GMCA 2171 Strategic Environmental Assessment

Authority: Greater Manchester Combined Authority (Local council)

ServicesBelow thresholdSME suitableVCSE suitable
Planned pipeline value£100,000pipeline notice, not a live tender
Tender notice expected Date not publishedfrom the planned procurement notice
Contract term 2 yrsends 1 Feb 2029 · starts 1 Feb 2027
Notice summaryFrom the published notice

Strategic Environmental Assessment (SEA) - Greater Manchester Joint Minerals and Waste Plan. The Greater Manchester Combined Authority is undertaking an expression of interest for the following: The SEA will be required as part of this work, to identify any environmental effects as a result of implementing the plan, and any reasonable alternatives. The timetable for the GMJMWP is to be agreed but, under transitional arrangements set out in the 2026 Regulations, the 10 authorities are required to give notice of commencement of plan making before 31st December 2026 and to pass through Gateway 1 by 30th April 2027.

What is being bought

Published requirement description

Strategic Environmental Assessment (SEA) - Greater Manchester Joint Minerals and Waste Plan

The Greater Manchester Combined Authority is undertaking an expression of interest for the following:

Strategic Environmental Assessment (SEA) to support the forthcoming Greater Manchester Joint Minerals and Waste Plan (GMJMWP).

The 10 Greater Manchester authorities (Bolton, Bury, Manchester, Oldham, Rochdale, Salford, Stockport, Tameside, Trafford and Wigan) are working together to produce the Greater Manchester Joint Minerals and Waste Plan. This will be a single plan to replace the existing Minerals Plan and Waste Plan, which were adopted in 2013 and 2012 respectively. The plan will be developed working in partnership with local authorities and a specialist third-party and will be produced in line with the Town and Country Planning (Local Planning)(England) Regulations 2026 under the new plan-making system. The SEA will be required as part of this work, to identify any environmental effects as a result of implementing the plan, and any reasonable alternatives. The timetable for the GMJMWP is to be agreed but, under transitional arrangements set out in the 2026 Regulations, the 10 authorities are required to give notice of commencement of plan making before 31st December 2026 and to pass through Gateway 1 by 30th April 2027.

The proposed commission comprises the following activities:

  • Strategic Environmental Assessment for Greater Manchester Joint Minerals and Waste Plan
  • Preparation and consultation on the scope and level of detail of the SEA Environmental Report. This will run at the same time as the consultation on the proposed minerals and waste plan content and evidence.
  • Preparation and consultation on the proposed SEA Environmental Report. This will run at the same time as the as consultation on the proposed minerals and waste plan.
  • Review and finalise SEA Environmental Report prior to ‘Gateway 3’.

CPV: Environmental Impact Assessment (EIA) services other than for construction · Environmental issues consultancy services · Environmental planning

The lotProcurement structure

single lot · no lot value published

Pipeline intelligence · planning stage: how this market runs before the tender is published

How Greater Manchester Combined Authority buys Environmental management (CPV 9071), and who usually turns up

Greater Manchester Combined Authority’s published record next to the market for the same work. Frameworks and DPS are left out: they draw different bid counts. Whole-market view: Environmental management (CPV 9071) →

1

How the contest usually goes

Winner shares use published awards; bid and price charts use contested lots.

Question for the bid
This buyerGreater Manchester Combined Authority · all categories
The marketEnvironmental management (CPV 9071) · North West England
What to do with it
How often do SMEs win?
i

How often small and medium firms win.

Share of awards where the winner’s size is known.

The counts under this question show how many awards have a known supplier size.

Last 36 months.

Buyer: 114 of 259 known-size awards · market: CPV 9071 · North West England, n=33
44%45%

Small firms have won here. Neither number says whether you qualify; it describes who has been winning.

How often do local suppliers win?
i

How often local firms win similar work.

Winners with a registered address in the delivery region, out of awards with a known address.

Local means the winner is registered in the region where that award was delivered. The market figure counts awards delivered in North West England.

A local branch does not count if the registered address is elsewhere.

Last 36 months.

Buyer: 126 of 259 known-location awards · market: CPV 9071 · North West England, n=38
49%21%

Most of this buyer’s recorded winners were registered outside the region where that award was delivered.

How long to a decision?
i

How long buyers here take to decide after bids close.

Middle value in days from the bid deadline to the award date, on competitions that published both.

Only decided tenders count, so slow ones still waiting are not in.

Last 36 months.

Buyer: 21 decided notices · market: CPV 9071 · North West England, n=11
42 days41 days

Half of these awards have an award date within 42 days of the bid deadline.

How often single-bid or direct?
i

How often work is awarded with no recorded rival.

Direct awards and tenders where every published lot count shows one bid.

Both shares are minimums: some awards have no bid count.

Thin markets produce this too; it is not proof of a tailored specification.

Last 36 months.

Buyer: at least 246 of 359 procurements with awards had no recorded rival · market: CPV 9071 · North West England, n=46
69%41%

Direct awards or one recorded bid are common here. Check the route before spending time on a bid.

How many bids did past lots attract?

i

How many bids past lots received.

Each colour is a bid-count range. Only competed lots with a published count are included.

Past bids do not predict this tender.

Last 36 months.

This buyer55 lots with bid counts · all categories
25% had one bid
The market15 lots with bid counts · CPV 9071 · North West England
27% had one bid
Buyer / market · select a colour for counts
1 bid25% / 27%
Buyer: 14 of 55 lots with published bid counts. Market: 4 of 15 lots with published bid counts.
2–327% / 13%
Buyer: 15 of 55 lots with published bid counts. Market: 2 of 15 lots with published bid counts.
4–625% / 33%
Buyer: 14 of 55 lots with published bid counts. Market: 5 of 15 lots with published bid counts.
7+22% / 27%
Buyer: 12 of 55 lots with published bid counts. Market: 4 of 15 lots with published bid counts.

How did awards compare with estimates?

i

Where winning prices landed against estimates.

Each colour shows awards below, close to or above the published estimate, one lot at a time.

Past prices are a guide, not a bid price.

Last 36 months.

This buyer29 lots with estimate and award · all categories
38% below estimate
The market14 lots with estimate and award · CPV 9071 · North West England
64% below estimate
Buyer / market · select a colour for counts
Below estimate38% / 64%
Buyer: 11 of 29 lots with an estimate and award. Market: 9 of 14 lots with an estimate and award.
Within ±2%59% / 29%
Buyer: 17 of 29 lots with an estimate and award. Market: 4 of 14 lots with an estimate and award.
Above estimate3% / 7%
Buyer: 1 of 29 lots with an estimate and award. Market: 1 of 14 lots with an estimate and award.
2

Assess each lot
i

What past awards tell you about each lot.

See the forecast, this buyer’s earlier suppliers and firms with relevant wins.

No supplier is confirmed as a bidder.

Open a lot for its forecast, this buyer’s previous supplier and possible competitors, from published award history, not a bid list

Lot #1CPV 907124 monthsSME suitablePublished estimate£100k
Expected competition
i

How many bids this lot may attract.

The forecast uses similar past competitions. The bar shows either that forecast or past bid counts; the line below says which.

Each lot shows its own forecast based on its own category; forecasts for different lots of the same notice are not comparative. The bar shows 15 past lots.

A forecast, not a list of bidders.

—No model forecast yet27% chance of a single bid
Past bids on 15 similar lots
1 bid27%
4 of 15 similar past lots received 1 bid (27%).
2–313%
2 of 15 similar past lots received 2–3 (13%).
4–633%
5 of 15 similar past lots received 4–6 (33%).
7+27%
4 of 15 similar past lots received 7+ (27%).
Comparable past lots usually drew 4 bids.
Commercial price forecast
i

Where the award price may land.

The forecast uses similar awards and the buyer’s estimate. The band covers the middle half of likely prices.

No comparable awards for this lot yet.

A statistical guide from past awards, not a price to bid.

—No model forecast yet
No comparable awards on record for this lot’s category yet. The published estimate is £100k, and the forecast stays empty until the market has a record to read.

Who has supplied this buyer on similar work?
i

Who has done similar work for this buyer.

Past contracts are matched by buyer, title and type of work.

A past supplier may not bid again.

No earlier contract of this buyer matches this lot on the published record.

Who could compete for this lot?
i

Who could compete for this lot?

Firms with relevant past wins. On a framework, we show firms on that agreement.

None is confirmed as a bidder.

Candidate suppliers for this notice have not been worked out yet, so this is not a verdict that nobody fits.

About this data
  • Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly. Contracts Finder contracts appear on the Retender Radar, not yet in these figures.
  • Two views, kept apart. The authority’s own track record and the wider market for the same kind of work sit side by side and are never mixed. Where the local picture is too thin, a figure widens to a broader market and says which one it used.
  • Forecasts are labelled. The price forecast and its range, possible competitors and the earlier-work matches are our estimates from past awards: not published facts, not win chances and not price advice. Official notices do not say who is bidding.
  • Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.

Procedure terms & legal framework

From the official record
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Services
Notice status
Planned procurement
Procurement threshold
Below threshold
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
5 Nov 2026, 13:36 GMT
Last source update
5 Nov 2026, 13:36 GMT
Authority reference
GMCA 2171
FTS notice number
2026/S 000-105209
Latest notice
Preliminary market engagement notice (UK2)
Classification (CPV)
Environmental Impact Assessment (EIA) services other than for constructionEnvironmental issues consultancy servicesEnvironmental planning
Delivery area
North West (UKD)
Official registry OCID
ocds-h6vhtk-07b413 Find a Tender

How it was run

Official notice
Submission deadline
—

Timeline

5 Nov 2026 → 1 Feb 2027 · 3 dates
  1. Planning notice published20h ago
    5 Nov 2026, 13:36 GMT
  2. Today
    6 Nov 2026
  3. Market engagementin 7 days
    13 Nov 2026, 23:59 GMT

    Please access the Expression of Interest on the Chest at procontract.due-north.com/Advert ↗ and fill out the Market Engagement Questionnaire, submitting your response with the questionnaire attached and populated on the Chest.

    If you experience any difficulties, please contact the technical support team via email at [email protected] or for critical and time-sensitive issues by calling 0330 005 0352.

    Further instructions on how to use the portal are given on the site. Supplier guides and further instructions on how to use The Chest can be found on the site via supplierhelp.due-north.com ↗.

    Any further clarifications must be sent via the Chest messaging system. This will be under your account on the Chest.

  4. Contract startsin 86 days
    1 Feb 2027

Notice history

1 event · 1 release on Find a Tender
  1. Preliminary market engagement notice published
    5 Nov 2026, 13:36 GMT
    UK2

Commercial outcome & contract awards

Pipeline notice
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Contracting authority & participating public bodies

Greater Manchester Combined Authority

Contracting authorityPublic authority - sub-central government GB-PPON: PXBN-3793-LCTQ 56 Oxford Street, Manchester, North West, M1 6EUContact email

Official documents & specifications (1)

Official links; attachments are not copied

Notices published for this procedure