate training facilities, provided by others, that address the training and retention of individual operator competence on the specific operational technology systems that are used to control and manage the railway e.g. the (Rail) Traffic Management System. The GTF will support the training for the Traffic Manager Controller, Infrastructure Manager Controller, Shift Manager, Security Controller, Customer Experience Controller, Resource Controller and Rolling Stock Controller roles. The GTF includes a Group Training Simulator (GTS) along with workstation furniture for both trainees and trainers located in a dedicated space within the Network Integrated Control Centre (NICC). The allocated space comprises an instructor’s room which contains the instructors and user interface equipment needed to manage, control, monitor and evaluate the sessions, and the group training room which contains the operators and their user interface equipment. There is also a separately located GTS equipment space within the NICC available to house simulator equipment where this is provided on site. The Group Training Simulator (GTS) is used to provide a comprehensive single platform that simulates the various operational systems, operational communication systems, and selected elements of the supporting IT operational and business applications that enable the operation and control of the HS2 railway. The simulation will also include an element of rail traffic simulation and rail infrastructure simulation. As the GTS is not being used for training on the operational technology systems themselves, it is not required to provide a precise simulation/emulation of the individual systems. However, the GTS must provide a sufficient level of fidelity to the live operational systems so that meaningful training can be accomplished with a reasonable level of authenticity – e.g., the system should at least appear as close as possible to the real system and not introduce any confusion to operators during training. The GTS is entirely separate from the operational technology systems and has no connection with them, though there will be some connectivity with corporate IT systems for the purposes of passing training and competence assessment data generated within the GTS to other associated HS2 IT systems. There will therefore need to be some consideration of, and compliance with, HS2 cyber security standards and provisions as part of design and deployment. The GTS needs to be deployed to the GTF within the NICC and the assigned rooms mentioned earlier, noting that the Instructor workstation furniture will form part of the envisaged scope of supply for the GTS, whereas trainee workstations are already provisioned through a contract with another supplier. Further detail is available with the Market Sounding Briefing Document available from Paul Markham, Procurement Category Manager - paul.markham@hs2.org.uk

Delivery location

UK

Categories

Software programming and consultancy services 72200000Specialist training services 80510000

Lot details

Lot 1

The HS2 Group Training Facility (GTF) is used specifically to facilitate the training and retention of competence of the roles as a group i.e. the interworking between the various roles required in different modes of operation e.g. normal working, perturbed, under maintenance and emergency. It builds on other separate training facilities, provided by others, that address the training and retention of individual operator competence on the specific operational technology systems that are used to control and manage the railway e.g. the (Rail) Traffic Management System. The GTF will support the training for the Traffic Manager Controller, Infrastructure Manager Controller, Shift Manager, Security Controller, Customer Experience Controller, Resource Controller and Rolling Stock Controller roles. The GTF includes a Group Training Simulator (GTS) along with workstation furniture for both trainees and trainers located in a dedicated space within the Network Integrated Control Centre (NICC). The allocated space comprises an instructor’s room which contains the instructors and user interface equipment needed to manage, control, monitor and evaluate the sessions, and the group training room which contains the operators and their user interface equipment. There is also a separately located GTS equipment space within the NICC available to house simulator equipment where this is provided on site. The Group Training Simulator (GTS) is used to provide a comprehensive single platform that simulates the various operational systems, operational communication systems, and selected elements of the supporting IT operational and business applications that enable the operation and control of the HS2 railway. The simulation will also include an element of rail traffic simulation and rail infrastructure simulation. The GTS provides multiple trainers with suitable user interfaces to manage, control, monitor, participate in (role play) and evaluate the various training sessions. Additionally it allows trainers to create, modify and manage a library of scenarios that can be used to drive the GTS simulation sessions to behave in the desired manner. The GTS is expected to come pre-populated with some scenarios developed collaboratively with HS2 – and used as part of testing and acceptance activities - but others will be created by HS2 training staff as operational experience of the railway in service accumulates and demands for new scenarios arise. Included within the provision of the GTS will be voice, video and screen recording and playback facilities so that trainers and trainees can review training sessions where appropriate to enhance learning and feedback opportunities. Additional information: Please capture your response using the Microsoft Forms page which can be found here: https://forms.office.com/Pages/ResponsePage.aspx?id=_kLg78_Ea06o1CMjTGnF7CTcGToghJhHoICn1pNvz-9UOVdYMElQV0JDSjZVSklCQUZGVUdZOFZGNi4u If you wish to participate in the market sounding exercise, please submit a response via the above mentioned link by no later than 28th February 2025 at 16:00 (4pm GMT).

Statusplanned

What is included

ItemCategoryQuantity
1Software programming and consultancy servicesNot published

Comparable-procurement analytics

Benchmarked against retained Find a Tender procedures with CPV division 72. The category anchor is Software programming and consultancy services (72200000); this is a deliberately broad market comparator. The comparison is shown at several levels rather than pretending one company or region is always the best benchmark.

Comparison setProceduresReported bids per procedureNamed award suppliersPrice evidence
Market: CPV division 7210,5392 median · 15.4 average (4,162 of 10,539 with a bid count)2 average (5,054 of 10,539 with named award suppliers)Not published
Same buyer71 median · 1 average (3 of 7 with a bid count)1.3 average (3 of 7 with named award suppliers)Not published
Delivery region: UK3,3232 median · 33.8 average (1,172 of 3,323 with a bid count)2.8 average (1,502 of 3,323 with named award suppliers)Not published

“Reported bids” is an official aggregate, sometimes reported per lot; it is the closest available competition measure. “Named award suppliers” are winners, not all applicants.

Price-outcome signal

Not enough comparable procedures currently publish both a GBP tender value and a usable lowest-valid-bid value to calculate a responsible price-reduction benchmark. Tenderline deliberately does not infer a saving from named award suppliers or from missing award values.

Procurement strategy & market signals

Framework agreementNot published
Dynamic purchasing systemNot published
Competitive procurementNot published
Recurring requirementNot published
Procurement method rationaleNot published
Rationale classificationsNot published
Special regimeNot published
Covered byGPA
Submission policyNot published
Selection criteriaNot published
Risk detailsNot published

Planning & early market engagement

BudgetNot published
No-engagement rationaleNot published
Planning documents0
Planning milestones0

No planning milestones published.

Related procurements

No linked framework, prior procurement or reprocurement published.

Documents & submission route

No documents are published in the current source record.

Source data inventory

Diagnostic view. “Not published” means this current release does not provide a value.

OCIDocds-h6vhtk-04dd65
Latest release ID004424-2025
Latest release timestampMon Feb 10 2025 16:13:53 GMT+0000 (Coordinated Universal Time)
Sourcefind-a-tender
Official notice URLNot published
Tender statusplanned
Procurement methodNot published
Procurement method detailsNot published
Main procurement categoryservices
Above thresholdNot published
Legal basis32014L0025
Tender period: startNot published
Tender period: endNot published
Expression of interest deadlineNot published
Enquiry deadlineNot published
Award period: startNot published
Award period: endNot published
Submission method detailsNot published
Submission languagesNot published
Electronic catalogue policyNot published
Total tender valueNot published
Tender lots in source1
Tender items in source1
Tender documents in source0
Awards in latest release0
Contracts in latest release0
Parties in latest release1

Notice history

DateEventReference
10 Feb 2025planning004424-2025

All source data

Unmodified official OCDS data retained by Tenderline for this procurement process.

Complete current OCDS release JSON
{
  "id": "004424-2025",
  "tag": [
    "planning"
  ],
  "date": "2025-02-10T16:13:53Z",
  "ocid": "ocds-h6vhtk-04dd65",
  "buyer": {
    "id": "GB-FTS-6976",
    "name": "HS2"
  },
  "tender": {
    "id": "Project_2838",
    "lots": [
      {
        "id": "1",
        "status": "planned",
        "description": "The HS2 Group Training Facility (GTF) is used specifically to facilitate the training and retention of competence of the roles as a group i.e. the interworking between the various roles required in different modes of operation e.g. normal working, perturbed, under maintenance and emergency. It builds on other separate training facilities, provided by others, that address the training and retention of individual operator competence on the specific operational technology systems that are used to control and manage the railway e.g. the (Rail) Traffic Management System.\nThe GTF will support the training for the Traffic Manager Controller, Infrastructure Manager Controller, Shift Manager, Security Controller, Customer Experience Controller, Resource Controller and Rolling Stock Controller roles.\nThe GTF includes a Group Training Simulator (GTS) along with workstation furniture for both trainees and trainers located in a dedicated space within the Network Integrated Control Centre (NICC). The allocated space comprises an instructor’s room which contains the instructors and user interface equipment needed to manage, control, monitor and evaluate the sessions, and the group training room which contains the operators and their user interface equipment. There is also a separately located GTS equipment space within the NICC available to house simulator equipment where this is provided on site.\nThe Group Training Simulator (GTS) is used to provide a comprehensive single platform that simulates the various operational systems, operational communication systems, and selected elements of the supporting IT operational and business applications that enable the operation and control of the HS2 railway. The simulation will also include an element of rail traffic simulation and rail infrastructure simulation. \nThe GTS provides multiple trainers with suitable user interfaces to manage, control, monitor, participate in (role play) and evaluate the various training sessions. Additionally it allows trainers to create, modify and manage a library of scenarios that can be used to drive the GTS simulation sessions to behave in the desired manner. The GTS is expected to come pre-populated with some scenarios developed collaboratively with HS2 – and used as part of testing and acceptance activities - but others will be created by HS2 training staff as operational experience of the railway in service accumulates and demands for new scenarios arise.\nIncluded within the provision of the GTS will be voice, video and screen recording and playback facilities so that trainers and trainees can review training sessions where appropriate to enhance learning and feedback opportunities. Additional information: Please capture your response using the Microsoft Forms page which can be found here: \nhttps://forms.office.com/Pages/ResponsePage.aspx?id=_kLg78_Ea06o1CMjTGnF7CTcGToghJhHoICn1pNvz-9UOVdYMElQV0JDSjZVSklCQUZGVUdZOFZGNi4u\nIf you wish to participate in the market sounding exercise, please submit a response via\nthe above mentioned link by no later than 28th February 2025 at 16:00 (4pm GMT)."
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UK"
          }
        ],
        "additionalClassifications": [
          {
            "id": "72200000",
            "scheme": "CPV",
            "description": "Software programming and consultancy services"
          }
        ]
      }
    ],
    "title": "NICC Group Training Simulator",
    "status": "planned",
    "coveredBy": [
      "GPA"
    ],
    "legalBasis": {
      "id": "32014L0025",
      "scheme": "CELEX"
    },
    "description": "The HS2 Group Training Facility (GTF) is used specifically to facilitate the training and retention of competence of the roles as a group i.e. the interworking between the various roles required in different modes of operation e.g. normal working, perturbed, under maintenance and emergency. It builds on other separate training facilities, provided by others, that address the training and retention of individual operator competence on the specific operational technology systems that are used to control and manage the railway e.g. the (Rail) Traffic Management System.\nThe GTF will support the training for the Traffic Manager Controller, Infrastructure Manager Controller, Shift Manager, Security Controller, Customer Experience Controller, Resource Controller and Rolling Stock Controller roles.\nThe GTF includes a Group Training Simulator (GTS) along with workstation furniture for both trainees and trainers located in a dedicated space within the Network Integrated Control Centre (NICC). The allocated space comprises an instructor’s room which contains the instructors and user interface equipment needed to manage, control, monitor and evaluate the sessions, and the group training room which contains the operators and their user interface equipment. There is also a separately located GTS equipment space within the NICC available to house simulator equipment where this is provided on site.\nThe Group Training Simulator (GTS) is used to provide a comprehensive single platform that simulates the various operational systems, operational communication systems, and selected elements of the supporting IT operational and business applications that enable the operation and control of the HS2 railway. The simulation will also include an element of rail traffic simulation and rail infrastructure simulation. \nAs the GTS is not being used for training on the operational technology systems themselves, it is not required to provide a precise simulation/emulation of the individual systems. However, the GTS must provide a sufficient level of fidelity to the live operational systems so that meaningful training can be accomplished with a reasonable level of authenticity – e.g., the system should at least appear as close as possible to the real system and not introduce any confusion to operators during training. \nThe GTS is entirely separate from the operational technology systems and has no connection with them, though there will be some connectivity with corporate IT systems for the purposes of passing training and competence assessment data generated within the GTS to other associated HS2 IT systems. There will therefore need to be some consideration of, and compliance with, HS2 cyber security standards and provisions as part of design and deployment.\nThe GTS needs to be deployed to the GTF within the NICC and the assigned rooms mentioned earlier, noting that the Instructor workstation furniture will form part of the envisaged scope of supply for the GTS, whereas trainee workstations are already provisioned through a contract with another supplier. \nFurther detail is available with the Market Sounding Briefing Document available from Paul Markham, Procurement Category Manager - paul.markham@hs2.org.uk",
    "communication": {
      "futureNoticeDate": "2025-06-03T00:00:00+01:00"
    },
    "classification": {
      "id": "80510000",
      "scheme": "CPV",
      "description": "Specialist training services"
    },
    "mainProcurementCategory": "services"
  },
  "parties": [
    {
      "id": "GB-FTS-6976",
      "name": "HS2",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UK",
        "locality": "Birmingham",
        "postalCode": "B4 6GA",
        "countryName": "United Kingdom",
        "streetAddress": "High Speed Two (HS2) Ltd, Two Snowhill, Queensway"
      },
      "details": {
        "url": "http://www.hs2.org.uk",
        "classifications": [
          {
            "id": "RAILWAY_SERVICES",
            "scheme": "TED_CE_ACTIVITY",
            "description": "Railway services"
          }
        ]
      },
      "identifier": {
        "legalName": "HS2"
      },
      "contactPoint": {
        "name": "Paul Markham",
        "email": "paul.markham@hs2.org.uk"
      }
    }
  ],
  "language": "en",
  "description": "Further detail is available with the Market Sounding Briefing Document available from Paul Markham, Procurement Category Manager - paul.markham@hs2.org.uk\nHS2 Ltd’s current preferred procurement route has been identified as a Competitive Flexible Procedure under the new Procurement Act. \nThis may include any or all of the following: \na Pre Qualification Questionnaire (PQQ) stage, an Invitation to Tender (ITT) stage, a Negotiation stage. \nHowever, subject to the feedback received in response to this Market Sounding, alternative procurement routes may be considered.HS2 Ltd would greatly appreciate your feedback using the questionnaire detailed.\nPlease capture your response using the Microsoft Forms page which can be found here: \nhttps://forms.office.com/Pages/ResponsePage.aspx?id=_kLg78_Ea06o1CMjTGnF7CTcGToghJhHoICn1pNvz-9UOVdYMElQV0JDSjZVSklCQUZGVUdZOFZGNi4u\nIf you have any queries or issues, please contact paul.markham@hs2.org.uk , marking the subject as ‘NICC Group Training MSQ (HS2/2838).’\n\n        \nTo enable HS2 Ltd to analyse and consider your response, we would be grateful if you could submit your feedback via the Microsoft Forms link above by 4pm on Friday 28th February 2025.\nConditions regarding this PIN: \n1) This PIN is NOT a call for competition and is not published to reduce time limits for the receipt of tenders; \n2) This procurement will be launched in due course by the publication of a Contract Notice not linked in any way to this PIN; \n3) HS2 Ltd reserves the right not to commence any procurement or award any contract in respect of this opportunity; \n4) The information contained in this PIN may be subject to change due to the impact of governance, assurance, regulatory changes and/or the market engagement outcomes.\nInsofar as is permitted by law, HS2 Ltd shall not be liable for any losses incurred by any party as a result of reliance on the information contained/linked herein; \n5) Failure to register an interest in connection with this PIN shall not prevent an organisation from participating in any formal call for competition.",
  "initiationType": "tender"
}
Complete JSON history (1 releases)
10 Feb 2025 · 004424-2025 · planning
{
  "id": "004424-2025",
  "tag": [
    "planning"
  ],
  "date": "2025-02-10T16:13:53Z",
  "ocid": "ocds-h6vhtk-04dd65",
  "buyer": {
    "id": "GB-FTS-6976",
    "name": "HS2"
  },
  "tender": {
    "id": "Project_2838",
    "lots": [
      {
        "id": "1",
        "status": "planned",
        "description": "The HS2 Group Training Facility (GTF) is used specifically to facilitate the training and retention of competence of the roles as a group i.e. the interworking between the various roles required in different modes of operation e.g. normal working, perturbed, under maintenance and emergency. It builds on other separate training facilities, provided by others, that address the training and retention of individual operator competence on the specific operational technology systems that are used to control and manage the railway e.g. the (Rail) Traffic Management System.\nThe GTF will support the training for the Traffic Manager Controller, Infrastructure Manager Controller, Shift Manager, Security Controller, Customer Experience Controller, Resource Controller and Rolling Stock Controller roles.\nThe GTF includes a Group Training Simulator (GTS) along with workstation furniture for both trainees and trainers located in a dedicated space within the Network Integrated Control Centre (NICC). The allocated space comprises an instructor’s room which contains the instructors and user interface equipment needed to manage, control, monitor and evaluate the sessions, and the group training room which contains the operators and their user interface equipment. There is also a separately located GTS equipment space within the NICC available to house simulator equipment where this is provided on site.\nThe Group Training Simulator (GTS) is used to provide a comprehensive single platform that simulates the various operational systems, operational communication systems, and selected elements of the supporting IT operational and business applications that enable the operation and control of the HS2 railway. The simulation will also include an element of rail traffic simulation and rail infrastructure simulation. \nThe GTS provides multiple trainers with suitable user interfaces to manage, control, monitor, participate in (role play) and evaluate the various training sessions. Additionally it allows trainers to create, modify and manage a library of scenarios that can be used to drive the GTS simulation sessions to behave in the desired manner. The GTS is expected to come pre-populated with some scenarios developed collaboratively with HS2 – and used as part of testing and acceptance activities - but others will be created by HS2 training staff as operational experience of the railway in service accumulates and demands for new scenarios arise.\nIncluded within the provision of the GTS will be voice, video and screen recording and playback facilities so that trainers and trainees can review training sessions where appropriate to enhance learning and feedback opportunities. Additional information: Please capture your response using the Microsoft Forms page which can be found here: \nhttps://forms.office.com/Pages/ResponsePage.aspx?id=_kLg78_Ea06o1CMjTGnF7CTcGToghJhHoICn1pNvz-9UOVdYMElQV0JDSjZVSklCQUZGVUdZOFZGNi4u\nIf you wish to participate in the market sounding exercise, please submit a response via\nthe above mentioned link by no later than 28th February 2025 at 16:00 (4pm GMT)."
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UK"
          }
        ],
        "additionalClassifications": [
          {
            "id": "72200000",
            "scheme": "CPV",
            "description": "Software programming and consultancy services"
          }
        ]
      }
    ],
    "title": "NICC Group Training Simulator",
    "status": "planned",
    "coveredBy": [
      "GPA"
    ],
    "legalBasis": {
      "id": "32014L0025",
      "scheme": "CELEX"
    },
    "description": "The HS2 Group Training Facility (GTF) is used specifically to facilitate the training and retention of competence of the roles as a group i.e. the interworking between the various roles required in different modes of operation e.g. normal working, perturbed, under maintenance and emergency. It builds on other separate training facilities, provided by others, that address the training and retention of individual operator competence on the specific operational technology systems that are used to control and manage the railway e.g. the (Rail) Traffic Management System.\nThe GTF will support the training for the Traffic Manager Controller, Infrastructure Manager Controller, Shift Manager, Security Controller, Customer Experience Controller, Resource Controller and Rolling Stock Controller roles.\nThe GTF includes a Group Training Simulator (GTS) along with workstation furniture for both trainees and trainers located in a dedicated space within the Network Integrated Control Centre (NICC). The allocated space comprises an instructor’s room which contains the instructors and user interface equipment needed to manage, control, monitor and evaluate the sessions, and the group training room which contains the operators and their user interface equipment. There is also a separately located GTS equipment space within the NICC available to house simulator equipment where this is provided on site.\nThe Group Training Simulator (GTS) is used to provide a comprehensive single platform that simulates the various operational systems, operational communication systems, and selected elements of the supporting IT operational and business applications that enable the operation and control of the HS2 railway. The simulation will also include an element of rail traffic simulation and rail infrastructure simulation. \nAs the GTS is not being used for training on the operational technology systems themselves, it is not required to provide a precise simulation/emulation of the individual systems. However, the GTS must provide a sufficient level of fidelity to the live operational systems so that meaningful training can be accomplished with a reasonable level of authenticity – e.g., the system should at least appear as close as possible to the real system and not introduce any confusion to operators during training. \nThe GTS is entirely separate from the operational technology systems and has no connection with them, though there will be some connectivity with corporate IT systems for the purposes of passing training and competence assessment data generated within the GTS to other associated HS2 IT systems. There will therefore need to be some consideration of, and compliance with, HS2 cyber security standards and provisions as part of design and deployment.\nThe GTS needs to be deployed to the GTF within the NICC and the assigned rooms mentioned earlier, noting that the Instructor workstation furniture will form part of the envisaged scope of supply for the GTS, whereas trainee workstations are already provisioned through a contract with another supplier. \nFurther detail is available with the Market Sounding Briefing Document available from Paul Markham, Procurement Category Manager - paul.markham@hs2.org.uk",
    "communication": {
      "futureNoticeDate": "2025-06-03T00:00:00+01:00"
    },
    "classification": {
      "id": "80510000",
      "scheme": "CPV",
      "description": "Specialist training services"
    },
    "mainProcurementCategory": "services"
  },
  "parties": [
    {
      "id": "GB-FTS-6976",
      "name": "HS2",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UK",
        "locality": "Birmingham",
        "postalCode": "B4 6GA",
        "countryName": "United Kingdom",
        "streetAddress": "High Speed Two (HS2) Ltd, Two Snowhill, Queensway"
      },
      "details": {
        "url": "http://www.hs2.org.uk",
        "classifications": [
          {
            "id": "RAILWAY_SERVICES",
            "scheme": "TED_CE_ACTIVITY",
            "description": "Railway services"
          }
        ]
      },
      "identifier": {
        "legalName": "HS2"
      },
      "contactPoint": {
        "name": "Paul Markham",
        "email": "paul.markham@hs2.org.uk"
      }
    }
  ],
  "language": "en",
  "description": "Further detail is available with the Market Sounding Briefing Document available from Paul Markham, Procurement Category Manager - paul.markham@hs2.org.uk\nHS2 Ltd’s current preferred procurement route has been identified as a Competitive Flexible Procedure under the new Procurement Act. \nThis may include any or all of the following: \na Pre Qualification Questionnaire (PQQ) stage, an Invitation to Tender (ITT) stage, a Negotiation stage. \nHowever, subject to the feedback received in response to this Market Sounding, alternative procurement routes may be considered.HS2 Ltd would greatly appreciate your feedback using the questionnaire detailed.\nPlease capture your response using the Microsoft Forms page which can be found here: \nhttps://forms.office.com/Pages/ResponsePage.aspx?id=_kLg78_Ea06o1CMjTGnF7CTcGToghJhHoICn1pNvz-9UOVdYMElQV0JDSjZVSklCQUZGVUdZOFZGNi4u\nIf you have any queries or issues, please contact paul.markham@hs2.org.uk , marking the subject as ‘NICC Group Training MSQ (HS2/2838).’\n\n        \nTo enable HS2 Ltd to analyse and consider your response, we would be grateful if you could submit your feedback via the Microsoft Forms link above by 4pm on Friday 28th February 2025.\nConditions regarding this PIN: \n1) This PIN is NOT a call for competition and is not published to reduce time limits for the receipt of tenders; \n2) This procurement will be launched in due course by the publication of a Contract Notice not linked in any way to this PIN; \n3) HS2 Ltd reserves the right not to commence any procurement or award any contract in respect of this opportunity; \n4) The information contained in this PIN may be subject to change due to the impact of governance, assurance, regulatory changes and/or the market engagement outcomes.\nInsofar as is permitted by law, HS2 Ltd shall not be liable for any losses incurred by any party as a result of reliance on the information contained/linked herein; \n5) Failure to register an interest in connection with this PIN shall not prevent an organisation from participating in any formal call for competition.",
  "initiationType": "tender"
}