James Parsons 6th & 7th Floor HVAC Upgrade Works
Authority: Liverpool John Moores University (Education)
The scheme aims to resolve issues of overheating in IT and teaching spaces on the 6th and 7th floors of James Parsons Building, Phase 2. The works comprise of the complete refurbishment of the mechanical supply and extract ventilation system and chilled water within the spaces. The Contractor shall develop the RIBA Stage 3 design through RIBA Stage 4i, 4ii and 4iii. The Contractor shall provide coordination drawings, installation/fabrication drawings and technical submittals to further develop the design up to RIBA Stage 5.
What is being bought
Published requirement descriptionThe scheme aims to resolve issues of overheating in IT and teaching spaces on the 6th and 7th floors of James Parsons Building, Phase 2. The works comprise of the complete refurbishment of the mechanical supply and extract ventilation system and chilled water within the spaces. The existing suspended ceilings to the labs are to be replaced with all relevant services located in the ceiling to be disconnected, removed and reinstated following the ceiling works. Generally, the electrical works consist of (but are not limited to) refurbishment of the high-level services within the spaces which includes lighting, emergency lighting, fire alarm and detection, small power, containment and electrical distribution.
All works are detailed on the tender drawings, specification and in the schedule of works. The Tender documentation has been developed up to RIBA Stage 3 as outlined in the BSRIA Building Services Design Framework BG6. The Contractor shall develop the RIBA Stage 3 design through RIBA Stage 4i, 4ii and 4iii. The Contractor shall provide coordination drawings, installation/fabrication drawings and technical submittals to further develop the design up to RIBA Stage 5.
The building will be occupied for the duration of the proposal construction programme, albeit at reduce capacity during the summer period.
The contractor is to note that works cannot take place at certain times due to pre-arranged events
as follows;
Monday 14th August 2023 to Friday 18th August 2023, no construction works will be permitted on the Byrom Street Campus as clearing will take place.
3nr non-working days will need to be allowed for in the contractors programme due to University open days.
CPV: Construction work
Open work like this
This notice no longer takes bids · live search, filters set
The lotProcurement structure
single lot · no lot value publishedLot #1
Please see SQ and ITT documents.
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Closed
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 28 Feb 2023, 15:53 GMT
- Last source update
- 28 Feb 2023, 15:53 GMT
- Award evaluation window
- 21 Apr 2023 – …
- Authority reference
EST LJMU 22/23-024- FTS notice number
2023/S 000-005896- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-03acfaFind a Tender
How it was run
Official notice- Submission deadline
- 21 Apr 2023, 12:00 BST
- Submission channel
- {"electronicSubmission"}
- Accepted languages
- en
- Bids opened
- 21 Apr 2023, 12:01 BST
Timeline
28 Feb 2023 → 21 Apr 2023 · 3 dates- Notice published28 Feb 2023, 15:53 GMT
- Submission deadline21 Apr 2023, 12:00 BST
- Bids opened21 Apr 2023, 12:01 BST
Contracting authority & participating public bodies
Dispute resolution & review bodies
- LJMUReview body
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.