Find a Tender
planned
Official procurement procedure
Market Capability Survey: Drainage Inspection and Maintenance
Drainage construction works
Drainage equipment
Drainage pipes
+3 more
UK
Published value
Not published
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: Network Rail Infrastructure Ltd: "Market Capability Survey: Drainage Inspection and Maintenance". Published status: planned. Published value: Value not published. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
| Contracting Authority | Network Rail Infrastructure Ltd | Scope & Categories | Not published | Submission Window | planned No deadline published |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | Not published |
Bidder Intelligence · Authority Profile: Network Rail Infrastructure Ltd
Market Analytics
Derived from OCDS awards & bid statistics
Published history for Network Rail Infrastructure Ltd. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Competition Density
5.5Bids / Report
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate availablePayment Terms
Check noticePublished terms
Coverage: 111 active published awards; 67 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityNetwork Rail Infrastructure Ltd | Procedure methodNot published | Procurement categoryNot published |
Statusplanned | Framework / DPSNot published | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published30 Nov 2021, 22:45 GMT | Last source update30 Nov 2021, 22:45 GMT | Recurring procurementNot published |
ClassificationDrainage construction works, Drainage equipment, Drainage pipes, Drainage system, Drainage works, Ground-drainage work | ||
Delivery area UK | ||
OCIDocds-h6vhtk-02fba6 | ||
What is being bought
The requirements
Eastern Region has initiated a project to review the requirements of the Lord Robert Mair drainage recommendations and assess their requirements and the implication on Eastern Region. Several operating models will be proposed and will detail the benefits and risks of each. It will also describe implications on market capabilities, cost etc.
Types of Drainage Assets
• Catchpit
• Inflow/outfall
• Intercepter
• Pumping station
• Soakaway
• Channel/flume
• Pipe
• Pond
• Culvert
• Granular drain
What constitutes drainage inspection
“Drainage inspections gather visible information relating to the structure and performance of the drainage system as well as the parent assets such as earthworks, structures and track.
Drainage inspections have two levels of details:
a) Drainage System Defect Inspection is a basic visual inspection which is also included as part of the Condition Inspection.
b) Drainage System Condition Inspection is the baseline inspection which is required for all drainage assets in order to collect condition data and should cover the drainage system (inflows to outfall).
The My Work App has been created to allow inspection data to be collected consistently and to upload the information into Ellipse. This eliminates the need for paperwork and enables functionality such as Global Navigation Satellite System data recording, photographs, editing attributes and the creation of work arising to be completed quickly and within defined scripts. Whenever possible the use of the My Work App is recommended.
Where more detailed information is required, the inspection should be supported by a survey (see NR/L2/CIV/005/05, Drainage Survey.” (definition in accordance with NR/L2/CIV/005, Module 4, Drainage Inspection, p.7)
What constitutes drainage maintenance
Drainage maintenance, both manual and mechanised, will be undertaken in accordance NR/L2/CIV/005, Modules 11 – 15; and will be specified by the Senior Asset Engineers in the Route Engineering team.
Manual work includes: rodding of pipes, vegetation removal and recutting ditching, replacement of catchpit lids and rings, desilting and repair of culvert headwalls etc.
Mechanised maintenance would be primarily jetting.
Critical success factors
1) measurable condition score improvement;
2) performance improvement re. reduction of TSRs, reduction in flood events, reduction in wet beds/rough ride reports;
3) Earthwork stability
4) Achieve unit rate
If you would like to take part in the market capability survey please access it using this link: https://forms.office.com/Pages/ResponsePage.aspx?id=4cMswn9dTU--A9WhWMyUCWhHaewLIQ5KvEXxQkx8u7RURExZSlZZOTBSMFZBMjRBRDJCQjNGMkxaMS4u
If you have any issues accessing the survey please direct your queries to shruthimariam.george@networkrail.co.uk.
What changed
From the official release history
- Status changed to planned
30 Nov 2021, 22:45 GMT - Official notice release published
30 Nov 2021, 22:45 GMT - Buyer information updated
30 Nov 2021, 22:45 GMT
Lots and requirements (1)
Published by the contracting authority
- Lot 1 · #1Individual lot title not publishedplannedPublished valueNot published**PLEASE NOT THAT THIS PIN IS ONLY FOR A MARKET CAPABILITY SURVEY AND NOT A CALL FOR COMPETITION** The requirements Eastern Region has initiated a project to review the requirements of the Lord Robert Mair drainage recommendations and assess their requirements and the implication on Eastern Region. Several operating models will be proposed and will detail the benefits and risks of each. It will also describe implications on market capabilities, cost etc. What constitutes drainage inspection “Drainage inspections gather visible information relating to the structure and performance of the drainage system as well as the parent assets such as earthworks, structures and track. Drainage inspections have two levels of details: a) Drainage System Defect Inspection is a basic visual inspection which is also included as part of the Condition Inspection. b) Drainage System Condition Inspection is the baseline inspection which is required for all drainage assets in order to collect condition data and should cover the drainage system (inflows to outfall). The My Work App has been created to allow inspection data to be collected consistently and to upload the information into Ellipse. This eliminates the need for paperwork and enables functionality such as Global Navigation Satellite System data recording, photographs, editing attributes and the creation of work arising to be completed quickly and within defined scripts. Whenever possible the use of the My Work App is recommended. Where more detailed information is required, the inspection should be supported by a survey (see NR/L2/CIV/005/05, Drainage Survey.” (definition in accordance with NR/L2/CIV/005, Module 4, Drainage Inspection, p.7) What constitutes drainage maintenance Drainage maintenance, both manual and mechanised, will be undertaken in accordance NR/L2/CIV/005, Modules 11 – 15; and will be specified by the Senior Asset Engineers in the Route Engineering team. Manual work includes: rodding of pipes, vegetation removal and recutting ditching, replacement of catchpit lids and rings, desilting and repair of culvert headwalls etc. Mechanised maintenance would be primarily jetting. Critical success factors 1) measurable condition score improvement; 2) performance improvement re. reduction of TSRs, reduction in flood events, reduction in wet beds/rough ride reports; 3) Earthwork stability 4) Achieve unit rate Depot Locations per Route The drainage assets (total number estimated around 150,000) are split across the 4 routes as follows: East Coast – estimated 19% North & East - estimated 26% East Midlands - estimated 17% Anglia - estimated 38% East Coast Route Depot Locations Morpeth Newcastle Darlington Doncaster Peterborough Hitchin London Kings Cross North & East Route Depot Locations Hexham Middlesbrough York Knottingley Leeds Wakefield Sheffield Barnetby East Midlands Route Depot locations Bedford Luton Derby Leicester Nottingham Lincoln Anglia Route Depot Locations Ipswich Norwich Romford Barking Ely Tottenham Please note: The date in section II.3 is the date the PIN will be published as this is just a market capability survey.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Procedure published
30 Nov 2021, 22:45 GMT
Commercial outcome and competition
AwardsNo award published |
ContractsNo contract published |
Bid statisticsNo aggregate bid statistics published |
Buyer and organisations in this procedure
Network Rail Infrastructure Ltd
Contracting authority GB-FTS-448Documents (0)
Official links; attachments are not copied
No linked documents are published
Related procedures (0)
No related procedures published