Find a TenderAwarded without competition
Published 21 Apr 2022, 12:32 BST

Official UK procurement notice

Network Rail North West & Central Region CP7 Frameworks: Framework Category D

Official notice

Authority: NETWORK RAIL INFRASTRUCTURE LIMITED (Central government)·Consortium: 3 public authorities

Framework agreement45 lotsWorksAward procedure without prior publication of a call for competition
Framework ceiling (notional)£358,000,000initial estimate £695,000,000 · framework ceiling, not attributable revenue · 3 value updates
Submissions closed 29 Jul 2022
Lots 45see the lot list below

What is being bought45 lots · detail below

Published requirement description

Network Rail has put in place a number of frameworks for Control Period 7 (CP7) for the delivery of capital works in the North West & Central Region. These frameworks are divided into categories and separate Contract Award Notices relate to each of them. On 12 February 2024 Network Rail concluded ten (10) service contracts with the Participants (as defined below) under Framework Category D.

Framework Category D relates to the delivery of “minor and reactive works” relating to planned, unplanned and cyclical maintenance requirements, with discipline specific lots for Civil Engineering and Buildings, across different geographical areas within the North West & Central Region (the “Region”). This notice contains further detail of the ongoing use of Framework Category D in line with the originally advertised scope.

The Participants are Amalgamated Construction Ltd, QTS Group Ltd, Construction Marine Ltd, J Murphy & Sons, CK Rail Solutions Ltd and JSS Rail Limited.

The scope of works carried out under Framework Category D are:

  • Provision of emergency response capability to be able to have an initial on-site presence & response not greater than 2hrs notice (Note: Does not apply to all lots, see section II.2 for more detail on each lot)
  • Survey, investigation, and testing
  • Outline and detailed design (including temporary works)
  • Implementation
  • Enabling works for inspections and assessments
  • Demolition
  • Booking of possessions, isolations, and road closures
  • Statutory consents and permissions
  • If directed by Network Rail, third party access agreements

The works to Network Rail’s assets may also incorporate inspection, maintenance, repair, partial or whole renewal.

Network Rail appointed suppliers to this Framework Category D across two discipline lots and geographical sub-lots as follows:

Civil Engineering (Structures & Geotechnical)

Lot D1 (O-C) Civil Engineering (Structures & Geotechnical) across the full Region: 2 Suppliers

Lot D1 (R) Civil Engineering (Structures & Geotechnical) across the full Region: 2 Suppliers

Buildings

Lot D2 (NW) Buildings in North West Route area only: 3 Suppliers

Lot D2 (C&WCS) Buildings in combined Central Route and West Coast South Route areas only: 3 Suppliers

CPV: Building construction work · Building installation work · Construction work · Construction work for buildings relating to railway transport · Construction work for railways and cable transport systems · Engineering design services · Engineering design services for the construction of civil engineering works · High voltage installation work · Low-voltage installation work · Railway bridge construction work · Railway construction works · Railway embankment construction work · +11 more

How this framework works

From the published notice
Bids received
7 bids received · 9 suppliers appointed

Lots and requirements (45)Procurement structure

25 of 45 loaded on this page

Showing the first 25 of 45 published lots; the full list is in the JSON and Markdown mirrors of this notice. 45 lots · 22 with a published value.

Every one of these 3 lots carries the same published figure, £65,000,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.

Lot #1Lot B1 (R) Civil Engineering (Structures & Geotechnical)AwardedRenewalceiling above

This award is for the supply of a comprehensive structures remote and non-remote monitoring service to the NW&C region.

The services are technically complex and requires the management of NR's infrastructure to maintain and support the continuous operation of a safe railway.

Delivery: UK · Network Rail’s North West & Central Region (comprising the North West Route, Central Route and West Coast South Route).
Extensions: The initial term of the framework will be 5 years (following a 6 month mobilisation period) with an option, subject to the successful supplier's performance during the initial term and on-going Network Rail requirements, to extend for a further period of up to 2 years. The estimated total value of Lot B1 (R) will be within the range of £55,000,000 to £65,000,000 for the 7.5 year duration.Second stage: 6–null candidates invited to tenderVariant bids: not allowed
Lot #2Lot B1 (NW) Civil Engineering (Structures & Geotechnical)RenewalPublished value£50,000,000

Network Rail is looking to appoint a framework supplier to deliver a proportion of the civil engineering (structures and geotechnical) workbank within the North West Route. This is a geographical sub-lot comprising the North West Route: www.networkrail.co.uk/running-the-railway/… ↗

The scope of works which Network Rail may require comprises:

  • Feasibility
  • Survey, investigation, and reporting
  • Option selection (involving outline methodology)
  • Outline and detailed design (including temporary works)
  • Implementation (including demolition)
  • Commissioning
  • Hand back into maintenance
  • Statutory consents and permissions
  • If directed by Network Rail, third party access agreements

These works are to be performed in connection with the following categories of assets, incorporating partial or whole renewal (which may include replacement, removal, major repair, major refurbishment or strengthening) of:

  • Bridges (underbridges, overbridges, footbridges, property rafts)
  • Viaducts
  • Tunnels
  • Walls (boundary, retaining and acoustic barriers)
  • Drainage including culverts
  • Structures and works associated with river, coastal and estuarine defences
  • Geotechnical (soil embankments, soil cuttings, rock cuttings and associated drainage works)
  • Mining (mine workings, shafts and adits)
  • Ancillary structures (e.g. foundations, support structures, access roads, fencing, gates, steps)

This lot relates to a single supplier for the North West Route. The successful supplier may be required to deliver works within the scope of the discipline lot B1 (NW) Civil Engineering (Structures and Geotechnical) in the North West Route in addition to a supplier appointed for the Region (Lot B1 (R) Civil Engineering (Structures & Geotechnical) working across the full NW&C Region (North West Route, Central Route and West Coast South Route)). Network Rail intends to allocate works to the relevant supplier from an annual workbank portfolio on a direct award basis (subject to certain criteria and up to a set percentage of the annual workbank value) as set out in the framework agreement. The estimated value stated at Section II.2.6 relates to the portion of works anticipated to be allocated to the successful supplier in the North West Route under this lot (lot B1 (NW) Civil Engineering (Structures and Geotechnical)). Additional information: The duration stated at II.2.7 and estimated value at II.2.6 relate to the full duration of the agreement, including the mobilisation period (6 months), initial term (60 months) and renewal options (24 months).

Delivery: UK · Network Rail’s North West Route.
Extensions: The initial term of the framework will be 5 years (following a 6 month mobilisation period) with an option, subject to the successful supplier's performance during the initial term and on-going Network Rail requirements, to extend for a further period of up to 2 years. The estimated total value of Lot B1 (NW) will be within the range of £40,000,000 to £50,000,000 for the 7.5 year duration.Second stage: 6–null candidates invited to tenderVariant bids: not allowed
Lot #3Lot B1 (C&WCS) Civil Engineering (Structures & Geotechnical)RenewalPublished value£55,000,000

Network Rail is looking to appoint a framework supplier to deliver a proportion of the civil engineering (structures and geotechnical) workbank across the Central Route and West Coast South Route areas. This is a geographical sub-lot comprising the combined Central Route and West Coast South Route areas: www.networkrail.co.uk/running-the-railway/… ↗

The scope of works which Network Rail may require comprises:

  • Feasibility
  • Survey, investigation, and reporting
  • Option selection (involving outline methodology)
  • Outline and detailed design (including temporary works)
  • Implementation (including demolition)
  • Commissioning
  • Hand back into maintenance
  • Statutory consents and permissions
  • If directed by Network Rail, third party access agreements

These works are to be performed in connection with the following categories of assets, incorporating partial or whole renewal (which may include replacement, removal, major repair, major refurbishment or strengthening) of:

  • Bridges (underbridges, overbridges, footbridges, property rafts)
  • Viaducts
  • Tunnels
  • Walls (boundary, retaining and acoustic barriers)
  • Drainage including culverts
  • Structures and works associated with river, coastal and estuarine defences
  • Geotechnical (soil embankments, soil cuttings, rock cuttings and associated drainage works)
  • Mining (mine workings, shafts and adits)
  • Ancillary structures (e.g. foundations, support structures, access roads, fencing, gates, steps)

This lot relates to a single supplier for the combined Central Route and West Coast South Route areas. The successful supplier may be required to deliver works within the scope of the discipline lot B1 (C&WCS) Civil Engineering (Structures and Geotechnical) in the Central Route and West Coast South Route in addition to a supplier appointed for the Region (Lot B1 (R) Civil Engineering (Structures & Geotechnical) working across the full NW&C Region (North West Route, Central Route and West Coast South Route)). Network Rail intends to allocate works to the relevant supplier from an annual workbank portfolio on a direct award basis (subject to certain criteria and up to a set percentage of the annual workbank value) as set out in the framework agreement. The estimated value stated at Section II.2.6 relates to the portion of works anticipated to be allocated to the successful supplier in the combined Central Route and West Coast South Route areas under this lot (lot B1 (C&WCS) Civil Engineering (Structures and Geotechnical)). Additional information: The duration stated at II.2.7 and estimated value at II.2.6 relate to the full duration of the agreement, including the mobilisation period (6 months), initial term (60 months) and renewal options (24 months).

Delivery: UK · Network Rail’s Central Route and West Coast South Route.
Extensions: The initial term of the framework will be 5 years (following a 6 month mobilisation period) with an option, subject to the successful supplier's performance during the initial term and on-going Network Rail requirements, to extend for a further period of up to 2 years. The estimated total value of Lot B1 (C&WCS) will be within the range of £45,000,000 to £55,000,000 for the 7.5 year duration.Second stage: 6–null candidates invited to tenderVariant bids: not allowed
Lot #4Lot B2 (R) BuildingsRenewalPublished value£75,000,000

Network Rail is looking to appoint a regional framework supplier to deliver a proportion of the buildings workbank across the North West & Central region: www.networkrail.co.uk/running-the-railway/… ↗

The scope of works which Network Rail may require compromise;

  • Feasibility
  • Survey, investigation, and reporting
  • Option selection (involving outline methodology)
  • Outline and detailed design (including temporary works)
  • Implementation (including demolition)
  • Commissioning
  • Hand back into maintenance
  • Statutory consents and permissions
  • If directed by Network Rail, third party access agreements

These works are to be performed in connection with the following categories of assets, incorporating partial or whole renewal (which may include replacement, removal, major repair, major refurbishment or strengthening) of:

  • Stations (assets contained within such as buildings, platforms, footbridges, train sheds, canopies, retaining walls, lifts and escalators)
  • Light maintenance depots
  • Maintenance delivery units
  • Critical lineside buildings (signal boxes, route operating centres, relay rooms)
  • Non-critical lineside buildings
  • Supply chain operations sites
  • Car parks, footpaths, and hardstanding
  • Renewal of depot plant with multiple interfaces (e.g. wheel lathe / wash plant)
  • Equipment and systems contained within the assets listed above, including M&E systems, fire systems.

This lot relates to a single supplier for the Region. The successful supplier may be required to deliver a proportion of the works within the scope of the discipline lot across the full NW&C Region (North West Route, Central Route and West Coast South Route) in addition to suppliers appointed for the routes (two suppliers for Lot B2 (NW) Buildings in the North West Route, a supplier for Lot B2 (C) Buildings in the Central Route and a supplier for B2 (WCS) Buildings in the West Coast South Route). Network Rail intends to allocate works to the relevant supplier from an annual workbank portfolio on a direct award basis (subject to certain criteria and up to a set percentage of the annual workbank value) as set out in the framework agreement. The estimated value stated at Section II.2.6 relates to the portion of works anticipated to be allocated to the successful supplier in the Region under this lot (lot B2 (R) Buildings). Additional information: The duration stated at II.2.7 and estimated value at II.2.6 relate to the full duration of the agreement, including the mobilisation period (6 months), initial term (60 months) and renewal options (24 months).

Delivery: UK · Network Rail’s North West & Central Region (compromising the North West Route, Central Route and West Coast South Route).
Extensions: The initial term of the framework will be 5 years (following a 6 month mobilisation period) with an option, subject to the successful supplier's performance during the initial term and on-going Network Rail requirements, to extend for a further period of up to 2 years. The estimated total value of Lot B2 (R) Buildings will be within the range of £65,000,000 to £75,000,000 for the 7.5 year durationSecond stage: 6–null candidates invited to tenderVariant bids: not allowed
Lot #5Lot B2 (NW) BuildingsRenewalPublished value£55,000,000

Network Rail is looking to appoint two framework supplier(s) to deliver a proportion of the buildings workbank within the North West Route. This is a geographical sub-lot comprising the North West Route: www.networkrail.co.uk/running-the-railway/… ↗

The scope of works which Network Rail may require comprises:

  • Feasibility
  • Survey, investigation, and reporting
  • Option selection (involving outline methodology)
  • Outline and detailed design (including temporary works)
  • Implementation (including demolition)
  • Commissioning
  • Hand back into maintenance
  • Statutory consents and permissions
  • If directed by Network Rail, third party access agreements

These works are to be performed in connection with the following categories of assets, incorporating partial or whole renewal (which may include replacement, removal, major repair, major refurbishment or strengthening) of:

  • Stations (assets contained within such as buildings, platforms, footbridges, train sheds, canopies, retaining walls, lifts and escalators)
  • Light maintenance depots
  • Maintenance delivery units
  • Critical lineside buildings (signal boxes, route operating centres, relay rooms)
  • Non-critical lineside buildings
  • Supply chain operations sites
  • Car parks, footpaths, and hardstanding
  • Renewal of depot plant with multiple interfaces (e.g. wheel lathe / wash plant)
  • Equipment and systems contained within the assets listed above, including M&E systems, fire systems.

This lot relates to two suppliers for the North West Route. The two successful suppliers may be required to deliver a proportion of the works within the scope of the discipline lot B2 (NW) Buildings in the North West Route in addition to a supplier appointed for the Region (Lot B2 (R) Buildings working across the full NW&C Region (North West Route, Central Route and West Coast South Route)). Network Rail intends to allocate works to the relevant supplier from an annual workbank portfolio on a direct award basis (subject to certain criteria and up to a set percentage of the annual workbank value) as set out in the framework agreement. The estimated value stated at Section II.2.6 relates to the portion of works anticipated to be allocated on an equal basis (as far as possible) such that each of the two frameworks awarded in the North West route under this lot (lot B2 (NW) Buildings) would have an estimated anticipated framework value in the range of £22,500,000 to £27,500,000. Additional information: The duration stated at II.2.7 and estimated value at II.2.6 relate to the full duration of the agreement, including the mobilisation period (6 months), initial term (60 months) and renewal options (24 months).

Delivery: UK · Network Rail’s North West Route.
Extensions: The initial term of the framework will be 5 years (following a 6 month mobilisation period) with an option, subject to each successful supplier's performance during the initial term and ongoing Network Rail requirements, to extend for a further period of up to 2 years. The estimated total value of Lot B2(NW) Buildings will be within the range of £45,000,000 to £55,000,000 for the 7.5 year durationSecond stage: 10–null candidates invited to tenderVariant bids: not allowed
Lot #6Lot B2 (C) BuildingsRenewalPublished value£40,000,000

Network Rail is looking to appoint a framework supplier to deliver a proportion of the buildings workbank within the Central Route. This is a geographical sub-lot comprising the Central Route: www.networkrail.co.uk/running-the-railway/… ↗

The scope of works which Network Rail may require comprises:

  • Feasibility
  • Survey, investigation, and reporting
  • Option selection (involving outline methodology)
  • Outline and detailed design (including temporary works)
  • Implementation (including demolition)
  • Commissioning
  • Hand back into maintenance
  • Statutory consents and permissions
  • If directed by Network Rail, third party access agreements

These works are to be performed in connection with the following categories of assets, incorporating partial or whole renewal (which may include replacement, removal, major repair, major refurbishment or strengthening) of:

  • Stations (assets contained within such as buildings, platforms, footbridges, train sheds, canopies, retaining walls, lifts and escalators)
  • Light maintenance depots
  • Maintenance delivery units
  • Critical lineside buildings (signal boxes, route operating centres, relay rooms)
  • Non-critical lineside buildings
  • Supply chain operations sites
  • Car parks, footpaths, and hardstanding
  • Renewal of depot plant with multiple interfaces (e.g. wheel lathe / wash plant)
  • Equipment and systems contained within the assets listed above, including M&E systems, fire systems.

This lot relates to a single supplier for the Central Route. The successful supplier may be required to deliver a proportion of the works within the scope of the discipline lot B2 (C) Buildings in the Central Route in addition to a supplier appointed for the Region (Lot B2 (R) Buildings working across the full NW&C Region (North West Route, Central Route and West Coast South Route)). Network Rail intends to allocate works to the relevant supplier from an annual workbank portfolio on a direct award basis (subject to certain criteria and up to a set percentage of the annual workbank value) as set out in the framework agreement. The estimated value stated at Section II.2.6 relates to the portion of works anticipated to be allocated to the successful supplier in the Central Route under this lot (lot B2 (C) Buildings). Additional information: The duration stated at II.2.7 and estimated value at II.2.6 relate to the full duration of the agreement, including the mobilisation period (6 months), initial term (60 months) and renewal options (24 months).

Delivery: UK · Network Rail’s Central Route.
Extensions: The initial term of the framework will be 5 years (following a 6 month mobilisation period) with an option, subject to the successful supplier's performance during the initial term and on-going Network Rail requirements, to extend for a further period of up to 2 years. The estimated total value of Lot B2(C) Buildings will be within the range of £30,000,000 to £40,000,000 for the 7.5 year durationSecond stage: 6–null candidates invited to tenderVariant bids: not allowed
Lot #7Lot B2 (WCS) BuildingsRenewalPublished value£40,000,000

Network Rail is looking to appoint a framework supplier to deliver a proportion of the buildings workbank within the West Coast South Route. This is a geographical sub-lot comprising the West Coast South Route: www.networkrail.co.uk/running-the-railway/… ↗

The scope of works which Network Rail may require comprises:

  • Feasibility
  • Survey, investigation, and reporting
  • Option selection (involving outline methodology)
  • Outline and detailed design (including temporary works)
  • Implementation (including demolition)
  • Commissioning
  • Hand back into maintenance
  • Statutory consents and permissions
  • If directed by Network Rail, third party access agreements

These works are to be performed in connection with the following categories of assets, incorporating partial or whole renewal (which may include replacement, removal, major repair, major refurbishment or strengthening) of:

  • Stations (assets contained within such as buildings, platforms, footbridges, train sheds, canopies, retaining walls, lifts and escalators)
  • Light maintenance depots
  • Maintenance delivery units
  • Critical lineside buildings (signal boxes, route operating centres, relay rooms)
  • Non-critical lineside buildings
  • Supply chain operations sites
  • Car parks, footpaths, and hardstanding
  • Renewal of depot plant with multiple interfaces (e.g. wheel lathe / wash plant)
  • Equipment and systems contained within the assets listed above, including M&E systems, fire systems.

This lot relates to a single supplier for the West Coast South Route. The successful supplier may be required to deliver a proportion of the works within the scope of the discipline lot B2 (WCS) Buildings in the West Coast South Route in addition to a supplier appointed for the Region (Lot B2 (R) Buildings working across the full NW&C Region (North West Route, Central Route and West Coast South Route)). Network Rail intends to allocate works to the relevant supplier from an annual workbank portfolio on a direct award basis (subject to certain criteria and up to a set percentage of the annual workbank value) as set out in the framework agreement. The estimated value stated at Section II.2.6 relates to the portion of works anticipated to be allocated to the successful supplier in the West Coast South Route under this lot (lot B2 (WCS) Buildings). Additional information: The duration stated at II.2.7 and estimated value at II.2.6 relate to the full duration of the agreement, including the mobilisation period (6 months), initial term (60 months) and renewal options (24 months).

Delivery: UK · Network Rail’s West Coast South Route.
Extensions: The initial term of the framework will be 5 years (following a 6 month mobilisation period) with an option, subject to the successful supplier's performance during the initial term and ongoing Network Rail requirements, to extend for a further period of up to 2 years. The estimated total value of Lot B2(WCS) Buildings will be within the range of £30,000,000 to £40,000,000 for the 7.5 year durationSecond stage: 6–null candidates invited to tenderVariant bids: not allowed
Lot #8Lot B3 (R) AC SwitchgearRenewalceiling above

Network Rail is looking to appoint a regional framework supplier to deliver the Electrification & Plant: AC Switchgear workbank across the North West & Central region: www.networkrail.co.uk/running-the-railway/… ↗

The scope of works which Network Rail may require comprises:

  • Feasibility
  • Option selection
  • Outline and detailed design (including temporary works)
  • Implementation
  • Commissioning
  • Decommissioning and recovery of redundant assets
  • Hand back into maintenance (including but not limited to record update, providing training and spares)

These works are to be performed in connection with the following categories of assets, incorporating partial or whole renewal of:

  • Major SCADA changes / updates
  • Feeder station power upgrades (inclusive of TNO/DNO engagement)
  • OLE related modification associated with the above

This lot relates to a single supplier for the Region. The successful supplier may be required to deliver works within the scope of the discipline lot across the full NW&C Region (North West Route, Central Route and West Coast South Route). Network Rail intends to allocate works to the relevant supplier from an annual workbank portfolio on a direct award basis as set out in the framework agreement. The estimated value stated at Section II.2.6 relates to the portion of the works anticipated to be allocated to the successful supplier in the Region under this lot (Lot B3 (R) AC Switchgear). Additional information: The duration stated at II.2.7 and estimated value at II.2.6 relate to the full duration of the agreement, including the mobilisation period (6 months), initial term (60 months) and renewal options (24 months).

Delivery: UK · Network Rail’s North West & Central Region (comprising the North West Route, Central Route and West Coast South Route).
Extensions: The initial term of the framework will be 5 years(following a 6 month mobilisation period) with an option, subject to the successful supplier's performance during the initial term and ongoing Network Rail requirements, to extend for a further period of up to 2 years. The estimated total value of Lot B3(R)AC Switchgear will be within the range of £55,000,000 to £65,000,000 for the 7.5 year durationSecond stage: 6–null candidates invited to tenderVariant bids: not allowed
Lot #9Lot B3 (NW) Power & DistributionRenewalPublished value£60,000,000

Network Rail is looking to appoint a framework supplier to deliver the Electrification & Plant: Power & Distribution workbank within the North West Route. This is a geographical sub-lot comprising the North West Route, www.networkrail.co.uk/running-the-railway/… ↗

Network Rail is not intending to appoint a regional framework supplier for this framework discipline as part of Framework Category B.

The scope of works which Network Rail may require comprises:

  • Feasibility
  • Option selection
  • Outline and detailed design (including temporary works)
  • Implementation,
  • Commissioning
  • Decommissioning and recovery of redundant assets
  • Hand back into maintenance (including but not limited to record update, providing training and spares)

These works are to be performed in connection with the following categories of assets, incorporating partial or refurbishment or partial renewal of:

  • Outdoor CB and switches renewal (e.g. SMOS, TSS, DPD etc)
  • Major SCADA changes/updates associated with AC protection relay renewal
  • HV feeder cable replacement and associated route renewal on AC and DC infrastructure
  • OLE related renewals (e.g. OLE structures)
  • AC & DC protection relay
  • DC stage 2 frame leakage installation
  • AC Switchgear (Refurbishment only)

This lot relates to a single supplier for the North West Route. Network Rail intends to allocate works to the relevant supplier from an annual workbank portfolio on a direct award basis (as set out in the framework agreement). The estimated value stated at Section II.2.6 relates to the value of works anticipated to be allocated to the successful supplier in the North West Route under this lot (B3 (NW) Power & Distribution). Additional information: The duration stated at II.2.7 and estimated value at II.2.6 relate to the full duration of the agreement, including the mobilisation period (6 months), initial term (60 months) and renewal options (24 months).

Delivery: UK · Network Rail’s North West Route.
Extensions: The initial term of the framework will be 5 years(following a 6 month mobilisation period) with an option, subject to the successful supplier's performance during the initial term and ongoing Network Rail requirements, to extend for a further period of up to 2 years. The estimated total value of Lot B3(NW)P&D will be within the range of £50,000,000 to £60,000,000 for the 7.5 year durationSecond stage: 6–null candidates invited to tenderVariant bids: not allowed
Lot #10Lot B3 (C&WCS) Power & DistributionRenewalPublished value£160,000,000

Network Rail is looking to appoint a framework supplier to deliver the Electrification & Plant: Power & Distribution workbank across the combined Central Route and West Coast South areas. This is a geographical sub-lot comprising the combined Central Route and West Coast South Route areas, www.networkrail.co.uk/running-the-railway/… ↗

Network Rail is not intending to appoint a regional framework supplier for this framework discipline as part of Framework Category B.

The scope of works which Network Rail may require comprises:

  • Feasibility
  • Option selection
  • Outline and detailed design (including temporary works)
  • Implementation,
  • Commissioning
  • Decommissioning and recovery of redundant assets
  • Hand back into maintenance (including but not limited to record update, providing training and spares)

These works are to be performed in connection with the following categories of assets, incorporating partial or refurbishment or partial renewal of:

  • Outdoor CB and switches renewal (e.g. SMOS, TSS, DPD etc)
  • Major SCADA changes/updates associated with AC protection relay renewal
  • HV feeder cable replacement and associated route renewal on AC and DC infrastructure
  • OLE related renewals (e.g. OLE structures)
  • AC & DC protection relay
  • DC stage 2 frame leakage installation
  • AC Switchgear (Refurbishment only)

This lot relates to a single supplier for the combined Central Route and West Coast South Route areas. Network Rail intends to allocate works to the relevant supplier from an annual workbank portfolio on a direct award basis (as set out in the framework agreement). The estimated value stated at Section II.2.6 relates to the value of works anticipated to be allocated to the successful supplier in the combined Central Route and West Coast South Route areas under this lot (Lot B3 (C&WCS) Power & Distribution). Additional information: The duration stated at II.2.7 and estimated value at II.2.6 relate to the full duration of the agreement, including the mobilisation period (6 months), initial term (60 months) and renewal options (24 months).

Delivery: UK · Network Rail’s combined Central Route and West Coast South Route areas.
Extensions: The initial term of the framework will be 5 years(following a 6 month mobilisation period) with an option, subject to the successful supplier's performance during the initial term and ongoing Network Rail requirements, to extend for a further period of up to 2 years. The estimated total value of Lot B3(C&WCS)P&D will be within the range of £140,000,000 to £160,000,000 for the 7.5 year durationSecond stage: up to 6 candidates invited to tenderVariant bids: not allowed
Lot #11Lot B3 (C&WCS LV) Low Voltage Plant & Signalling PowerRenewalPublished value£30,000,000

Network Rail is looking to appoint a framework supplier to deliver the Electrification & Plant: Low Voltage Plant & Signalling Power workbank across the combined Central Route and West Coast South Route areas. This is a geographical sub-lot comprising the combined Central Route and West Coast South Route areas, www.networkrail.co.uk/running-the-railway/… ↗

Network Rail is not intending to appoint a regional framework supplier for this framework discipline as part of Framework Category B.

The scope of works which Network Rail may require comprises:

  • Feasibility
  • Option selection
  • Outline and detailed design (including temporary works)
  • Implementation,
  • Commissioning
  • Decommissioning and recovery of redundant assets
  • Hand back into maintenance (including but not limited to record update, providing training and spares)

These works are to be performed in connection with the following categories of assets, incorporating partial or refurbishment or partial renewal of:

  • Signalling Power cable renewal
  • Signalling Power (e.g. UPS, Generator, FSP)
  • Lighting (e.g. Junction, buffer stop, walkway)
  • Points heating
  • Pumping systems
  • DNO

This lot relates to a single supplier for the combined Central Route and West Coast South Route areas. Network Rail intends to allocate works to the relevant supplier from an annual workbank portfolio on a direct award basis (as set out in the framework agreement). The estimated value stated at Section II.2.6 relates to the value of works anticipated to be allocated to the successful supplier in the combined Central Route and West Coast South Route areas under this lot (Lot B3 (C&WCS LV) Low Voltage Plant & Signalling Power). Additional information: The duration stated at II.2.7 and estimated value at II.2.6 relate to the full duration of the agreement, including the mobilisation period (6 months), initial term (60 months) and renewal options (24 months).

Delivery: UK · Network Rail’s combined Central Route and West Coast South Route areas.
Extensions: The initial term of the framework will be 5 years (following a 6 month mobilisation period) with an option, subject to the successful supplier's performance during the initial term and on-going Network Rail requirements, to extend for a further period of up to 2 years. The estimated total value of Lot B3 (C&WCS LV) will be within the range of £20,000,000 to £30,000,000 for the 7.5 year duration.Second stage: 6–null candidates invited to tenderVariant bids: not allowed
Lot #12Lot C1 (R) Civil Engineering (Structures & Geotechnical)RenewalPublished value£120,000,000

Network Rail is looking to appoint a regional framework supplier to deliver a proportion of the civil engineering (structures and geotechnical) workbank across the North West & Central region: www.networkrail.co.uk/running-the-railway/… ↗

The scope of works which Network Rail may require comprises:

  • Implementation (including temporary works design and demolition)
  • Commissioning
  • Hand back into maintenance
  • Statutory consents and permissions
  • If directed by Network Rail, third party access agreements

These works are to be performed in connection with the following categories of assets, incorporating partial or whole renewal (which may include replacement, removal, major repair, major refurbishment or strengthening) of:

  • Bridges (underbridges, overbridges, footbridges, property rafts)
  • Viaducts
  • Tunnels
  • Walls (boundary, retaining and acoustic barriers)
  • Drainage including culverts
  • Structures and works associated with river, coastal and estuarine defences
  • Geotechnical (soil embankments, soil cuttings, rock cuttings and associated drainage works)
  • Mining (mine workings, shafts and adits)
  • Ancillary structures (e.g. foundations, support structures, access roads, fencing, gates, steps)

This lot relates to a single supplier for the Region. The successful supplier may be required to deliver a proportion of the works within the scope of the discipline lot across the full NW&C Region (North West Route, Central Route and West Coast South Route) in addition to suppliers appointed for the routes (two suppliers for Lot C1 (NW) Civil Engineering (Structures and Geotechnical) in the North West Route, a supplier for Lot C1 (C) Civil Engineering (Structures and Geotechnical) in the Central Route and a supplier for Lot C1 (WCS) Civil Engineering (Structures & Geotechnical) in the West Coast South Route). Network Rail intends to allocate works to the relevant supplier from an annual workbank portfolio on a direct award basis (subject to certain criteria and up to a set percentage of the annual workbank value) as set out in the framework agreement. The estimated value stated at Section II.2.6 relates to the portion of the works anticipated to be allocated to the successful supplier in the Region under this lot (lot C1 (R) Civil Engineering (Structures and Geotechnical). Additional information: The duration stated at II.2.7 and estimated value at II.2.6 relate to the full duration of the agreement, including the mobilisation period (6 months), initial term (60 months) and renewal options (24 months).

Delivery: UK · Network Rail’s North West & Central Region (comprising the North West Route, Central Route and West Coast South Route).
Extensions: The initial term of the framework will be 5 years (following a 6 month mobilisation period) with an option, subject to the successful supplier's performance during the initial term and on-going Network Rail requirements, to extend for a further period of up to 2 years. The estimated total value of Lot C1 (R) will be within the range of £100,000,000 to £120,000,000 for the 7.5 year duration.Second stage: 6–null candidates invited to tenderVariant bids: not allowed
Lot #13Lot C1 (NW) Civil Engineering (Structures & Geotechnical)RenewalPublished value£95,000,000

Network Rail is looking to appoint two framework supplier(s) to deliver a proportion of the civil engineering (structures and geotechnical) workbank within the North West Route. This is a geographical sub-lot comprising the North West Route: www.networkrail.co.uk/running-the-railway/… ↗

The scope of works which Network Rail may require comprises:

  • Implementation (including temporary works design and demolition)
  • Commissioning
  • Hand back into maintenance
  • Statutory consents and permissions
  • If directed by Network Rail, third party access agreements

These works are to be performed in connection with the following categories of assets, incorporating partial or whole renewal (which may include replacement, removal, major repair, major refurbishment or strengthening) of:

  • Bridges (underbridges, overbridges, footbridges, property rafts)
  • Viaducts
  • Tunnels
  • Walls (boundary, retaining and acoustic barriers)
  • Drainage including culverts
  • Structures and works associated with river, coastal and estuarine defences
  • Geotechnical (soil embankments, soil cuttings, rock cuttings and associated drainage works)
  • Mining (mine workings, shafts and adits)
  • Ancillary structures (e.g. foundations, support structures, access roads, fencing, gates, steps)

This lot relates to two suppliers for the North West Route. The successful suppliers may be required to deliver a proportion of the works within the scope of the discipline lot C1 (NW) Civil Engineering (Structures and Geotechnical) in the North West Route in addition to a supplier appointed for the Region (Lot C1 (R) Civil Engineering (Structures & Geotechnical) working across the full NW&C Region (North West Route, Central Route and West Coast South Route)). Network Rail intends to allocate works to the relevant supplier from an annual workbank portfolio on a direct award basis (subject to certain criteria and up to a set percentage of the annual workbank value) as set out in the framework agreement. The estimated value stated at Section II.2.6 relates to the portion of works anticipated to be allocated on an equal basis (as far as possible) such that each of the two frameworks awarded in the North West route under this lot (lot C1 (NW) Civil Engineering (Structures and Geotechnical)) would have an estimated anticipated framework value in the range of £42,500,000 to £47,500,000. Additional information: The duration stated at II.2.7 and estimated value at II.2.6 relate to the full duration of the agreement, including the mobilisation period (6 months), initial term (60 months) and renewal options (24 months).

Delivery: UK · Network Rail’s North West Route.
Extensions: The initial term of the framework will be 5 years(following a 6 month mobilisation period)with an option, subject to each successful supplier's performance during the initial term and ongoing Network Rail requirements, to extend for a further period of up to 2 years. The estimated total value of Lot C1(NW) will be within the range of £85,000,000 to £95,000,000 for the 7.5 year durationSecond stage: 10–null candidates invited to tenderVariant bids: not allowed
Lot #14Lot C1 (C) Civil Engineering (Structures & Geotechnical)RenewalPublished value£45,000,000

Network Rail is looking to appoint a framework supplier to deliver a proportion of the civil engineering (structures and geotechnical) workbank across the Central Route area. This is a geographical sub-lot comprising the Central Route area: www.networkrail.co.uk/running-the-railway/… ↗

The scope of works which Network Rail may require comprises:

  • Implementation (including temporary works design and demolition)
  • Commissioning
  • Hand back into maintenance
  • Statutory consents and permissions
  • If directed by Network Rail, third party access agreements

These works are to be performed in connection with the following categories of assets, incorporating partial or whole renewal (which may include replacement, removal, major repair, major refurbishment or strengthening) of:

  • Bridges (underbridges, overbridges, footbridges, property rafts)
  • Viaducts
  • Tunnels
  • Walls (boundary, retaining and acoustic barriers)
  • Drainage including culverts
  • Structures and works associated with river, coastal and estuarine defences
  • Geotechnical (soil embankments, soil cuttings, rock cuttings and associated drainage works)
  • Mining (mine workings, shafts and adits)
  • Ancillary structures (e.g. foundations, support structures, access roads, fencing, gates, steps)

This lot relates to a single supplier for the Central Route . The successful supplier may be required to deliver a proportion of the works within the scope of the discipline lot C1 (C) Civil Engineering (Structures and Geotechnical) in the Central Route in addition to a supplier appointed for the Region (Lot C1(R) Civil Engineering (Structures & Geotechnical) working across the full NW&C Region (North West Route, Central Route and West Coast South Route)). Network Rail intends to allocate works to the relevant supplier from an annual workbank portfolio on a direct award basis (subject to certain criteria and up to a set percentage of the annual workbank value) as set out in the framework agreement. The estimated value stated at Section II.2.6 relates to the portion of works anticipated to be allocated to the successful supplier in the Central Route area under this lot (lot C1 (C) Civil Engineering (Structures and Geotechnical)). Additional information: The duration stated at II.2.7 and estimated value at II.2.6 relate to the full duration of the agreement, including the mobilisation period (6 months), initial term (60 months) and renewal options (24 months).

Delivery: UK · Network Rail’s Central Route.
Extensions: The initial term of the framework will be 5 years(following a 6 month mobilisation period)with an option, subject to the successful supplier's performance during the initial term and ongoing Network Rail requirements, to extend for a further period of up to 2 years. The estimated total value of Lot C1(C) will be within the range of £35,000,000 to £45,000,000 for the 7.5 year durationSecond stage: 6–null candidates invited to tenderVariant bids: not allowed
Lot #15Lot C1 (WCS) Civil Engineering (Structures & Geotechnical)RenewalPublished value£45,000,000

Network Rail is looking to appoint a framework supplier to deliver a proportion of the civil engineering (structures and geotechnical) workbank within the West Coast South Route area. This is a geographical sub-lot comprising the West Coast South Route area: www.networkrail.co.uk/running-the-railway/… ↗

The scope of works which Network Rail may require comprises:

  • Implementation (including temporary works design and demolition)
  • Commissioning
  • Hand back into maintenance
  • Statutory consents and permissions
  • If directed by Network Rail, third party access agreements

These works are to be performed in connection with the following categories of assets, incorporating partial or whole renewal (which may include replacement, removal, major repair, major refurbishment or strengthening) of:

  • Bridges (underbridges, overbridges, footbridges, property rafts)
  • Viaducts
  • Tunnels
  • Walls (boundary, retaining and acoustic barriers)
  • Drainage including culverts
  • Structures and works associated with river, coastal and estuarine defences
  • Geotechnical (soil embankments, soil cuttings, rock cuttings and associated drainage works)
  • Mining (mine workings, shafts and adits)
  • Ancillary structures (e.g. foundations, support structures, access roads, fencing, gates, steps)

This lot relates to a single supplier for the West Coast South Route. The successful supplier may be required to deliver a proportion of the works within the scope of the discipline lot C1 (WCS) Civil Engineering (Structures and Geotechnical) in the West Coast South Route in addition to a supplier appointed for the Region (Lot C1 (R) Civil Engineering (Structures & Geotechnical) working across the full NW&C Region (North West Route, Central Route and West Coast South Route)). Network Rail intends to allocate works to the relevant supplier from an annual workbank portfolio on a direct award basis (subject to certain criteria and up to a set percentage of the annual workbank value) as set out in the framework agreement. The estimated value stated at Section II.2.6 relates to the portion of works anticipated to be allocated to the successful supplier in the West Coast South Route area under this lot (lot C1 (WCS) Civil Engineering (Structures and Geotechnical)). Additional information: The duration stated at II.2.7 and estimated value at II.2.6 relate to the full duration of the agreement, including the mobilisation period (6 months), initial term (60 months) and renewal options (24 months).

Delivery: UK · Network Rail’s West Coast South Route.
Extensions: The initial term of the framework will be 5 years (following a 6 month mobilisation period) with an option, subject to the successful supplier's performance during the initial term and on-going Network Rail requirements, to extend for a further period of up to 2 years. The estimated total value of Lot C1 (WCS) will be within the range of £35,000,000 to £45,000,000 for the 7.5 year durationSecond stage: 6–null candidates invited to tenderVariant bids: not allowed
Lot #16Lot C2 (NW) BuildingsRenewalPublished value£15,000,000

Network Rail is looking to appoint a framework supplier to deliver the buildings workbank across the North West Route area. This is a geographical sub-lot comprising the North West Route area, www.networkrail.co.uk/running-the-railway/… ↗

Network Rail is not intending to appoint a regional framework supplier for this framework discipline as part of Framework Category C.

The scope of works which Network Rail may require compromise;

  • Implementation (including temporary works design and demolition)
  • Commissioning
  • Hand back into maintenance
  • Statutory consents and permissions
  • If directed by Network Rail, third party access agreements

These works are to be performed in connection with the following categories of assets, incorporating partial or whole renewal (which may include replacement, removal, major repair, major refurbishment or strengthening) of:

  • Stations (assets contained within such as buildings, platforms, footbridges, train sheds, canopies, retaining walls, lifts and escalators)
  • Light maintenance depots
  • Maintenance delivery units
  • Critical lineside buildings (signal boxes, route operating centres, relay rooms)
  • Non-critical lineside buildings
  • Supply chain operations sites
  • Car parks, footpaths, and hardstanding
  • Equipment and systems contained within the assets listed above, including M&E systems, fire systems.

This lot relates to a single supplier for the North West Route. Network Rail intends to allocate works to the relevant supplier from an annual workbank portfolio on a direct award basis as set out in the framework agreement. The estimated value stated at Section II.2.6 relates to the value of the works anticipated to be allocated to the successful supplier in the North West Route under this lot (lot C2 (NW) Buildings). Additional information: The duration stated at II.2.7 and estimated value at II.2.6 relate to the full duration of the agreement, including the mobilisation period (6 months), initial term (60 months) and renewal options (24 months).

Delivery: UK · Network Rail’s North West Route.
Extensions: The initial term of the framework will be 5 years (following a 6 month mobilisation period) with an option, subject to the successful supplier's performance during the initial term and on-going Network Rail requirements, to extend for a further period of up to 2 years. The estimated total value of Lot C2 (NW) will be within the range of £10,000,000 to £15,000,000 for the 7.5 year duration.Second stage: 6–null candidates invited to tenderVariant bids: not allowed
Lot #17Lot C2 (C&WCS) BuildingsRenewalPublished value£17,000,000

Network Rail is looking to appoint a framework supplier to deliver the buildings workbank across the combined Central Route and West Coast South Route areas. This is a geographical sub-lot comprising the combined Central Route and West Coast South Route areas, www.networkrail.co.uk/running-the-railway/… ↗

Network Rail is not intending to appoint a regional framework supplier for this framework discipline as part of Framework Category C.

The scope of works which Network Rail may require comprises:

  • Implementation (including temporary works design and demolition)
  • Commissioning
  • Hand back into maintenance
  • Statutory consents and permissions
  • If directed by Network Rail, third party access agreements

These works are to be performed in connection with the following categories of assets, incorporating partial or whole renewal (which may include replacement, removal, major repair, major refurbishment or strengthening) of:

  • Stations (assets contained within such as buildings, platforms, footbridges, train sheds, canopies, retaining walls, lifts and escalators)
  • Light maintenance depots
  • Maintenance delivery units
  • Critical lineside buildings (signal boxes, route operating centres, relay rooms)
  • Non-critical lineside buildings
  • Supply chain operations sites
  • Car parks, footpaths, and hardstanding
  • Equipment and systems contained within the assets listed above, including M&E systems, fire systems.

This lot relates to a single supplier for the combined Central Route and West Coast South Route areas. Network Rail intends to allocate works to the relevant supplier from an annual workbank portfolio on a direct award basis as set out in the framework agreement. The estimated value stated at Section II.2.6 relates to the value of works anticipated to be allocated to the successful supplier in the combined Central Route and West Coast South Route area under this lot (lot C2 (C&WCS) Buildings). Additional information: The duration stated at II.2.7 and estimated value at II.2.6 relate to the full duration of the agreement, including the mobilisation period (6 months), initial term (60 months) and renewal options (24 months).

Delivery: UK · Network Rail’s Central Route and West Coast South Route areas.
Extensions: The initial term of the framework will be 5 years(following a 6 month mobilisation period) with an option, subject to the successful supplier's performance during the initial term and ongoing Network Rail requirements, to extend for a further period of up to 2 years. The estimated total value of Lot C2(C&WCS)Buildings will be within the range of £12,000,000 to £17,000,000 for the 7.5 year durationSecond stage: 6–null candidates invited to tenderVariant bids: not allowed
Lot #18Lot C3 (C&WCS) Power & DistributionRenewalPublished value£21,000,000

Network Rail is looking to appoint a framework supplier to deliver the Electrification & Plant: Power & Distribution workbank across the combined Central Route and West Coast South areas. This is a geographical sub-lot comprising the combined Central Route and West Coast South Route areas, www.networkrail.co.uk/running-the-railway/… ↗

Network Rail is not intending to appoint a regional framework supplier for this framework discipline as part of Framework Category C.

The scope of works which Network Rail may require comprises:

  • Implementation (including temporary works design)
  • Commissioning
  • Decommissioning and recovery of redundant assets
  • Hand back into maintenance (including but not limited to record update, providing training and spares)

These works are to be performed in connection with the following categories of assets, incorporating partial or refurbishment or partial renewal of:

  • Non-traction distribution asset (e.g. RMU)
  • DC Switchgear (including HV)
  • ETE (e.g. TIS, negative bonding)

This lot relates to a single supplier for the combined Central Route and West Coast South Route areas. Network Rail intends to allocate works to the relevant supplier from an annual workbank portfolio on a direct award basis as set out in the framework agreement. The estimated value stated at Section II.2.6 relates to the value of works anticipated to be allocated to the successful supplier in the combined Central Route and West Coast South Route areas under this lot (Lot C3 (C&WCS) Power & Distribution). Additional information: The duration stated at II.2.7 and estimated value at II.2.6 relate to the full duration of the agreement, including the mobilisation period (6 months), initial term (60 months) and renewal options (24 months).

Delivery: UK · Network Rail’s combined Central Route and West Coast South Route areas.
Extensions: The initial term of the framework will be 5 years(following a 6 month mobilisation period)with an option, subject to the successful supplier's performance during the initial term and ongoing Network Rail requirements, to extend for a further period of up to 2 years. The estimated total value of Lot C3(C&WCS)P&D will be within the range of £16,000,000 to £21,000,000 for the 7.5 year durationSecond stage: 6–null candidates invited to tenderVariant bids: not allowed
Lot #19Lot D1 (O-C) Civil Engineering (Structures & Geotechnical)RenewalPublished value£125,000,000

Network Rail is looking to appoint two regional framework supplier(s) to deliver a proportion of the civil engineering (structures and geotechnical) minor works and reactive workbank across the North West & Central region: www.networkrail.co.uk/running-the-railway/… ↗

The scope of works which Network Rail may require comprises:

  • Provision of emergency response capability to be able to have an initial on-site presence & response not greater than 2hrs notice.
  • All trades generally associated with civil engineering works on or around the railway infrastructure and its associated surroundings. Including all works associated with structural asset fabric and finishes.
  • Survey, investigation, and testing
  • Outline and detailed design (including temporary works)
  • Implementation
  • Enabling works for inspections and assessments
  • Demolition
  • Booking of possessions, isolations, and road closures
  • Statutory consents and permissions
  • If directed by Network Rail, third party access agreements

These Works are to be performed in connection with the following categories of assets, incorporating inspection, maintenance, repair, partial or whole renewal to parts of:

  • Bridges (underbridges, overbridges, footbridges, property rafts)
  • Viaducts
  • Tunnels
  • Walls (boundary, retaining and acoustic barriers)
  • Drainage including culverts
  • Structures and works associated with river, coastal and estuarine defences
  • Earthworks (soil embankments, soil cuttings, rock cuttings and associated drainage works)
  • Mining (mine workings, shafts and adits)
  • Ancillary structures (e.g. foundations, support structures, access roads, fencing, gates, steps)

Each order under the framework agreement will be categorised by Network Rail to detail the required response time as follows:

  • Emergency – Attend within 2 hours from receipt of order
  • Urgent – Attend within 24 hours from receipt of order
  • Routine – Attend within 7 days from receipt or order
  • Programmed – As stated on the order

Service will be throughout a 24 hour period, 7 day week, 365 days per year and will include necessary cover during annual and public holidays. The two successful suppliers will be required to have adequate persons to respond to the needs of the works and ensure that the operatives are skilled in the appropriate trade or trades to enable prompt resolution of any particular defect notified to the relevant supplier. The suppliers must also have access to plant hire and material supplies to fulfil this requirement.

This lot relates to two suppliers for the Region. The two successful suppliers may be required to deliver a proportion of the works within the scope of the discipline lot D1 (O-C) Civil Engineering (Structures & Geotechnical) across the full NW&C Region (North West Route, Central Route and West Coast South Route) in addition to suppliers appointed for the full NW&C Region (North West Route, Central Route and West Coast South Route) in Lot D1 (R) Civil Engineering (Structures and Geotechnical). Network Rail intends to allocate all orders requiring an emergency response (i.e. site attendance within 2 hours of receipt of the order) to the two successful suppliers under Lot D1 (O-C) Civil Engineering (Structures and Geotechnical).

Network Rail intends to allocate works to the relevant supplier on a direct award basis (subject to certain criteria and up to a set percentage of the annual workbank value) as set out in the framework agreement. The estimated value stated at Section II.2.6 relates to the portion of works anticipated to be allocated on an equal basis (as far as possible) such that each of the two frameworks awarded in the region under this lot (lot D1 (O-C) Civil Engineering (Structures and Geotechnical)) would have an estimated anticipated framework value in the range of £57,500,000 to £62,500,000. Additional information: The duration stated at II.2.7 and estimated value at II.2.6 relate to the full duration of the agreement, including the mobilisation period (6 months), initial term (36 months) and renewal options (24 months).

Delivery: UK · Network Rail’s North West & Central Region (comprising the North West Route, Central Route and West Coast South Route).
Extensions: The initial term of the framework will be 3 years (following a 6 month mobilisation period) with an option, subject to each successful supplier's performance during the initial term and on-going Network Rail requirements, to extend for a further period of up to 2 years. The estimated total value of Lot D1 (O-C) will be within the range of £115,000,000to £125,000,000 for the 5.5 year duration.Second stage: 8–null candidates invited to tenderVariant bids: not allowed
Lot #20Lot D1 (R) Civil Engineering (Structures & Geotechnical)Renewalceiling above

Network Rail is looking to appoint two regional framework supplier(s) to deliver a proportion of the civil engineering (structures and geotechnical) minor works and reactive workbank across the North West & Central region: www.networkrail.co.uk/running-the-railway/… ↗

The scope of works which Network Rail may require comprises:

  • All trades generally associated with civil engineering works on or around the railway infrastructure and its associated surroundings. Including all works associated with structural asset fabric and finishes.
  • Survey, investigation, and testing
  • Outline and detailed design (including temporary works)
  • Implementation
  • Enabling works for inspections and assessments
  • Demolition
  • Booking of possessions, isolations, and road closures
  • Statutory consents and permissions
  • If directed by Network Rail, third party access agreements

These Works are to be performed in connection with the following categories of assets, incorporating inspection, maintenance, repair, partial or whole renewal to parts of:

  • Bridges (underbridges, overbridges, footbridges, property rafts)
  • Viaducts
  • Tunnels
  • Walls (boundary, retaining and acoustic barriers)
  • Drainage including culverts
  • Structures and works associated with river, coastal and estuarine defences
  • Earthworks (soil embankments, soil cuttings, rock cuttings and associated drainage works)
  • Mining (mine workings, shafts and adits)
  • Ancillary structures (e.g. foundations, support structures, access roads, fencing, gates, steps)

Each order under the framework agreement will be categorised by the Network Rail to detail the required response time as follows:

  • Urgent – Attend within 24 hours from receipt of order
  • Routine – Attend within 7 days from receipt or order
  • Programmed – As stated on the order

Service will be throughout a 24 hour period, 7 day week, 365 days per year and will include necessary cover during annual and public holidays. The two successful suppliers will be required to have adequate persons to respond to the needs of the works and ensure that the operatives are skilled in the appropriate trade or trades to enable prompt resolution of any particular defect notified to the relevant supplier. The suppliers must also have access to plant hire and material supplies to fulfil this requirement.

This lot relates to two suppliers for the Region. The two successful suppliers may be required to deliver a proportion of the works within the scope of the discipline lot D1 (R) Civil Engineering (Structures & Geotechnical) across the full NW&C Region (North West Route, Central Route and West Coast South Route) in addition to suppliers appointed for the full NW&C Region (North West Route, Central Route and West Coast South Route) in Lot D1 (O-C) Civil Engineering (Structures and Geotechnical).

Network Rail intends to allocate works to the relevant supplier on a direct award basis (subject to certain criteria and up to a set percentage of the annual workbank value) as set out in the framework agreement. The estimated value stated at Section II.2.6 relates to the portion of works anticipated to be allocated on an equal basis (as far as possible) such that each of the two frameworks awarded in the region under this lot (lot D1 (R) Civil Engineering (Structures and Geotechnical)) would have an estimated anticipated framework value in the range of £27,500,000 to £32,500,000. Additional information: The duration stated at II.2.7 and estimated value at II.2.6 relate to the full duration of the agreement, including the mobilisation period (6 months), initial term (36 months) and renewal options (24 months).

Delivery: UK · Network Rail’s North West & Central Region (comprising the North West Route, Central Route and West Coast South Route).
Extensions: The initial term of the framework will be 3 years (following a 6 month mobilisation period) with an option, subject to each successful supplier's performance during the initial term and on-going Network Rail requirements, to extend for a further period of up to 2 years. The estimated total value of Lot D1 (R) will be within the range of £55,000,000 to £65,000,000 for the 5.5 year duration.Second stage: 8–null candidates invited to tenderVariant bids: not allowed
Lot #21Lot D2 (NW) BuildingsRenewalPublished value£21,000,000

Network Rail is looking to appoint three framework supplier(s) to deliver a proportion of the Buildings minor works and reactive workbank across the North West Route area. This is a geographical sub-lot comprising the North West Route, www.networkrail.co.uk/running-the-railway/… ↗

Network Rail is not intending to appoint a regional framework supplier for this framework discipline as part of Framework Category D.

The scope of works which Network Rail may require comprises:

  • Provision of emergency response capability to be able to have an initial on-site presence & response not greater than 2hrs notice.
  • All trades generally associated with buildings works on or around the railway infrastructure and its associated surroundings. Including all works associated with buildings fabric, finishes, and associated external structures or surroundings.
  • Survey, investigation, and testing
  • Outline and detailed design (including temporary works)
  • Implementation
  • Enabling works for inspections and assessments
  • Demolition
  • Asbestos management and removal
  • Booking of possessions, isolations, and road closures
  • Statutory consents and permissions
  • If directed by Network Rail, third party access agreements

These Works are to be performed in connection with the following categories of assets, incorporating inspection, maintenance, repair, partial or whole renewal to parts of:

  • Stations (assets contained within such as buildings, platforms, footbridges, train sheds, canopies)
  • Light maintenance depots
  • Maintenance delivery units
  • Critical lineside buildings (signal boxes, route operating centres, relay rooms)
  • Non-critical lineside buildings
  • Supply chain operations sites
  • Car parks, footpaths, and hardstanding
  • Walls (boundary, retaining and acoustic barriers)
  • Drainage including culverts
  • Equipment and systems contained within the assets listed above, including M&E systems, air handling units, fire systems, safe access systems, CCTV/auto gates /bollards and shutters, gas/oil fired heating systems, air conditioning and ventilation, electrical power and lighting installations, water distribution systems, electrical & plant equipment.

Each order under the framework agreement will be categorised by Network Rail to detail the required response time as follows:

  • Emergency – Attend within 2 hours from receipt of order
  • Urgent – Attend within 24 hours from receipt of order
  • Routine – Attend within 7 days from receipt or order
  • Programmed – As stated on the order

Service will be throughout a 24 hour period, 7 day week, 365 days per year and will include necessary cover during annual and public holidays. The three suppliers will be required to have adequate persons to respond to the needs of the works and ensure that the operatives are skilled in the appropriate trade or trades to enable prompt resolution of any particular defect notified to the relevant supplier. The suppliers must also have access to plant hire and material supplies to fulfil this requirement.

This lot relates to three suppliers for the North West Route. Network Rail intends to allocate works to the relevant supplier on a direct award basis (subject to certain criteria and up to a set percentage of the annual workbank value) as set out in the framework agreement. The estimated value stated at Section II.2.6 relates to the portion of works anticipated to be allocated on an equal basis (as far as possible) such that each of the three frameworks awarded in the North West Route under this lot (lot D2 (NW) Buildings) would have an estimated anticipated framework value in the range of £5,000,000 to £7,000,000. Additional information: The duration stated at II.2.7 and estimated value at II.2.6 relate to the full duration of the agreement, including the mobilisation period (6 months), initial term (36 months) and renewal options (24 months).

Delivery: UK · Network Rail’s North West Route.
Extensions: The initial term of the framework will be 3 years (following a 6 month mobilisation period) with an option, subject to the successful supplier's performance during the initial term and ongoing Network Rail requirements, to extend for a further period of up to 2 years. The estimated total value of Lot D2 (NW) Buildings will be within the range of £15,000,000 to £21,000,000 for the 5.5 year durationSecond stage: 10–null candidates invited to tenderVariant bids: not allowed
Lot #22Lot D2 (C&WCS) BuildingsRenewalPublished value£18,000,000

Network Rail is looking to appoint three framework supplier(s) to deliver a proportion of the Buildings minor works and reactive workbank across the combined Central Route and West Coast South Route areas. This is a geographical sub-lot comprising the combined Central Route and West Coast South Route areas, www.networkrail.co.uk/running-the-railway/… ↗

Network Rail is not intending to appoint a regional framework supplier for this framework discipline as part of Framework Category D.

The scope of works which Network Rail may require comprises:

  • Provision of emergency response capability to be able to have an initial on-site presence & response not greater than 2hrs notice.
  • All trades generally associated with buildings works on or around the railway infrastructure and its associated surroundings. Including all works associated with buildings fabric, finishes, and associated external structures or surroundings.
  • Survey, investigation, and testing
  • Outline and detailed design (including temporary works)
  • Implementation
  • Enabling works for inspections and assessments
  • Demolition
  • Asbestos management and removal
  • Booking of possessions, isolations, and road closures
  • Statutory consents and permissions
  • If directed by Network Rail, third party access agreements

These Works are to be performed in connection with the following categories of assets, incorporating inspection, maintenance, repair, partial or whole renewal to parts of:

  • Stations (assets contained within such as buildings, platforms, footbridges, train sheds, canopies)
  • Light maintenance depots
  • Maintenance delivery units
  • Critical lineside buildings (signal boxes, route operating centres, relay rooms)
  • Non-critical lineside buildings
  • Supply chain operations sites
  • Car parks, footpaths, and hardstanding
  • Walls (boundary, retaining and acoustic barriers)
  • Drainage including culverts
  • Equipment and systems contained within the assets listed above, including M&E systems, air handling units, fire systems, safe access systems, CCTV/auto gates /bollards and shutters, gas/oil fired heating systems, air conditioning and ventilation, electrical power and lighting installations, water distribution systems, electrical & plant equipment.

Each order under the framework agreement will be categorised by Network Rail to detail the required response time as follows:

  • Emergency – Attend within 2 hours from receipt of order
  • Urgent – Attend within 24 hours from receipt of order
  • Routine – Attend within 7 days from receipt or order
  • Programmed – As stated on the order

Service will be throughout a 24 hour period, 7 day week, 365 days per year and will include necessary cover during annual and public holidays. The three successful suppliers will be required to have adequate persons to respond to the needs of the works and ensure that the operatives are skilled in the appropriate trade or trades to enable prompt resolution of any particular defect notified to the relevant supplier. The suppliers must also have access to plant hire and material supplies to fulfil this requirement.

This lot relates to three suppliers for the combined Central Route and West Coast South Route areas. Network Rail intends to allocate works to the relevant supplier on a direct award basis (subject to certain criteria and up to a set percentage of the annual workbank value) as set out in the framework agreement. The estimated value stated at Section II.2.6 relates to the portion of works anticipated to be allocated on an equal basis (as far as possible) such that each of the three frameworks awarded in the combined Central Route and West Coast South Route areas under this lot (lot D2 (C&WCS) Buildings) would have an estimated anticipated framework value in the range of £4,000,000 to £6,000,000. Additional information: The duration stated at II.2.7 and estimated value at II.2.6 relate to the full duration of the agreement, including the mobilisation period (6 months), initial term (36 months) and renewal options (24 months).

Delivery: UK · Network Rail’s Central Route and West Coast South Route areas.
Extensions: The initial term of the framework will be 3 years (following a 6 month mobilisation period) with an option, subject to each successful supplier's performance during the initial term and on-going Network Rail requirements, to extend for a further period of up to 2 years. The estimated total value of Lot D2 (C&WCS) will be within the range of £12,000,000 to £18,000,000 for the 5.5 year durationSecond stage: 10–null candidates invited to tenderVariant bids: not allowed
Lot #23Lot B1 (C&WCS) Civil Engineering (Structures & Geotechnical)CancelledLot estimate not published

Network Rail has appointed a framework supplier to deliver a proportion of the civil engineering (structures and geotechnical) workbank across the combined Central Route and West Coast South Route areas. This is a geographical sub-lot comprising the combined Central Route and West Coast South Route areas.

The scope of works which Network Rail may require comprises:

  • Feasibility
  • Survey, investigation, and reporting
  • Option selection (involving outline methodology)
  • Outline and detailed design (including temporary works)
  • Implementation (including demolition)
  • Commissioning
  • Hand back into maintenance
  • Statutory consents and permissions
  • If directed by Network Rail, third party access agreements

These works are to be performed in connection with the following categories of assets, incorporating partial or whole renewal (which may include replacement, removal, major repair, major refurbishment or strengthening) of:

  • Bridges (underbridges, overbridges, footbridges, property rafts)
  • Viaducts
  • Tunnels
  • Walls (boundary, retaining and acoustic barriers)
  • Drainage including culverts
  • Structures and works associated with river, coastal and estuarine defences
  • Geotechnical (soil embankments, soil cuttings, rock cuttings and associated drainage works)
  • Mining (mine workings, shafts and adits)
  • Ancillary structures (e.g. foundations, support structures, access roads, fencing, gates, steps)

This lot relates to a single supplier for the combined Central Route and West Coast South Route areas. The successful supplier may be required to deliver works within the scope of the discipline lot B1 (C&WCS) Civil Engineering (Structures and Geotechnical) in the Central Route and West Coast South Route in addition to a supplier appointed for the Region (Lot B1 (R) Civil Engineering (Structures & Geotechnical) working across the full NW&C Region (North West Route, Central Route and West Coast South Route)).

Delivery: UK · Network Rail’s combined Central Route and West Coast South Route areas.
Extensions: The initial term of the framework will be 5 years (following a 2 month mobilisation period) with an option, subject to each successful supplier's performance during the initial term and on-going Network Rail requirements, to extend for a further period of up to 2 years.
Lot #24Lot B1 (NW) Civil Engineering (Structures & Geotechnical)AwardedLot estimate not published

Network Rail has appointed a framework supplier to deliver a proportion of the civil engineering (structures and geotechnical) workbank within the North West Route. This is a geographical sub-lot comprising the North West Route.

The scope of works which Network Rail may require comprises:

  • Feasibility
  • Survey, investigation, and reporting
  • Option selection (involving outline methodology)
  • Outline and detailed design (including temporary works)
  • Implementation (including demolition)
  • Commissioning
  • Hand back into maintenance
  • Statutory consents and permissions
  • If directed by Network Rail, third party access agreements

These works are to be performed in connection with the following categories of assets, incorporating partial or whole renewal (which may include replacement, removal, major repair, major refurbishment or strengthening) of:

  • Bridges (underbridges, overbridges, footbridges, property rafts)
  • Viaducts
  • Tunnels
  • Walls (boundary, retaining and acoustic barriers)
  • Drainage including culverts
  • Structures and works associated with river, coastal and estuarine defences
  • Geotechnical (soil embankments, soil cuttings, rock cuttings and associated drainage works)
  • Mining (mine workings, shafts and adits)
  • Ancillary structures (e.g. foundations, support structures, access roads, fencing, gates, steps)

This lot relates to a single supplier for the North West Route. The successful supplier may be required to deliver works within the scope of the discipline lot B1 (NW) Civil Engineering (Structures and Geotechnical) in the North West Route in addition to a supplier appointed for the Region (Lot B1 (R) Civil Engineering (Structures & Geotechnical) working across the full NW&C Region (North West Route, Central Route and West Coast South Route)).

Delivery: UK · Network Rail’s North West Route.
Extensions: The initial term of the framework will be 5 years (following a 2 month mobilisation period) with an option, subject to each successful supplier's performance during the initial term and on-going Network Rail requirements, to extend for a further period of up to 2 years.
Lot #25Lot B1 (R) Civil Engineering (Structures & Geotechnical)AwardedLot estimate not published

Network Rail has appointed a regional framework supplier to deliver a proportion of the civil engineering (structures and geotechnical) workbank across the North West & Central Region.

The scope of works which Network Rail may require comprises:

  • Feasibility
  • Survey, investigation, and reporting
  • Option selection (involving outline methodology)
  • Outline and detailed design (including temporary works)
  • Implementation (including demolition)
  • Commissioning
  • Hand back into maintenance
  • Statutory consents and permissions
  • If directed by Network Rail, third party access agreements

These works are to be performed in connection with the following categories of assets, incorporating partial or whole renewal (which may include replacement, removal, major repair, major refurbishment or strengthening) of:

  • Bridges (underbridges, overbridges, footbridges, property rafts)
  • Viaducts
  • Tunnels
  • Walls (boundary, retaining and acoustic barriers)
  • Drainage including culverts
  • Structures and works associated with river, coastal and estuarine defences
  • Geotechnical (soil embankments, soil cuttings, rock cuttings and associated drainage works)
  • Mining (mine workings, shafts and adits)
  • Ancillary structures (e.g. foundations, support structures, access roads, fencing, gates, steps)

This lot relates to a single supplier for the Region. The successful supplier may be required to deliver works within the scope of the discipline lot across the full NW&C Region (North West Route, Central Route and West Coast South Route) in addition to suppliers appointed for the routes (Lot B1 (NW) Civil Engineering (Structures and Geotechnical) in the North West Route and Lot B1 (C&WCS) Civil Engineering (Structures and Geotechnical) in the combined Central Route and West Coast South Route areas).

Delivery: UK · Network Rail’s North West & Central Region (comprising the North West Route, Central Route and West Coast South Route).
Extensions: The initial term of the framework will be 5 years (following a 2 month mobilisation period) with an option, subject to each successful supplier's performance during the initial term and on-going Network Rail requirements, to extend for a further period of up to 2 years.

Procedure terms & legal framework

From the official record · publisher note attached
Procedure method
Award procedure without prior publication of a call for competition
Legal basis
CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
Procurement category
Works
Notice status
Awarded without competition
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Direct award (no call for competition)
GPA / WTO covered
Yes (GPA)
Recurring procurement
No (one-off requirement)
First published
21 Apr 2022, 12:32 BST
Last source update
8 Oct 2024, 12:51 BST
FTS notice number
2024/S 000-032234
Classification (CPV)
Building construction workBuilding installation workConstruction workConstruction work for buildings relating to railway transportConstruction work for railways and cable transport systemsEngineering design servicesEngineering design services for the construction of civil engineering worksHigh voltage installation workLow-voltage installation workRailway bridge construction work
+13 moreRailway construction worksRailway embankment construction work
Delivery area
UK
Official registry OCID
ocds-h6vhtk-032f1a Find a Tender
Why no open competition
The procurement falls outside the scope of application of the directive
Published justification

This notice provides an update to the value of the Framework Category D service agreements entered into by the Participants. Each Participant is a party to a separate agreement with Network Rail which is entered into in accordance with the terms of the originally advertised scope.

As part of the original competitive procurement process the Contract Notice stated that the Category D frameworks relate to the delivery of “minor and reactive works” each with a value up to 100k GBP. The estimated total value of the framework was 229,000,000 GBP. The procurement documents made clear that the initial detail provided of the value was an estimation only . The full scope and extent of the relationships between the Participants was clearly detailed in the Contract Notice and in the accompanying procurement documents, and was not linked to or to any extent constrained by the indicative cumulative estimates of value provided.

The Contract Award Notice also noted that the estimated total value was based on Network Rail’s current forecast of future spend under the frameworks. The Contract Award Notice noted that the values are Network Rail’s best estimate based on currently available information, and in particular that any third party spend is not certain at the stage the Contract Award Notice was published.

The Contract Award Notice also noted that the final value of the frameworks may be higher or lower.

Given the nature of the works required under Framework Category D, and as envisaged by the original procurement documents, the estimated individual value set out in the Contract Notice has to be increased, and so, in the interests of transparency Network Rail publish this voluntary ex ante transparency (“VEAT”) notice. Network Rail intend to increase the overall value of the contracts awarded under Framework Category D; and

The individual value for each contract awarded under Framework Category D will be subject to a new limit of 300k GBP. It is also currently anticipated that the total value of the procurement (excluding VAT) for the remainder of the initial term of 3 years and optional 2 years’ extension per contract may increase to 242,348,077.00 GBP.

Review and risk notes
Review procedure

Network Rail will incorporate a minimum 10 calendar day standstill period at the point information on award of the framework agreement is communicated to participants.

Appeals must be lodged in accordance with the Utilities Contracts Regulations 2016 (SI 2016 No. 274) as amended.

Publisher note: NOTE: To register your interest in this notice and obtain any additional information please visit the Find a Tender website: Find a Tender (find-tender.service.gov.uk)

How it was run

Official notice
Run through: Jaggaer · Who buys & how to bid on JAGGAER
Supplier login requiredLanguage: EN
Access & registration note: Free; latest Chrome/Edge/Firefox only — corporate browsers fail
Appointment period ends
29 Jul 2022, 12:00 BST
Submission channel
{"electronicSubmission","written"}
Accepted languages
en
Bid validity
330 days from the deadline
Detailed submission instructions & authority contactsFrom official release

Timeline

21 Apr 1999 → 8 Oct 2024 · 3 dates
  1. Next notice expected
    21 Apr 1999, 00:00 BST
  2. Admission / appointment period endsperiod end, not a bid countdown
    29 Jul 2022, 12:00 BST
  3. Notice published
    8 Oct 2024, 12:51 BST

Notice history

11 events · 9 releases on Find a Tender · since 14 Jun 2022
  1. Published value published: £695,000,000
    14 Jun 2022, 21:46 BST
  2. Status changed to active
    14 Jun 2022, 21:46 BST
  3. Procurement method changed
    14 Jun 2022, 21:46 BST
  4. Deadline published: 29 Jul 2022, 12:00 BST
    14 Jun 2022, 21:46 BST
  5. Published value updated to £229,000,000
    14 Jun 2022, 21:46 BST
    was £695,000,000
  6. Published value updated to £358,000,000
    14 Jun 2022, 21:47 BST
    was £229,000,000
  7. Status changed to complete
    11 Jan 2024, 11:43 GMT
  8. Procurement method changed
    11 Jan 2024, 11:43 GMT
  9. Buyer details updated
    11 Jan 2024, 11:43 GMT
  10. Procurement method changed
    12 Feb 2024, 14:50 GMT
  11. Procurement method changed
    8 Oct 2024, 12:51 BST
Routine re-releases (9)
  • 2024-02: 1 release · 12 Feb 2024
  • 2024-01: 1 release · 11 Jan 2024
  • 2022-06: 3 releases · 14 Jun 2022, 14 Jun 2022
  • 2022-04: 1 release · 21 Apr 2022

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 9admitted to the panel · see the list ↓
Bids received 7
Contracts signed 20latest 12 Mar 2024

42 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.

Contracts

  • Lot B1 (C&WCS) Civil Engineering (Structures & Geotechnical)

    Signed
    12 Mar 2024
    Value
    —
    Status
    active
  • Lot B2 (NW) Buildings

    Signed
    12 Mar 2024
    Value
    —
    Status
    active
  • Lot B2 (C) Buildings

    Signed
    12 Mar 2024
    Value
    —
    Status
    active
  • Lot C1 (C) Civil Engineering (Structures & Geotechnical)

    Signed
    12 Mar 2024
    Value
    —
    Status
    active
  • Lot C1 (WCS) Civil Engineering (Structures & Geotechnical)

    Signed
    12 Mar 2024
    Value
    —
    Status
    active
  • Lot C2 (C&WCS) Buildings

    Signed
    12 Mar 2024
    Value
    —
    Status
    active
  • Lot B3 (NW) Power & Distribution

    Signed
    23 Feb 2024
    Value
    —
    Status
    active
  • Lot B3 (C&WCS) Power & Distribution

    Signed
    23 Feb 2024
    Value
    —
    Status
    active
  • Lot B3 (C&WCS LV) Low Voltage Plant & Signalling Power

    Signed
    23 Feb 2024
    Value
    —
    Status
    active
  • Lot B3 (R) AC Switchgear

    Signed
    23 Feb 2024
    Value
    —
    Status
    active
  • Lot C3 (C&WCS) Power & Distribution

    Signed
    23 Feb 2024
    Value
    —
    Status
    active
  • Lot D1 (O-C) Civil Engineering (Structures & Geotechnical)

    Signed
    12 Feb 2024
    Value
    —
    Status
    active
  • Lot D2 (C&WCS) Buildings

    Signed
    12 Feb 2024
    Value
    —
    Status
    active
  • Lot D1 (O-C) Civil Engineering (Structures & Geotechnical)

    Signed
    12 Feb 2024
    Value
    —
    Status
    active
  • Lot D1 (R) Civil Engineering (Structures & Geotechnical)

    Signed
    12 Feb 2024
    Value
    —
    Status
    active
  • Lot D1 (R) Civil Engineering (Structures & Geotechnical)

    Signed
    12 Feb 2024
    Value
    —
    Status
    active
  • Lot D2 (NW) Buildings

    Signed
    12 Feb 2024
    Value
    —
    Status
    active
  • Lot D2 (NW) Buildings

    Signed
    12 Feb 2024
    Value
    —
    Status
    active
  • Lot D2 (NW) Buildings

    Signed
    12 Feb 2024
    Value
    —
    Status
    active
  • Lot D2 (C&WCS) Buildings

    Signed
    12 Feb 2024
    Value
    —
    Status
    active

Bid statistics published by the authority

LotBidsSMEVCSEValid bid range
24 · Lot B1 (NW) Civil Engineering (Structures & Geotechnical)3bids———
25 · Lot B1 (R) Civil Engineering (Structures & Geotechnical)3bids———
Lot C1 (C)5bids———
Lot C1 (NW)10bids———
Lot C1 (R)4bids———
Lot C1(WCS)4bids———
Lot C2 (C&WCS)3bids———
Lot C2 (NW)5bids———
Lot C3 (C&WCS)3bids———
Lot D1 (OC)6bids———
Lot D1 (R)5bids———
Lot D2 (C&WCS)6bids———
Lot D2 (NW)9bids———
Whole notice7bids———

Contracting authority & participating public bodies

2 public bodies on the notice

Network Rail Infrastructure Ltd

Contracting authorityCentral GovernmentRailway services 1 Eversholt Street, London, UK, NW1 2DNContact email, phone Published organisation website ↗

Dispute resolution & review bodies

  • Network RailReview body LondonContact email
  • The High CourtReview body London
  • see VI.4.3) belowReview body London

Framework contractors & participating bidders

14 commercial parties on the notice
Show 4 more suppliers

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.