Lot 1
No lot description published.
Award criteria
Technical Capability — Breakdown will be detailed in the ITT document/Oracle (30%)
Commercial — Breakdown will be detailed in the ITT document/Oracle (70%)
Participate on ehpv.fa.em2.oraclecloud.com ↗External submission platform
DP World is undertaking the expansion of its London Gateway Port facility at Stanford le Hope, through the development of a new second rail terminal located to the west of the existing eastern operational rail facility. This investment will significantly increase the port's rail freight capacity, improve operational resilience, and support the continued growth of DP Worlds sustainable, low carbon logistics solutions. This expansion represents a strategic enhancement of the port's intermodal capability, enabling faster, more efficient movement of goods across the UK and supporting national objectives for greener freight transport. The new terminal will play a key role in accommodating future demand and maintaining London Gateway's position as a world class logistics and supply chain hub. The Scope of Works covered under this tender include, but are not limited to, the following key elements: Permanent Way Works Construction of new railway infrastructure to serve the second terminal including plain line track, and associated components in a phase installation sequence delivering five new sidings (7 to 11) to compliment the two sidings (12 and 13) already constructed during Phase 1/1A of the works, which are currently in operation. Installation and integration of 21 new switches and crossings (S&C) required to connect the new terminal to the existing rail network corridor as well as providing more route paths for trains entering and exiting the existing eastern rail terminal. Civil Engineering Works Installation of a circa 850m long reinforced concrete crane rail beam with pre-cast concrete pile foundations and its associated mechanical chambers to allow Rail Mounted Gantry Crane (RMGC) operations within the new terminal. Earthworks, formation preparation, track drainage and utility diversions necessary to support the new terminal infrastructure. Construction of numerous ancillary civils foundation bases, walkways, cable routes and under track crossings for the new signalling, telecommunications and electrical plant equipment, shunters cabin and REB building. Telecommunications Works Installation of new and relocation of existing Operational Telecoms and SiSS systems assets including CCTV cameras, signal post and point zone telephones and the shunters panel concentrator. Signaling Works Provision of new and relocation of existing signaling assets, including lineside equipment, control system modifications in the form of new Shunters Cabin housing an updated control panel to operate both rail terminals, and associated REB for the signaling system interlocking. These assets will be constructed in a staged delivery to align with the permanent way phasing, to ensure full operational compatibility. Installation of new signaling track circuits to both the western and eastern terminals will enable operation of both facilities from the one new control panel. Testing, commissioning and integration of all new rail systems with existing operational infrastructure as well as update to the Upminster IECC workstation screens. Electrical and Plant Works New power supplies to the various disciplines line side equipment, shunters cabin and REB, as well as new points heating assets for both the western and existing eastern rail terminal S&C units. Interfaces and Integration Management of all interfaces with existing rail infrastructure, port operations, utilities, and third party stakeholders. Development of staging plans to minimise operational disruption and ensure safe working adjacent to live rail and port environments. Coordination with existing port operations to ensure safe and continuous functionality during construction. Project Goals Upon completion, the new rail terminal will provide; increased rail served capacity for containerised freight, enhanced operational flexibility and resilience, deliver infrastructure capable of supporting robotic next generation RMGC equipment and improved efficiency as well as reduce the ports carbon impact through expanded rail freight capability. Programme: It is intended that the Rail works will commence in July 2026 for a duration of 12 months.
UKH32, GB
No lot description published.
Award criteria
Technical Capability — Breakdown will be detailed in the ITT document/Oracle (30%)
Commercial — Breakdown will be detailed in the ITT document/Oracle (70%)
| Item | Category | Quantity |
|---|---|---|
| 1 | Railway construction works | Not published |
Benchmarked against retained Find a Tender procedures with CPV division 45. The category anchor is Railway construction works (45234100); this is a deliberately broad market comparator. The comparison is shown at several levels rather than pretending one company or region is always the best benchmark.
| Comparison set | Procedures | Reported bids per procedure | Named award suppliers | Price evidence |
|---|---|---|---|---|
| Market: CPV division 45 | 8,214 | 4 median · 23.5 average (1,644 of 8,214 with a bid count) | 3.6 average (1,810 of 8,214 with named award suppliers) | Not published |
| Same buyer | 3 | Not published | Not published | Not published |
| Delivery region: UKH32 | 14 | Not published | 1 average (2 of 14 with named award suppliers) | Not published |
| Similar published value (0.5×–2×) | 717 | 6.5 median · 11.9 average (8 of 717 with a bid count) | 4.9 average (8 of 717 with named award suppliers) | Not published |
“Reported bids” is an official aggregate, sometimes reported per lot; it is the closest available competition measure. “Named award suppliers” are winners, not all applicants.
Not enough comparable procedures currently publish both a GBP tender value and a usable lowest-valid-bid value to calculate a responsible price-reduction benchmark. Tenderline deliberately does not infer a saving from named award suppliers or from missing award values.
No planning milestones published.
No linked framework, prior procurement or reprocurement published.
Diagnostic view. “Not published” means this current release does not provide a value.
| OCID | ocds-h6vhtk-066c43 |
|---|---|
| Latest release ID | 024069-2026 |
| Latest release timestamp | Tue Mar 17 2026 13:40:13 GMT+0000 (Coordinated Universal Time) |
| Source | find-a-tender |
| Official notice URL | https://www.find-tender.service.gov.uk/Notice/024069-2026 |
| Tender status | active |
| Procurement method | selective |
| Procurement method details | Competitive flexible procedure |
| Main procurement category | works |
| Above threshold | Yes |
| Legal basis | 2023/54 |
| Tender period: start | Not published |
| Tender period: end | Not published |
| Expression of interest deadline | 2026-04-13T23:59:00+01:00 |
| Enquiry deadline | 2026-04-13T23:59:00+01:00 |
| Award period: start | Not published |
| Award period: end | 2026-06-30T23:59:59+01:00 |
| Submission method details | https://ehpv.fa.em2.oraclecloud.com |
| Submission languages | en |
| Electronic catalogue policy | Not published |
| Total tender value | £15,000,000 |
| Tender lots in source | 1 |
| Tender items in source | 1 |
| Tender documents in source | 2 |
| Awards in latest release | 0 |
| Contracts in latest release | 0 |
| Parties in latest release | 1 |
| Date | Event | Reference |
|---|---|---|
| 17 Mar 2026 | tender | 024069-2026 |
Unmodified official OCDS data retained by Tenderline for this procurement process.
{
"id": "024069-2026",
"tag": [
"tender"
],
"date": "2026-03-17T13:40:13Z",
"ocid": "ocds-h6vhtk-066c43",
"buyer": {
"id": "GB-COH-04341592",
"name": "LONDON GATEWAY PORT LIMITED"
},
"tender": {
"id": "ocds-h6vhtk-066c43",
"lots": [
{
"id": "1",
"value": {
"amount": 15000000,
"currency": "GBP",
"amountGross": 18000000
},
"status": "active",
"awardCriteria": {
"criteria": [
{
"name": "Technical Capability",
"type": "quality",
"numbers": [
{
"number": 30,
"weight": "percentageExact"
}
],
"description": "Breakdown will be detailed in the ITT document/Oracle"
},
{
"name": "Commercial",
"type": "price",
"numbers": [
{
"number": 70,
"weight": "percentageExact"
}
],
"description": "Breakdown will be detailed in the ITT document/Oracle"
}
]
},
"contractPeriod": {
"endDate": "2027-06-30T23:59:59+01:00",
"startDate": "2026-07-01T00:00:00+01:00"
},
"selectionCriteria": {
"criteria": [
{
"type": "economic",
"description": "As per PQQ and tender documents on Oracle tendering platform"
},
{
"type": "technical",
"description": "As per PQQ and tender documents on Oracle tendering platform"
}
]
}
}
],
"items": [
{
"id": "1",
"relatedLot": "1",
"deliveryAddresses": [
{
"region": "UKH32",
"country": "GB",
"countryName": "United Kingdom"
}
],
"additionalClassifications": [
{
"id": "45234100",
"scheme": "CPV",
"description": "Railway construction works"
}
]
}
],
"title": "London Gateway - Second Rail Terminal Phase 2",
"value": {
"amount": 15000000,
"currency": "GBP",
"amountGross": 18000000
},
"status": "active",
"documents": [
{
"id": "conflictOfInterest",
"description": "Not published",
"documentType": "conflictOfInterest"
},
{
"id": "024069-2026",
"url": "https://www.find-tender.service.gov.uk/Notice/024069-2026",
"format": "text/html",
"noticeType": "UK4",
"description": "Tender notice on Find a Tender",
"documentType": "tenderNotice",
"datePublished": "2026-03-17T13:40:13Z"
}
],
"procedure": {
"features": "1. Initial Stage \nThe procurement will commence with the issue of a prequalification questionnaire (PQQ) following the publication of this Tender Notice.\nSuppliers will be required to submit selection information (e.g. legal, financial, and technical capability as per PQQ which will be released on Oracle SCM Tendering platform)\nEvaluation at this stage will be carried out against the criteria set out in the PQQ document.\nWe will shortlist suppliers for subsequent stages based on successfully meeting the PQQ criteria.\n2. Tender Stage\nShortlisted suppliers will be invited to the tender stage\nLondon Gateway Port Limited reserves the right to conduct one or more tendering rounds, which may include:\nMid and Post Tender Clarification meetings,\nNegotiation on technical, commercial and/or contractual aspects of the submissions.\nNegotiation may cover:\nScope refinement,\nService delivery models,\nRisk allocation,\nPricing structures,\nContract terms (excluding any minimum requirements).\nEach round may reduce the number of suppliers progressing, based on evaluation against the stated criteria.\n3. Refinement of Requirements and Award Criteria\nDuring the procedure, London Gateway may refine:\nThe specification and requirements,\nThe evaluation methodology and/or weightings,\nThe procurement documents generally.\nAny refinements will be communicated transparently and simultaneously to all suppliers participating in the relevant stage, ensuring equal treatment.\nNo changes will be made that distort competition or favour any supplier.\n4. Invitation to Submit Final Tenders (BAFO)\nFollowing conclusion of dialogue or negotiation stages, remaining suppliers will be invited to submit a Final Tender / Best and Final Offer (BAFO).\nFinal submissions must fully comply with the finalised specification and contractual requirements.\nNo further negotiation will take place after submission of final tenders unless explicitly stated.\n5. Evaluation and Supplier Selection\nFinal tenders will be evaluated solely against the final award criteria as notified to suppliers.\nThe contract will be awarded to the supplier submitting the most advantageous tender, based on the defined quality and price criteria.\nLondon Gateway will issue a Contract Award Notice, in accordance with statutory requirements.\nContract type - ICE detail design & build\n6. General Provisions\nLondon Gateway reserves the right to:\nAmend the structure, number of stages, or timetable of the procedure and reduce the number of suppliers at any stage,\nConclude the procedure at any stage without award.\nAll suppliers will be treated equally, and all communications will be conducted in a transparent and auditable manner."
},
"legalBasis": {
"id": "2023/54",
"uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents",
"scheme": "UKPGA"
},
"awardPeriod": {
"endDate": "2026-06-30T23:59:59+01:00"
},
"description": "DP World is undertaking the expansion of its London Gateway Port facility at Stanford le Hope, through the development of a new second rail terminal located to the west of the existing eastern operational rail facility. This investment will significantly increase the port's rail freight capacity, improve operational resilience, and support the continued growth of DP Worlds sustainable, low carbon logistics solutions. \nThis expansion represents a strategic enhancement of the port's intermodal capability, enabling faster, more efficient movement of goods across the UK and supporting national objectives for greener freight transport. The new terminal will play a key role in accommodating future demand and maintaining London Gateway's position as a world class logistics and supply chain hub.\nThe Scope of Works covered under this tender include, but are not limited to, the following key elements:\nPermanent Way Works\nConstruction of new railway infrastructure to serve the second terminal including plain line track, and associated components in a phase installation sequence delivering five new sidings (7 to 11) to compliment the two sidings (12 and 13) already constructed during Phase 1/1A of the works, which are currently in operation. Installation and integration of 21 new switches and crossings (S&C) required to connect the new terminal to the existing rail network corridor as well as providing more route paths for trains entering and exiting the existing eastern rail terminal. \nCivil Engineering Works\nInstallation of a circa 850m long reinforced concrete crane rail beam with pre-cast concrete pile foundations and its associated mechanical chambers to allow Rail Mounted Gantry Crane (RMGC) operations within the new terminal. Earthworks, formation preparation, track drainage and utility diversions necessary to support the new terminal infrastructure. Construction of numerous ancillary civils foundation bases, walkways, cable routes and under track crossings for the new signalling, telecommunications and electrical plant equipment, shunters cabin and REB building.\nTelecommunications Works\nInstallation of new and relocation of existing Operational Telecoms and SiSS systems assets including CCTV cameras, signal post and point zone telephones and the shunters panel concentrator. \nSignaling Works\nProvision of new and relocation of existing signaling assets, including lineside equipment, control system modifications in the form of new Shunters Cabin housing an updated control panel to operate both rail terminals, and associated REB for the signaling system interlocking. These assets will be constructed in a staged delivery to align with the permanent way phasing, to ensure full operational compatibility. Installation of new signaling track circuits to both the western and eastern terminals will enable operation of both facilities from the one new control panel. Testing, commissioning and integration of all new rail systems with existing operational infrastructure as well as update to the Upminster IECC workstation screens. \nElectrical and Plant Works\nNew power supplies to the various disciplines line side equipment, shunters cabin and REB, as well as new points heating assets for both the western and existing eastern rail terminal S&C units.\nInterfaces and Integration\nManagement of all interfaces with existing rail infrastructure, port operations, utilities, and third party stakeholders. Development of staging plans to minimise operational disruption and ensure safe working adjacent to live rail and port environments. Coordination with existing port operations to ensure safe and continuous functionality during construction.\nProject Goals \nUpon completion, the new rail terminal will provide; increased rail served capacity for containerised freight, enhanced operational flexibility and resilience, deliver infrastructure capable of supporting robotic next generation RMGC equipment and improved efficiency as well as reduce the ports carbon impact through expanded rail freight capability.\n Programme: It is intended that the Rail works will commence in July 2026 for a duration of 12 months.",
"enquiryPeriod": {
"endDate": "2026-04-13T23:59:00+01:00"
},
"specialRegime": [
"utilities"
],
"aboveThreshold": true,
"submissionTerms": {
"languages": [
"en"
],
"electronicSubmissionPolicy": "allowed"
},
"procurementMethod": "selective",
"mainProcurementCategory": "works",
"submissionMethodDetails": "https://ehpv.fa.em2.oraclecloud.com",
"procurementMethodDetails": "Competitive flexible procedure",
"expressionOfInterestDeadline": "2026-04-13T23:59:00+01:00"
},
"parties": [
{
"id": "GB-COH-04341592",
"name": "LONDON GATEWAY PORT LIMITED",
"roles": [
"buyer"
],
"address": {
"region": "UKI32",
"country": "GB",
"locality": "London",
"postalCode": "SW1E 5JQ",
"countryName": "United Kingdom",
"streetAddress": "16 Palace Street"
},
"details": {
"classifications": [
{
"id": "privateUtility",
"scheme": "UK_CA_TYPE",
"description": "Private utility"
}
]
},
"identifier": {
"id": "04341592",
"scheme": "GB-COH"
},
"contactPoint": {
"email": "oluchi.nwaiwu@dpworld.com"
},
"additionalIdentifiers": [
{
"id": "PXWY-9334-MHJV",
"scheme": "GB-PPON"
}
]
}
],
"language": "en",
"initiationType": "tender"
}{
"id": "024069-2026",
"tag": [
"tender"
],
"date": "2026-03-17T13:40:13Z",
"ocid": "ocds-h6vhtk-066c43",
"buyer": {
"id": "GB-COH-04341592",
"name": "LONDON GATEWAY PORT LIMITED"
},
"tender": {
"id": "ocds-h6vhtk-066c43",
"lots": [
{
"id": "1",
"value": {
"amount": 15000000,
"currency": "GBP",
"amountGross": 18000000
},
"status": "active",
"awardCriteria": {
"criteria": [
{
"name": "Technical Capability",
"type": "quality",
"numbers": [
{
"number": 30,
"weight": "percentageExact"
}
],
"description": "Breakdown will be detailed in the ITT document/Oracle"
},
{
"name": "Commercial",
"type": "price",
"numbers": [
{
"number": 70,
"weight": "percentageExact"
}
],
"description": "Breakdown will be detailed in the ITT document/Oracle"
}
]
},
"contractPeriod": {
"endDate": "2027-06-30T23:59:59+01:00",
"startDate": "2026-07-01T00:00:00+01:00"
},
"selectionCriteria": {
"criteria": [
{
"type": "economic",
"description": "As per PQQ and tender documents on Oracle tendering platform"
},
{
"type": "technical",
"description": "As per PQQ and tender documents on Oracle tendering platform"
}
]
}
}
],
"items": [
{
"id": "1",
"relatedLot": "1",
"deliveryAddresses": [
{
"region": "UKH32",
"country": "GB",
"countryName": "United Kingdom"
}
],
"additionalClassifications": [
{
"id": "45234100",
"scheme": "CPV",
"description": "Railway construction works"
}
]
}
],
"title": "London Gateway - Second Rail Terminal Phase 2",
"value": {
"amount": 15000000,
"currency": "GBP",
"amountGross": 18000000
},
"status": "active",
"documents": [
{
"id": "conflictOfInterest",
"description": "Not published",
"documentType": "conflictOfInterest"
},
{
"id": "024069-2026",
"url": "https://www.find-tender.service.gov.uk/Notice/024069-2026",
"format": "text/html",
"noticeType": "UK4",
"description": "Tender notice on Find a Tender",
"documentType": "tenderNotice",
"datePublished": "2026-03-17T13:40:13Z"
}
],
"procedure": {
"features": "1. Initial Stage \nThe procurement will commence with the issue of a prequalification questionnaire (PQQ) following the publication of this Tender Notice.\nSuppliers will be required to submit selection information (e.g. legal, financial, and technical capability as per PQQ which will be released on Oracle SCM Tendering platform)\nEvaluation at this stage will be carried out against the criteria set out in the PQQ document.\nWe will shortlist suppliers for subsequent stages based on successfully meeting the PQQ criteria.\n2. Tender Stage\nShortlisted suppliers will be invited to the tender stage\nLondon Gateway Port Limited reserves the right to conduct one or more tendering rounds, which may include:\nMid and Post Tender Clarification meetings,\nNegotiation on technical, commercial and/or contractual aspects of the submissions.\nNegotiation may cover:\nScope refinement,\nService delivery models,\nRisk allocation,\nPricing structures,\nContract terms (excluding any minimum requirements).\nEach round may reduce the number of suppliers progressing, based on evaluation against the stated criteria.\n3. Refinement of Requirements and Award Criteria\nDuring the procedure, London Gateway may refine:\nThe specification and requirements,\nThe evaluation methodology and/or weightings,\nThe procurement documents generally.\nAny refinements will be communicated transparently and simultaneously to all suppliers participating in the relevant stage, ensuring equal treatment.\nNo changes will be made that distort competition or favour any supplier.\n4. Invitation to Submit Final Tenders (BAFO)\nFollowing conclusion of dialogue or negotiation stages, remaining suppliers will be invited to submit a Final Tender / Best and Final Offer (BAFO).\nFinal submissions must fully comply with the finalised specification and contractual requirements.\nNo further negotiation will take place after submission of final tenders unless explicitly stated.\n5. Evaluation and Supplier Selection\nFinal tenders will be evaluated solely against the final award criteria as notified to suppliers.\nThe contract will be awarded to the supplier submitting the most advantageous tender, based on the defined quality and price criteria.\nLondon Gateway will issue a Contract Award Notice, in accordance with statutory requirements.\nContract type - ICE detail design & build\n6. General Provisions\nLondon Gateway reserves the right to:\nAmend the structure, number of stages, or timetable of the procedure and reduce the number of suppliers at any stage,\nConclude the procedure at any stage without award.\nAll suppliers will be treated equally, and all communications will be conducted in a transparent and auditable manner."
},
"legalBasis": {
"id": "2023/54",
"uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents",
"scheme": "UKPGA"
},
"awardPeriod": {
"endDate": "2026-06-30T23:59:59+01:00"
},
"description": "DP World is undertaking the expansion of its London Gateway Port facility at Stanford le Hope, through the development of a new second rail terminal located to the west of the existing eastern operational rail facility. This investment will significantly increase the port's rail freight capacity, improve operational resilience, and support the continued growth of DP Worlds sustainable, low carbon logistics solutions. \nThis expansion represents a strategic enhancement of the port's intermodal capability, enabling faster, more efficient movement of goods across the UK and supporting national objectives for greener freight transport. The new terminal will play a key role in accommodating future demand and maintaining London Gateway's position as a world class logistics and supply chain hub.\nThe Scope of Works covered under this tender include, but are not limited to, the following key elements:\nPermanent Way Works\nConstruction of new railway infrastructure to serve the second terminal including plain line track, and associated components in a phase installation sequence delivering five new sidings (7 to 11) to compliment the two sidings (12 and 13) already constructed during Phase 1/1A of the works, which are currently in operation. Installation and integration of 21 new switches and crossings (S&C) required to connect the new terminal to the existing rail network corridor as well as providing more route paths for trains entering and exiting the existing eastern rail terminal. \nCivil Engineering Works\nInstallation of a circa 850m long reinforced concrete crane rail beam with pre-cast concrete pile foundations and its associated mechanical chambers to allow Rail Mounted Gantry Crane (RMGC) operations within the new terminal. Earthworks, formation preparation, track drainage and utility diversions necessary to support the new terminal infrastructure. Construction of numerous ancillary civils foundation bases, walkways, cable routes and under track crossings for the new signalling, telecommunications and electrical plant equipment, shunters cabin and REB building.\nTelecommunications Works\nInstallation of new and relocation of existing Operational Telecoms and SiSS systems assets including CCTV cameras, signal post and point zone telephones and the shunters panel concentrator. \nSignaling Works\nProvision of new and relocation of existing signaling assets, including lineside equipment, control system modifications in the form of new Shunters Cabin housing an updated control panel to operate both rail terminals, and associated REB for the signaling system interlocking. These assets will be constructed in a staged delivery to align with the permanent way phasing, to ensure full operational compatibility. Installation of new signaling track circuits to both the western and eastern terminals will enable operation of both facilities from the one new control panel. Testing, commissioning and integration of all new rail systems with existing operational infrastructure as well as update to the Upminster IECC workstation screens. \nElectrical and Plant Works\nNew power supplies to the various disciplines line side equipment, shunters cabin and REB, as well as new points heating assets for both the western and existing eastern rail terminal S&C units.\nInterfaces and Integration\nManagement of all interfaces with existing rail infrastructure, port operations, utilities, and third party stakeholders. Development of staging plans to minimise operational disruption and ensure safe working adjacent to live rail and port environments. Coordination with existing port operations to ensure safe and continuous functionality during construction.\nProject Goals \nUpon completion, the new rail terminal will provide; increased rail served capacity for containerised freight, enhanced operational flexibility and resilience, deliver infrastructure capable of supporting robotic next generation RMGC equipment and improved efficiency as well as reduce the ports carbon impact through expanded rail freight capability.\n Programme: It is intended that the Rail works will commence in July 2026 for a duration of 12 months.",
"enquiryPeriod": {
"endDate": "2026-04-13T23:59:00+01:00"
},
"specialRegime": [
"utilities"
],
"aboveThreshold": true,
"submissionTerms": {
"languages": [
"en"
],
"electronicSubmissionPolicy": "allowed"
},
"procurementMethod": "selective",
"mainProcurementCategory": "works",
"submissionMethodDetails": "https://ehpv.fa.em2.oraclecloud.com",
"procurementMethodDetails": "Competitive flexible procedure",
"expressionOfInterestDeadline": "2026-04-13T23:59:00+01:00"
},
"parties": [
{
"id": "GB-COH-04341592",
"name": "LONDON GATEWAY PORT LIMITED",
"roles": [
"buyer"
],
"address": {
"region": "UKI32",
"country": "GB",
"locality": "London",
"postalCode": "SW1E 5JQ",
"countryName": "United Kingdom",
"streetAddress": "16 Palace Street"
},
"details": {
"classifications": [
{
"id": "privateUtility",
"scheme": "UK_CA_TYPE",
"description": "Private utility"
}
]
},
"identifier": {
"id": "04341592",
"scheme": "GB-COH"
},
"contactPoint": {
"email": "oluchi.nwaiwu@dpworld.com"
},
"additionalIdentifiers": [
{
"id": "PXWY-9334-MHJV",
"scheme": "GB-PPON"
}
]
}
],
"language": "en",
"initiationType": "tender"
}