Official UK procurement notice
Network Rail North West & Central Region CP7 Frameworks: Framework Category A
Authority: NETWORK RAIL INFRASTRUCTURE LIMITED (Central government)·Consortium: 2 public authorities
What is being bought5 lots · detail below
Published requirement descriptionNetwork Rail has put in place a number of frameworks for Control Period 7 (CP7) for the delivery of capital works in the North West & Central Region. These frameworks are divided into categories and separate Contract Award Notices relate to each of them. This Contract Award Notice relates to Framework Category A.
CP7 covers the 5 year period from 1st April 2024 to 31st March 2029.
The Category A Frameworks cover the North West & Central Region which is formed of 3 routes, North West, Central and West Coast South.
Framework Category A
This category relates to the design and build of “large projects” and includes two separate lots for projects with a value of £7to £200m (Lot A1) and £7m to £50m (Lot A2). Both lots cover the full North West and Central Region.
The scope of works and services proposed to be delivered under Framework Category A is multi-disciplinary across the following three disciplines:
Civil Engineering, which includes but is not limited to;
- Civil engineering works forming and protecting the railway corridor, incorporating structures whether under/over bridge construction, earthwork/geotechnical operations, retaining wall structures and ancillary highway modifications or projects.
Buildings, which includes but is not limited to;
- works to existing and new: stations, depots, platforms and car-parks, operational and other line side buildings including structures / walkways and systems associated with such locations.
Railway Engineering, which includes but is not limited to;
- projects comprising of signalling, permanent way, switches and crossings, associated structure modifications, telecoms and electrification work, and works associated with capacity and line speed improvements. This may include power supply and distribution of electricity for traction and non traction use required for the management of the operational railway.
The scope of the works for the three disciplines includes:
- Feasibility
- Survey, investigation, and reporting
- Option selection (involving outline methodology)
- Outline and detailed design (including temporary works)
- Implementation (including demolition)
- Commissioning
- Hand back into maintenance
- Statutory consents and permissions
- If directed, third party access agreements
The projects to be delivered under Framework Category A may be for the renewal, replacement, refurbishment or enhancement of existing assets, or relate to new assets.
CPV: Building construction work · Construction work · Construction work for buildings relating to railway transport · Construction work for railways and cable transport systems · Electrical installations for railways · Engineering design services · Engineering design services for the construction of civil engineering works · High voltage installation work · Installation services of electrical and mechanical equipment · Low-voltage installation work · Railway bridge construction work · Railway construction works · +9 more
How this framework works
From the published notice- Places
- up to 4 suppliers · 8 bids on the busiest of 2 lots (2.0 per place) · 4 appointed (full)
Lots and requirements (5)Procurement structure
5 lots · 2 with a published value · win at most 1 of themLot #1Lot A1 – Regional Multi-discipline £7m - £200m ProjectsRenewalPublished value£310,750,000
Network Rail is looking to appoint two regional framework suppliers to deliver a proportion of the large projects workbank across the North West & Central region for projects with a value between £7m and £200m.
The scope of works and services which Network Rail may require is multi-disciplinary across the following three disciplines:
Civil Engineering, which includes but is not limited to;
- Civil engineering works forming and protecting the railway corridor, incorporating structures whether under/over bridge construction, earthwork/geotechnical operations, retaining wall structures and ancillary highway modifications or projects.
Buildings, which includes but is not limited to;
- works to existing and new: stations, depots, platforms and car-parks, operational and other line side buildings including structures / walkways and systems associated with such locations.
Railway Engineering, which includes but is not limited to;
- projects comprising of signalling, permanent way, switches and crossings, associated structure modifications, telecoms and electrification work, and works associated with capacity and line speed improvements. This may include power supply and distribution of electricity for traction and non traction use required for the management of the operational railway.
The scope of the works for the three disciplines includes:
- Feasibility
- Survey, investigation, and reporting
- Option selection (involving outline methodology)
- Outline and detailed design (including temporary works)
- Implementation (including demolition)
- Commissioning
- Hand back into maintenance
- Statutory consents and permissions
- If directed, third party access agreements
The projects to be delivered under Framework Category A may be for the renewal, replacement, refurbishment or enhancement of existing assets, or relate to new assets.
Two Suppliers will be awarded a framework agreement for Lot A1 covering the Region. Network Rail intends to allocate works to the relevant supplier using a direct award process on a ‘next in line’ allocation as set out in the framework agreement. The two framework suppliers will be allocated projects with an estimated final cost between £50m and £200m on a rotational basis. In addition, these two framework suppliers will also be allocated projects with an estimated final cost between £7m and £50 on a rotation basis along with the two Lot A2 framework suppliers (see further description below for Lot A2). The estimated value stated at Section II.2.6 relates to the portion of works anticipated to be allocated on an equal basis (as far as possible) such that each of the two frameworks awarded in Lot A1 would have an estimated anticipated value in the range of £145m to £155.375m. Additional information: The duration stated at II.2.7 and estimated value at II.2.6 relate to the full duration of the agreement, including the mobilisation period (1 month), initial term (60 months) and renewal options (24 months).
Lot #2Lot A2 – Multi-discipline £7m – £50m projectsRenewalPublished value£179,250,000
Network Rail is looking to appoint two regional framework suppliers to deliver a proportion of the large projects workbank across the North West & Central region, for projects with a value between £7m and £50m.
The scope of works and services which Network Rail may require is multi-disciplinary across the following three disciplines:
Civil Engineering, which includes but is not limited to;
- Civil engineering works forming and protecting the railway corridor, incorporating structures whether under/over bridge construction, earthwork/geotechnical operations, retaining wall structures and ancillary highway modifications or projects.
Buildings, which includes but is not limited to;
- works to existing and new: stations, depots, platforms and car-parks, operational and other line side buildings including structures / walkways and systems associated with such locations.
Railway Engineering, which includes but is not limited to;
- projects comprising of signalling, permanent way, switches and crossings, associated structure modifications, telecoms and electrification work, and works associated with capacity and line speed improvements. This may include power supply and distribution of electricity for traction and non traction use required for the management of the operational railway.
The scope of the works for the three disciplines includes:
- Feasibility
- Survey, investigation, and reporting
- Option selection (involving outline methodology)
- Outline and detailed design (including temporary works)
- Implementation (including demolition)
- Commissioning
- Hand back into maintenance
- Statutory consents and permissions
- If directed, third party access agreements
The projects to be delivered under Framework Category A may be for the renewal, replacement, refurbishment or enhancement of existing assets, or relate to new assets.
Two Suppliers will be awarded a framework agreement for Lot A2 covering the Region. Network Rail intends to allocate works to the relevant supplier using a direct award process on a ‘next in line’ allocation as set out in the framework agreement. The two framework suppliers will be allocated projects with an anticipated final cost between £7m and £50m on a rotational basis, along with the two Lot A1 framework suppliers (see above description for Lot A1). The estimated value stated at Section II.2.6 relates to the portion of works anticipated to be allocated on an equal basis (as far as possible) such that each of the two frameworks awarded in Lot A2 would have an estimated anticipated value in the range of £85m to £89.625m. Additional information: The duration stated at II.2.7 and estimated value at II.2.6 relate to the full duration of the agreement, including the mobilisation period (1 month, initial term (60 months) and renewal options (24 months).
Lot #3Lot A1 – Regional Multi-discipline £7m - £200m ProjectsAwardedLot estimate not published
Network Rail has appointed two regional framework suppliers to deliver a proportion of the large projects workbank across the North West & Central region for projects with a value between £7m and £200m.
The scope of works and services which Network Rail may require is multi-disciplinary across the following three disciplines:
Civil Engineering, which includes but is not limited to;
- Civil engineering works forming and protecting the railway corridor, incorporating structures whether under/over bridge construction, earthwork/geotechnical operations, retaining wall structures and ancillary highway modifications or projects.
Buildings, which includes but is not limited to;
- works to existing and new: stations, depots, platforms and car-parks, operational and other line side buildings including structures / walkways and systems associated with such locations.
Railway Engineering, which includes but is not limited to;
- projects comprising of signalling, permanent way, switches and crossings, associated structure modifications, telecoms and electrification work, and works associated with capacity and line speed improvements. This may include power supply and distribution of electricity for traction and non traction use required for the management of the operational railway.
The scope of the works for the three disciplines includes:
- Feasibility
- Survey, investigation, and reporting
- Option selection (involving outline methodology)
- Outline and detailed design (including temporary works)
- Implementation (including demolition)
- Commissioning
- Hand back into maintenance
- Statutory consents and permissions
- If directed, third party access agreements
The projects to be delivered under Framework Category A may be for the renewal, replacement, refurbishment or enhancement of existing assets, or relate to new assets.
Lot #4Lot A2 – Multi-discipline £7m – £50m projectsAwardedLot estimate not published
Network Rail has appointed two regional framework suppliers to deliver a proportion of the large projects workbank across the North West & Central region for projects with a value between £7m and £50m.
The scope of works and services which Network Rail may require is multi-disciplinary across the following three disciplines:
Civil Engineering, which includes but is not limited to;
- Civil engineering works forming and protecting the railway corridor, incorporating structures whether under/over bridge construction, earthwork/geotechnical operations, retaining wall structures and ancillary highway modifications or projects.
Buildings, which includes but is not limited to;
- works to existing and new: stations, depots, platforms and car-parks, operational and other line side buildings including structures / walkways and systems associated with such locations.
Railway Engineering, which includes but is not limited to;
- projects comprising of signalling, permanent way, switches and crossings, associated structure modifications, telecoms and electrification work, and works associated with capacity and line speed improvements. This may include power supply and distribution of electricity for traction and non traction use required for the management of the operational railway.
The scope of the works for the three disciplines includes:
- Feasibility
- Survey, investigation, and reporting
- Option selection (involving outline methodology)
- Outline and detailed design (including temporary works)
- Implementation (including demolition)
- Commissioning
- Hand back into maintenance
- Statutory consents and permissions
- If directed, third party access agreements
The projects to be delivered under Framework Category A may be for the renewal, replacement, refurbishment or enhancement of existing assets, or relate to new assets.
Two Suppliers have been awarded a framework agreement for Lot A2 covering the Region. Network Rail intends to allocate works to the relevant supplier using a direct award process on a ‘next in line’ allocation as set out in the framework agreement. The two framework suppliers will be allocated projects with an anticipated final cost between £7m and £50m on a rotational basis, along with the two Lot A1 framework suppliers (see above description for Lot A1)
Lot #5This PIN notice relates to the forthcoming procurement event for the following framework:PlannedLot estimate not published
This PIN notice relates to the forthcoming procurement event for the following framework:
Framework Category A
Large projects (between £7m and £150m). It is expected there will be two lots each comprising a multi-supplier framework. The two lots are based on anticipated project values, with one lot for projects ranging from £7m to £50m and another lot for projects £50m to £150m. Each of the lots will deliver both single discipline and multi-disciplinary large projects across the entire North West and Central Region. The disciplines to be included in each framework lot are Civil Engineering, Buildings and Railway Systems. The maximum framework duration will be 7 years, with an anticipated award date of February 2024.
It is anticipated the general type of projects to be delivered under the framework may consist of the following:
Civil Engineering - Civil engineering works forming and protecting the railway corridor, incorporating structures whether under/over bridge construction, earthwork/geotechnical operations, retaining wall structures and ancillary highway modifications or projects.
Buildings – includes works to existing and new Stations, depots, platforms and car-parks, operational and other line side buildings including structures / walkways associated with station locations.
Railway Engineering – projects comprising of signalling, permanent way, structure modifications, telecoms and electrification work, and works associated with freight capacity and line speed improvements. This may include power supply and distribution of electricity for traction and non traction use required for the management of the operational railway.
The scope of works proposed to be delivered under each lot is typically;
- Survey, investigation, and reporting
- Option selection (involving outline methodology)
- Outline and detailed design (including temporary works)
- Implementation (including demolition)
- Commissioning
- Hand back into maintenance
- Statutory consents and permissions
- If directed, third party access agreements
The value in Section II.1.5 is an estimated value of work to be delivered through these frameworks which is envisaged to be CP7 funded by Network Rail. This value does not take into account any work which a third party may fund which is not known at this stage.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- “Network Rail North West & Central Region CP7 Frameworks: Framework…” is a framework: the contest is a place on its panel, up to 4 suppliers, not a single contract.
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Negotiated procedure with prior call for competition
- Legal basis
- CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 13 Mar 2023, 13:58 GMT
- Last source update
- 26 Mar 2024, 09:29 GMT
- FTS notice number
2024/S 000-009738- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-03b247Find a Tender
- Review procedure
Network Rail will incorporate a minimum 10 calendar day standstill period at the point information on award of the framework agreement is communicated to participants.
Appeals must be lodged in accordance with the Utilities Contracts Regulations 2016 (SI 2016 No. 274) as amended.
Publisher note: The estimated value at II.1.7 relates to the full duration of the agreement, including the mobilisation period (1 month), initial term (60 months) and renewal options (24 months). The estimated total value at section II.1.7 is based on Network Rail’s current forecast of future spend under the frameworks. It should be noted, however, that these values are Network Rail’s best estimate based on currently available information, and in particular that any third party spend is not certain at this stage. The final value of the frameworks may therefore be higher or lower.
How it was run
Official notice- Appointment period ends
- 28 Jul 2023, 12:00 BST
- Submission channel
- {"electronicSubmission","written"}
- Accepted languages
- en
- Bid validity
- 120 days from the deadline
Timeline
18 Apr 2023 → 26 Mar 2024 · 4 dates- Next notice expected18 Apr 2023, 00:00 BST
- Admission / appointment period endsperiod end, not a bid countdown28 Jul 2023, 12:00 BST
- Invitations to tender expected22 Sept 2023, 00:00 BST
- Notice published26 Mar 2024, 09:29 GMT
Notice history
5 events · 3 releases on Find a Tender · since 19 Jun 2023- Status changed to active19 Jun 2023, 12:15 BST
- Procurement method changed19 Jun 2023, 12:15 BST
- Deadline published: 28 Jul 2023, 12:00 BST19 Jun 2023, 12:15 BST
- Buyer details updated19 Jun 2023, 12:15 BST
- Status changed to complete26 Mar 2024, 09:29 GMT
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast4 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
Lot A1 – Regional Multi-discipline £7m - £200m Projects
- Signed
- 19 Mar 2024
- Value
- —
- Status
- active
Lot A1 – Regional Multi-discipline £7m - £200m Projects
- Signed
- 12 Mar 2024
- Value
- —
- Status
- active
Lot A2 – Multi-discipline £7m – £50m projects
- Signed
- 12 Mar 2024
- Value
- —
- Status
- active
Lot A2 – Multi-discipline £7m – £50m projects
- Signed
- 12 Mar 2024
- Value
- —
- Status
- active
Bid statistics published by the authority
| Lot | Bids | SME | VCSE | Valid bid range |
|---|---|---|---|---|
| 3 · Lot A1 – Regional Multi-discipline £7m - £200m Projects | 5bids | — | — | — |
| 4 · Lot A2 – Multi-discipline £7m – £50m projects | 8bids | — | — | — |
Contracting authority & participating public bodies
2 public bodies on the noticeDispute resolution & review bodies
- See V1.4.3 belowReview body
- The High CourtMediation bodyReview bodyReview contact point
Framework contractors & participating bidders
4 commercial parties on the notice- Kier Infrastructure & Overseas LimitedFramework contractor
- Octavius Infrastructure LimitedFramework contractor
- Skanska Construction (UK) LimitedFramework contractor
- Story Contracting LimitedFramework contractor
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria