Find a TenderAwarded
Published 23 Apr 2021, 22:55 BST

Official UK procurement notice

Lower Thames Crossing - Tunnelling and associated works activities (Spoil Disposal from North Portal)

Official notice

Authority: Highways England

WorksNegotiated without publication of a contract notice
Awarded value£43,600,000published contract · exc. VAT
Awarded 23 Apr 2021
Awarded to Ingrebourne Valley Limited

What is being bought

Published requirement description

Highways England (HE) is the government company charged with operating, maintaining and improving the majority of England’s motorways and major A roads. We have a huge road investment programme to deliver and want to engage with suppliers to inform our approach to procuring a contractor to dispose of spoil arisings from construction (tunnelling) activities.

CPV: Earthmoving work · Landfill management services · Tunnelling works · Waste disposal site construction work

The lotProcurement structure

single lot · no lot value published
Lot #1The Lower Thames Crossing project comprises of two bored tunnels beneath the River…

The Lower Thames Crossing project comprises of two bored tunnels beneath the River Thames with interconnecting link roads to the M25, A13 and A2. At 16 metres in diameter, the tunnels will be some of the largest bored tunnels in the world. The crossing will feature three lanes in both directions with a maximum speed limit of 70mph the Lower Thames Crossing is the largest single road investment project in the UK since the M25 was completed more than 30 years ago.

At circa 2.4 miles each the tunnels will be the longest in the country.

The tunnel’s north portal site (the “North Portal”) will be located on the north shore of the Thames east of the old Tilbury B Power station site and south of the Tilbury loop railway line. The north Portal structure and its approach ramp is to be constructed within a sizeable excavation. Approach roads to the North Portal construction continue at ground level north towards the proposed viaduct over the Tilbury loop railway line.

Highways England tested the market for interest by way of a PIN (2020/S 027-063332) (“PIN”) and there was limited market interest and limited response rates to the PIN. All interested parties were invited to discuss their capabilities to provide the services described within this opportunity in a manner that is likely to be compliant with the proposed constraints of the Development Consent Order (“DCO”) under a non-disclosure agreement. This was in order to ascertain the market’s capabilities and finalise an appropriate procurement strategy. The process identified only one interested supplier who was able to demonstrate their capabilities and relevant skill and experience in performing the required services in a manner that was compliant with the likely obligations of the DCO. Highways England has therefore concluded that Ingrebourne Valley Limited (“IVL”) are only suitable supplier for receiving spoil arising from the North Portal and tunnels excavation and its subsequent disposal, and Highways England intend to award a contract to IVL for these services.

The award will consist of two contracts which together cover the scope of the PIN: (i) an enabling works contract to allow site preparation necessary to prepare the site and to carry out the spoil disposal services to take place prior to the DCO being granted (value up to c. £1m); and (ii) a spoil disposal services contract.

The scope of works will require IVL to take delivery of spoil from the working area on the north bank of the Thames. Highways England will not be providing marine transport and IVL will be required to provide transportation from the working area to its proposed disposal site.

Indicative quantities of inert spoil is circa 2,000,000 m3 (noting that spoil from the tunnelling activity will be in a post treated state). Inert spoil management strategy is vital to the success of the Lower Thames Crossing Tunnels contract. Early mitigation of project risk around the spoil disposal activity is attractive and is being explored now. The works are to be undertaken in accordance with the constraints of a future DCO.

The DCO submission will seek to minimise the environmental/carbon impact of the spoil disposal activity, therefore, the movement of spoil by heavy goods vehicles on local roads and the strategic road network are likely to be heavily constrained within the DCO. The anticipated terms of the contracts are: (i) enabling works contract (circa two years); and (ii) spoil disposal services contract (circa six years).

Whilst the overall duration of the enabling works and spoil disposal services contracts are envisaged to be longer than the duration set out in the PIN, in line with the PIN, the majority of the spoil handling services (c. £32.6m) will occur during a three year period (between 2024 – 2027). It is envisaged that the spoil disposal services will taper off, with landscaping & demobilisation taking place between 2027 – 2029 (c. £10m).

Delivery: UK · Thurrock

Procedure terms & legal framework

From the official record
Procedure method
Negotiated without publication of a contract notice
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Works
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
23 Apr 2021, 22:55 BST
Last source update
23 Apr 2021, 22:55 BST
FTS notice number
2021/S 000-008811
Classification (CPV)
Earthmoving workLandfill management servicesTunnelling worksWaste disposal site construction work
Delivery area
UK
Official registry OCID
ocds-h6vhtk-02a9dc Find a Tender
Why no open competition

The works, supplies or services can be provided only by a particular economic operator due to absence of competition for technical reasons

Published justification

The Authority considers that there are grounds to award a contract directly to IVL under Regulation 32(2)(b)(ii) of the Public Contract Regulations 2015 (“PCR”) on the basis that only IVL would be able to provide the spoil disposal services. This is because competition is absent for technical reasons and no reasonable alternative or substitute exists. There are constraints on access to the North Portal (due to third party land rights), transportation of spoil from the North Portal site and there are expected to be a number of environmental and/or other constraints on the transportation of spoil due to the DCO. Following market testing, the Authority considers that IVL are the only contractor able to provide a technical solution to handle and dispose of spoil arisings from the North Portal site within the expected access and environmental constraints. IVL has demonstrated that it has the required capabilities to undertake the scope of services by describing how it operates a spoil disposal facility and by demonstrating that it provides similar spoil disposal services to other major projects in the London area and possesses the required licenses and capacity to receive the required quantities of spoil arising from the Lower Thames Crossing tunnelling contract. Given their operation at the North Portal site falls within the DCO planning area and is adjacent to the main works area, IVL was also able to demonstrate how it would comply with the expected DCO constraints.

The Authority tested the market by publishing a PIN on 5 February 2020. The PIN advised the market that there would be a call for competition in relation to this procurement and that all interested parties should register their interest through the Authority’s etendering portal by 13 March 2020. The PIN was also advertised in the trade press, including the New Civil Engineer and GE Plus.

A total of eight (8) companies expressed an interest in the PIN, and all parties were invited to participate in a one to one meeting with the Authority to identify whether the contractor could offer a credible technical solution(s) to satisfy the scope requirements and associated constraints of the procurement under a signed non-disclosure agreement. Only IVL accepted an offer of a one to one follow up meeting with the Authority arranged through Bravo. No other supplier responded to Highways England or engaged in detailed dialogue with the Authority, despite the Authority offering an extension to the deadline to express an interest in participating in a one to one meeting. The fact that no other contractor engaged in dialogue with Highways England indicates that no reasonable alternative or substitute contractor with appetite exists and that IVL is the only contractor which has the technical capability and appetite to deliver the scope of services in accordance with the Authority’s access and environmental requirements. Furthermore, IVL highlighted they were the only supplier with the required licenses at the site location which are needed for undertaking some of the services required under this procurement.

The issue of a VEAT notice notifies the market of the proposed direct award to IVL via a negotiated procedure.

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 1
Awarded value £43,600,0001 contract exc. VAT
Contracts signed 1latest 23 Apr 2021
Awarded toValueDateStatus
Ingrebourne Valley LimitedSMESubcontracting: declared£43,600,000 †—Awarded

Contracts

Contracting authority & participating public bodies

Highways England

Contracting authorityNational or federal agency/officeGeneral public services 9346363 Woodlands, Manton Lane, BEDFORD, UK, MK41 7LWContact name, email

Bidders & participating suppliers

1 commercial party on the notice
  • Ingrebourne Valley LimitedAwarded supplier Cecil House, Harlow Common, Harlow, Essex, UK, CM17 9HYContact email

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.