Official procurement procedure

Network Rail Eastern Routes Partnership Framework

Ancillary works for telecommunications
Building construction work
Building installation work
+16 more
UK
Published value
Not published
Submission deadline Not published
Lots published10
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: Network Rail Infrastructure Ltd: "Network Rail Eastern Routes Partnership Framework". Published status: complete. Published value: Value not published. 10 published lots. Submission deadline not published. See the official notice for participation instructions.
Contracting AuthorityNetwork Rail Infrastructure LtdScope & CategoriesNot publishedSubmission Window
complete
No deadline published
Submission GatewayDirect notice routeLegal Basis & RegimeStandard procurementEstimated Value (exc. VAT)Not published
Bidder Intelligence · Authority Profile: Network Rail Infrastructure Ltd
Market Analytics
View Authority Profile →
Derived from OCDS awards & bid statistics
Published history for Network Rail Infrastructure Ltd. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Requires at least 5 comparable procedures
Competition Density
4.8Bids / Report
8.6% of reports have one bid
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate available
Payment Terms
Check noticePublished terms
Payment obligations depend on the applicable regime and contract. Consult the official documents.
Coverage: 192 active published awards; 128 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityNetwork Rail Infrastructure Ltd
Procedure methodNot published
Procurement categoryNot published
Statuscomplete
Framework / DPSFramework
CompetitionNot published
Above thresholdNot published
Legal basisNot published
Tender period startsNot published
Clarification deadlineNot published
Electronic submissionNot published
Submission languagesNot published
Published6 Sept 2024, 12:48 BST
Last source update6 Sept 2024, 12:48 BST
Recurring procurementNot published
ClassificationAncillary works for telecommunications, Building construction work, Building installation work, Construction work, Construction work for buildings relating to railway transport, Construction work for railways and cable transport systems, Electrical installation work of electrical distribution apparatus, Geotechnical engineering services, High voltage installation work, Installation of telecommunications equipment, Low-voltage installation work, Overhead line construction, Railway bridge construction work, Railway engineering services, Railway signalling works, Railway station construction work, Site preparation work, Track construction works, Works for complete or part construction and civil engineering work
Delivery area
UK
OCIDocds-h6vhtk-03ad6c
What is being bought
Network Rail Infrastructure Ltd (NR) has sought Partners to appoint to the Eastern Routes Partnership (ERP) framework. The ERP is the main route to market for the Eastern Region to support the delivery of projects under NR's Strategic Business Plan (SBP), as well as other projects with a core technical discipline. The geographical scope of the ERP is the Eastern Region. (https://www.networkrail.co.uk/running-the-railway/our-regions/eastern/). The initial term of the ERP is 5 years (plus a 2 month mobilisation) with an option to extend the ERP by yearly increments up to a further 5 years. The ERP comprises two levels: Generalist and Specialist. The process for allocating projects is set out at Section VI.3. NR has actively encouraged SMEs, new entrants and/or discipline experts to participate in the process for the Specialist level. For the Generalist level, NR has engaged suppliers able to take on projects with increased complexity/stakeholder management, which possess the ability to deliver the volumes required against the desired unit rates to deliver the SBP. The values for each Lot are estimates only, based on SBP budgets rather than delivery plan values. As such, they are not guaranteed and do not act as a minimum or maximum workbank value for the control period nor a guarantee as to volume split of work-type. A Partnership Agreement sits alongside the ERP and comprises NR and the Generalist contractors. Specialist contractors may join the Partnership if the ERP is extended beyond the initial 5 years. The core Partnership aims are to: a) create a collaborative environment; b) hold NR and all Partner-contractors to account; and c) undertake the efficiency challenge in delivering the ERP workbank safely. The ERP includes a pain-gain incentive mechanism, based on the difference between the Annual Actual Cost and the Annual Project Target cost. The Annual Project Target Costs are all derived from the Client’s budget. A Portfolio Incentivisation Fund will also be set up at a Partnership Level, distributing savings across Partner-contractors.
What changed
From the official release history
  1. tender value changed
    6 Sept 2024, 12:48 BST
  2. Status changed to complete
    6 Sept 2024, 12:48 BST
  3. Official notice release published
    6 Sept 2024, 12:48 BST
  4. Submission deadline changed to published date
    6 Sept 2024, 12:48 BST
  5. Buyer information updated
    6 Sept 2024, 12:48 BST
  6. Published value updated to £3,500,000,000
    21 Apr 2023, 16:06 BST
  7. Status changed to active
    21 Apr 2023, 16:06 BST
  8. Official notice release published
    21 Apr 2023, 16:06 BST
  9. Submission deadline changed to 2 Jun 2023, 12:00 BST
    21 Apr 2023, 16:06 BST
  10. Buyer information updated
    21 Apr 2023, 16:06 BST
  11. Published value updated to £1
    1 Mar 2023, 22:02 GMT
  12. Status changed to planned
    1 Mar 2023, 22:02 GMT
  13. Official notice release published
    1 Mar 2023, 22:02 GMT
  14. Buyer information updated
    1 Mar 2023, 22:02 GMT
Lots and requirements (10)
Published by the contracting authority
  • Lot 1 · #1A
    Lot 1A Generalist Buildings & Civils
    cancelled
    Published valueNot published
    The scope of work type to be delivered includes but not limited to the following:- Building/civils and associated mechanical and electrical works for: Buildings (Station & Lineside), Light Maintenance Depots, Maintenance Delivery Units, Platform, Canopies, Train sheds, Footbridges, Car Parks and roads and Asbestos contaminated buildings. Mechanical & Electrical (M&E) for: Lifts and escalators, Cable route works, Mechanical, Electrical, Depot plant, Lifts and Escalators and Cable route works. Structural works for: Underbridges, Preventative Tunnel interventions, Culverts, Overbridges, Tunnel Repair, Retaining structures, Footbridges, Equipment support structures (signal posts/OLE gantries) and Scour Works. Geotechnical works for: Earthwork Embankment, Condition monitoring, Earthwork Soil Cutting, Earthwork Rock Cuttings, Drainage and Off-Track. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
  • Lot 2 · #1B
    Lot 1B Specialist Structures
    cancelled
    Published valueNot published
    The scope of work type to be delivered is Primarily that of Structures and associated works but may also include and not limited to the following:- Building/civils and associated mechanical and electrical works for: Buildings (Station & Lineside), Light Maintenance Depots, Maintenance Delivery Units, Platform, Canopies, Train sheds, Footbridges, Car Parks and roads and Asbestos contaminated buildings. Mechanical & Electrical (M&E) for: Lifts and escalators, Cable route works, Mechanical, Electrical, Depot plant, Lifts and Escalators and Cable route works. Structural works for: Underbridges, Preventative Tunnel interventions, Culverts, Overbridges, Tunnel Repair, Retaining structures, Footbridges, Equipment support structures (signal posts/OLE gantries) and Scour Works. Could include Geotechnic works for: Earthwork Embankment, Condition monitoring, Earthwork Soil Cutting, Earthwork Rock Cuttings, Drainage and Off-Track. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
  • Lot 3 · #1C
    Lot 1C Specialist Geotechnical
    cancelled
    Published valueNot published
    The scope of work type to be delivered is Primarily that of Geotechnical and associated works but may also include and not limited to the following:- Building/civils and associated mechanical and electrical works for: Buildings (Station & Lineside), Light Maintenance Depots, Maintenance Delivery Units, Platform, Canopies, Train sheds, Footbridges, Car Parks and roads and Asbestos contaminated buildings. Mechanical & Electrical (M&E) for: Lifts and escalators, Cable route works, Mechanical, Electrical, Depot plant, Lifts and Escalators and Cable route works. Optional Structural works for: Underbridges, Preventative Tunnel interventions, Culverts, Overbridges, Tunnel Repair, Retaining structures, Footbridges, Equipment support structures (signal posts/OLE gantries) and Scour Works. Geotechnic works for: Earthwork Embankment, Condition monitoring, Earthwork Soil Cutting, Earthwork Rock Cuttings, Drainage and Off-Track. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
  • Lot 4 · #2A
    Lot 2A Generalist Signalling and Telecoms
    cancelled
    Published valueNot published
    The scope of work type to be delivered includes but not limited to the following:- Interlocking & NX panels works for: Re-wire/Life extend. Route Relay Interlocking alterations to account for any new trackside works. Alterations to existing Solid State Interlockings (SSI) to account for any new trackside works. Entrance Exit (NX) panel updates. Level Crossing Predictor/Controller works for: Level crossing Life Extension Works (LEW) for all types of crossings. Level crossings renewals for all types of level crossings. Conversion of mechanical winding barriers. Transmission / Network works for: Intelligent infrastructure installations. TDM renewals. Provision of FTNX / FTNX points of presence in signaling equipment rooms (inc. REBs). Remove of obsolete equipment - transmission (CCTV, TDM & FDM). Track/Way Side (Equipment Housing, Power, Terminals, Signals, Points, Train Detection) works for: Life Extension works. Including signal conversion, location case renewal and re-wire. Intelligent infrastructure installations. Alterations to signaling power supplies. Track circuit conversions. Ground frame conversion to Ground Switch Panel (GSP) Provision of staff protection systems. Targeting component renewals - HABDs / REBs / LOCs. Cable route works including multi core cable renewals. AWS, TPWS renewal. Signaling Bonding works. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
  • Lot 5 · #2B
    Lot 2B Specialist Signaling
    cancelled
    Published valueNot published
    The scope of work type to be delivered is Primarily that of Signaling and associated works but may also include and not limited to the following:- Interlocking & NX panels works for: Re-wire/Life extend. Route Relay Interlocking alterations to account for any new trackside works. Alterations to existing Solid State Interlockings (SSI) to account for any new trackside works. Entrance Exit (NX) panel updates. Level Crossing Predictor/Controller works for: Level crossing Life Extension Works (LEW) for all types of crossings. Level crossings renewals for all types of level crossings. Conversion of mechanical winding barriers. Transmission / Network works for: Intelligent infrastructure installations. TDM renewals. Provision of FTNX / FTNX points of presence in signaling equipment rooms (inc. REBs). Remove of obsolete equipment - transmission (CCTV, TDM & FDM). Track/Way Side (Equipment Housing, Power, Terminals, Signals, Points, Train Detection) works for: Life Extension works. Including signal conversion, location case renewal and re-wire. Intelligent infrastructure installations. Alterations to signaling power supplies. Track circuit conversions. Ground frame conversion to Ground Switch Panel (GSP) Provision of staff protection systems. Targeting component renewals - HABDs / REBs / LOCs. Cable route works including multi core cable renewals. AWS, TPWS renewal. Signaling Bonding works. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
  • Lot 6 · #2C
    Lot 2C Specialist Telecoms
    cancelled
    Published valueNot published
    The scope of work type to be delivered is Primarily that of Telecommunications and associated works but may also include and not limited to the following:- Interlocking & NX panels works for: Re-wire/Life extend. Route Relay Interlocking alterations to account for any new trackside works. Alterations to existing Solid State Interlockings (SSI) to account for any new trackside works. Entrance Exit (NX) panel updates. Level Crossing Predictor/Controller works for: Level crossing Life Extension Works (LEW) for all types of crossings. Level crossings renewals for all types of level crossings. Conversion of mechanical winding barriers. Transmission / Network works for: Intelligent infrastructure installations. TDM renewals. Provision of FTNX / FTNX points of presence in signaling equipment rooms (inc. REBs). Remove of obsolete equipment - transmission (CCTV, TDM & FDM). Track/Way Side (Equipment Housing, Power, Terminals, Signals, Points, Train Detection) works for: Life Extension works. Including signal conversion, location case renewal and re-wire. Intelligent infrastructure installations. Alterations to signalling power supplies. Track circuit conversions. Ground frame conversion to Ground Switch Panel (GSP) Provision of staff protection systems. Targeting component renewals - HABDs / REBs / LOCs. Cable route works including multi core cable renewals. AWS, TPWS renewal. Signaling Bonding works. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
  • Lot 7 · #3A
    Lot 3A Generalist Contact Systems
    cancelled
    Published valueNot published
    The scope of work type to be delivered includes but not limited to the following:- AC/DC contact systems works for: Structure renewal & refurbishment. Geotechnical assessment. Overhead Line Equipment (OLE) campaign changes (rectification of known issues). OLE re-wire. Crossover/Section insulator replacement (including potential re-design if required). Section insulator replacement. Mid-life refurbishment. Neutral section replacement (including carrier wire style neutral section design & installation). Solid conductor beam refurbishment (& bonding). OLE switch replacement. Ancillary conductor re-wire. Other Items included in the Scope: Forensic analysis (root cause analysis of failures). Isolation instructions and/or isolation diagram corrections, correlation and reviews . Legacy equipment renewal (design knowledge required) this includes Mechanically Independent Registration and any conversion of headspans. Survey e.g. drone, point cloud, etc. for structures. Tunnel renewals (fixed overhead line equipment, steelwork). Mitigations at reduced clearance locations (flashover mitigations). Traction bonding renewal. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
  • Lot 8 · #3B
    Lot 3B Specialist Contact Systems
    cancelled
    Published valueNot published
    The scope of work type to be delivered includes but not limited to the following:- AC/DC contact systems works for: Structure renewal & refurbishment. Geotechnical assessment. Overhead Line Equipment (OLE) campaign changes (rectification of known issues). OLE re-wire. Crossover/Section insulator replacement (including potential re-design if required). Section insulator replacement. Mid-life refurbishment. Neutral section replacement (including carrier wire style neutral section design & installation). Solid conductor beam refurbishment (& bonding). OLE switch replacement. Ancillary conductor re-wire. Other Items included in the Scope: Forensic analysis (root cause analysis of failures). Isolation instructions and/or isolation diagram corrections, correlation and reviews . Legacy equipment renewal (design knowledge required) this includes Mechanically Independent Registration and any conversion of headspans. Survey e.g. drone, point cloud, etc. for structures. Tunnel renewals (fixed overhead line equipment, steelwork). Mitigations at reduced clearance locations (flashover mitigations). Traction bonding renewal. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
  • Lot 9 · #4A
    Lot 4A Generalist Distribution & Plant
    cancelled
    Published valueNot published
    The scope of work type to be delivered includes but not limited to the following:- HV traction distribution works for: HV Substation Renewal/Refurbishment. SCADA modifications inc control room updates. OLE power connections (switch relocation / redesign). Traction derived signalling power supplies. Signalling power works for replacement of signalling power supply equipment Lighting and associated LV distribution works for: Walkway lighting and columns. Operational lighting (buffer stops etc.). Rail yard lighting and columns. Tunnel lighting. Level crossing CCTV and lighting. Other works: Lineside operational equipment and monitoring (Wheelchex/Panchex, etc). Drainage pumps and associated equipment. Low voltage and control equipment. Points heating. Control Centre power resilience. Swing bridge controls replacement. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
  • Lot 10 · #4B
    Lot 4B Specialist Distribution & Plant
    cancelled
    Published valueNot published
    The scope of work type to be delivered includes but not limited to the following:- HV traction distribution works for: HV Substation Renewal/Refurbishment. SCADA modifications inc control room updates. OLE power connections (switch relocation / redesign). Traction derived signalling power supplies. Signalling power works for replacement of signalling power supply equipment Lighting and associated LV distribution works for: Walkway lighting and columns. Operational lighting (buffer stops etc.). Rail yard lighting and columns. Tunnel lighting. Level crossing CCTV and lighting. Other works: Lineside operational equipment and monitoring (Wheelchex/Panchex, etc). Drainage pumps and associated equipment. Low voltage and control equipment. Points heating. Control Centre power resilience. Swing bridge controls replacement. Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
Timeline
  1. Procedure published
    6 Sept 2024, 12:48 BST
  2. Award active
    Not published · Not published
  3. Award active
    Not published · Not published
  4. Award active
    Not published · Not published
  5. Award active
    Not published · Not published
  6. Award active
    Not published · Not published
  7. Award active
    Not published · Not published
  8. Award active
    Not published · Not published
  9. Award active
    Not published · Not published
  10. Award active
    Not published · Not published
  11. Award active
    Not published · Not published
  12. Award active
    Not published · Not published
  13. Award active
    Not published · Not published
  14. Award active
    Not published · Not published
  15. Award active
    Not published · Not published
  16. Award active
    Not published · Not published
  17. Award active
    Not published · Not published
  18. Contract active
    Signed 8 Aug 2024, 00:00 BST · £87,500,000
  19. Contract active
    Signed 19 Jun 2024, 00:00 BST · £1,284,000,000
  20. Contract active
    Signed 18 Jun 2024, 00:00 BST · £852,000,000
  21. Contract active
    Signed 13 Jun 2024, 00:00 BST · £1,284,000,000
  22. Contract active
    Signed 7 Jun 2024, 00:00 BST · £852,000,000
  23. Contract active
    Signed 7 Jun 2024, 00:00 BST · £361,750,000
  24. Contract active
    Signed 7 Jun 2024, 00:00 BST · £70,000,000
  25. Contract active
    Signed 6 Jun 2024, 00:00 BST · £1,284,000,000
  26. Contract active
    Signed 28 May 2024, 00:00 BST · £1,284,000,000
  27. Contract active
    Signed 28 May 2024, 00:00 BST · £361,750,000
  28. Contract active
    Signed 28 May 2024, 00:00 BST · £497,250,000
  29. Contract active
    Signed 24 May 2024, 00:00 BST · £497,250,000
  30. Contract active
    Signed 24 May 2024, 00:00 BST · £64,000,000
  31. Contract active
    Signed 24 May 2024, 00:00 BST · £1,284,000,000
  32. Contract active
    Signed 24 May 2024, 00:00 BST · £88,500,000
  33. Contract active
    Signed 24 May 2024, 00:00 BST · £70,000,000
Commercial outcome and competition
Awards
Amalgamated Construction Ltd
Not published · Not published · active
BAM Nuttall Ltd
Not published · Not published · active
Morgan Sindall Construction & Infrastructure Ltd
Not published · Not published · active
Story Contracting Limited
Not published · Not published · active
Amey Rail Limited
Not published · Not published · active
ATKINSRÉALIS UK LIMITED
Not published · Not published · active
Amey Rail Limited
Not published · Not published · active
Keltbray Rail Limited
Not published · Not published · active
Keltbray Rail Limited / Linbrooke Services Limited together forming Keltbray Linbrooke Partnership (KLP)
Not published · Not published · active
Octavius Infrastructure Limited
Not published · Not published · active
Taziker Industrial Ltd
Not published · Not published · active
CK Rail Solutions Ltd
Not published · Not published · active
Trackwork Ltd
Not published · Not published · active
Hawthorne Contract Services Limited
Not published · Not published · active
Morgan Sindall Construction & Infrastructure Ltd
Not published · Not published · active
Lowery Ltd
Not published · Not published · active
Contracts
Lot 4B Specialist Distribution & Plant
£87,500,000 · signed 8 Aug 2024, 00:00 BST · active
Lot 1A Generalist Buildings & Civils
£1,284,000,000 · signed 19 Jun 2024, 00:00 BST · active
Lot 2A Generalist Signaling and Telecoms
£852,000,000 · signed 18 Jun 2024, 00:00 BST · active
Lot 1A Generalist Buildings & Civils
£1,284,000,000 · signed 13 Jun 2024, 00:00 BST · active
Lot 2A Generalist Signaling and Telecoms
£852,000,000 · signed 7 Jun 2024, 00:00 BST · active
Lot 3A Generalist Contact Systems
£361,750,000 · signed 7 Jun 2024, 00:00 BST · active
Lot 3B Specialist Contact Systems
£70,000,000 · signed 7 Jun 2024, 00:00 BST · active
Lot 1A Generalist Buildings & Civils
£1,284,000,000 · signed 6 Jun 2024, 00:00 BST · active
Lot 1A Generalist Buildings & Civils
£1,284,000,000 · signed 28 May 2024, 00:00 BST · active
Lot 3A Generalist Contact Systems
£361,750,000 · signed 28 May 2024, 00:00 BST · active
Lot 4A Generalist Distribution & Plant
£497,250,000 · signed 28 May 2024, 00:00 BST · active
Lot 4A Generalist Distribution & Plant
£497,250,000 · signed 24 May 2024, 00:00 BST · active
Lot 1B Specialist Structures
£64,000,000 · signed 24 May 2024, 00:00 BST · active
Lot 1C Specialist Geotechnical
£1,284,000,000 · signed 24 May 2024, 00:00 BST · active
Lot 2B Specialist Signaling
£88,500,000 · signed 24 May 2024, 00:00 BST · active
Lot 2C Specialist Telecoms
£70,000,000 · signed 24 May 2024, 00:00 BST · active
Bid statistics
bids: 7 (lot 1A)
bids: 7 (lot 1A)
bids: 7 (lot 1A)
bids: 7 (lot 1A)
bids: 2 (lot 1B)
bids: 4 (lot 1C)
bids: 5 (lot 2A)
bids: 5 (lot 2A)
bids: 4 (lot 2B)
bids: 3 (lot 2C)
bids: 5 (lot 3A)
bids: 5 (lot 3A)
bids: 3 (lot 3B)
bids: 5 (lot 4A)
bids: 5 (lot 4A)
bids: 4 (lot 4B)
Buyer and organisations in this procedure

Network Rail Infrastructure Ltd

Contracting authority GB-FTS-79855
View buyer profile
  • Network Rail Infrastructure Ltd
    buyer

    Waterloo General Offices, London, UK, SE1 8SW
    +44 1908781000
  • ATKINSRÉALIS UK LIMITED
    supplier

    Surrey, UK
  • Amalgamated Construction Ltd
    supplier

    Leeds, UK
  • Amey Rail Limited
    supplier

    London, UK
  • Amey Rail Limited
    supplier

    LONDON, UK
  • BAM Nuttall Ltd
    supplier

    Surrey, UK
  • CK Rail Solutions Ltd
    supplier

    Sheffield, UK
  • Cabinet Office
    reviewContactPoint

    70 Whitehall, London, SW1A 2AS
  • Hawthorne Contract Services Limited
    supplier

    York, UK
  • High Court of England and Wales Royal Courts of Justice
    mediationBody
    reviewBody

    Strand, London, WC1A 2LL
  • Keltbray Rail Limited
    supplier

    Esher, UK
  • Keltbray Rail Limited / Linbrooke Services Limited together forming Keltbray Linbrooke Partnership (KLP)
    supplier

    Esher and Sheffield, UK
  • Lowery Ltd
    supplier

    Staines Upon Thames, UK
  • Morgan Sindall Construction & Infrastructure Ltd
    supplier

    LONDON, UK
  • Octavius Infrastructure Limited
    supplier

    Reigate, UK
  • Story Contracting Limited
    supplier

    Cumbria, UK
  • Taziker Industrial Ltd
    supplier

    Chorley, UK
  • Trackwork Ltd
    supplier

    Doncaster, UK
Documents (0)
Official links; attachments are not copied
No data
No linked documents are published
Related procedures (0)
No data
No related procedures published