Official UK procurement notice
Maintenance Dredging Channel · UK public procurement notice
Authority: LONDON GATEWAY PORT LIMITED (Public body)·Consortium: 2 public authorities
What is being bought
Published requirement descriptionLondon Gateway Port Limited (LG) is a statutory Harbour Authority by virtue of the London Gateway Port Harbour Empowerment Order 2008 (the HEO) which allows for the
construction and operation of DP World London Gateway Port (the Port).
Pursuant to article 13 of the HEO (Power to Dredge), LG has the power to dredge, deepen, scour, cleanse, alter, improve the river bed and foreshore to the extent described in Schedule 3
of the HEO, or as may be required for the purpose of maintaining the works described in Schedule 3.
CPV: Dredging and pumping works
The lotProcurement structure
single lot · no lot value publishedLot #1As part of the Port's requirements, LG intends to carry out a maintenance dredging in…Awarded
As part of the Port's requirements, LG intends to carry out a maintenance dredging in the Yantlet channel (Thames Estuary). This campaign, to start in Q4 2023, will focus in the
areas within HEO's limits of deviation (areas under the HEO in which LG can carry out works) (see below figure), with a maximum volume to be dredged of circa 1.5Mm3.
LG has a Port of London Authority dredge license in place (valid until 17 March 2025) covering one campaign/year up to 1.5Mm3/year in Ebb tide. Sediment samples were collected in June 2022 and results can be provided to tenderers. LG is currently in the process of obtaining a marine disposal license allowing a maximum quantity of up to 2 million m3 of dredge material to be disposed of over a three-year period between two disposal sites (South Falls and Inner Gabbard). There is also an option to discharge part of the material onshore at Berth 5 of the Port, subjected to obtain the corresponding permits from the relevant Regulators.
With a final target level of -14.50mCD, tenderers can consider using Trailing suction hopper dredger as well as water injection dredger to assist in the effectiveness of the dredging
Procedure terms & legal framework
From the official record- Procedure method
- Restricted procedure
- Legal basis
- CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- No (one-off requirement)
- First published
- 23 Jun 2023, 11:00 BST
- Last source update
- 4 Sept 2025, 10:54 BST
- FTS notice number
2025/S 000-053817- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-03dbedFind a Tender
- Electronic trading
- e-invoicing allowed · electronic ordering · electronic payment
How it was run
Official notice- Submission deadline
- 26 Jul 2023
- Submission channel
- {"electronicSubmission"}
- Accepted languages
- en
- Bid validity
- 270 days from the deadline
Timeline
26 Jul 2023 → 4 Sept 2025 · 2 dates- Submission deadline26 Jul 2023
- Notice published4 Sept 2025, 10:54 BST
Notice history
2 events · 2 releases on Find a Tender · since 4 Sept 2025- Status changed to complete4 Sept 2025, 10:54 BST
- Buyer details updated4 Sept 2025, 10:54 BST
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| NewWaves Solution Limited | — | — | Awarded |
Contracts
Contract 053817-2025-1 · NewWaves Solution Limited
- Signed
- 14 Jun 2024
- Value
- —
- Status
- active
Contracting authority & participating public bodies
2 public bodies on the noticeBidders & participating suppliers
1 commercial party on the notice- NewWaves Solution LimitedAwarded supplier
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.