← Back to search results

ClosedFind a Tender · UK4

GMCA 1185 Salford Road MRF Equipment

Buyer: Greater Manchester Combined Authority →

View official notice ↗Official source

BuyerGreater Manchester Combined Authority
StatusClosed
Deadline17 Oct 2025
Value£20,000,000
Published30 Sept 2025

What is being bought

Under the national Resources and Waste strategy and requirements of Simpler Recycling policy, waste collection authorities (WCAs) that are part of the GMCA waste management arrangements will be required to make changes to current dry, mixed recycling (DMR) collections increasing the range of materials to be collected. The existing materials recovery facility (MRF) at Longley Lane, Sharston does not have the capacity or the sorting equipment required to process these additional materials. GMCA (the Authority) is therefore looking to procure the design, build, installation, commissioning, and testing of new commingled dry recyclable material processing systems to be installed within the existing building at the Salford Road, Over Hulton, Bolton site to create a new Mechanical Recovery Facility (MRF). The Salford Road site building has previously operated as an In-Vessel Composting facility and most recently a Bio Transfer Loading Station. The previous equipment has been removed and internal structure of the building refurbished to provide a clean operational space to accommodate new recyclable sorting equipment. On completion of the works the site will be able to process commingled dry recyclable material collected from households across Greater Manchester, with plant outputs in the form of loose material (glass) or baled recyclable materials, with a capacity 140,000 tonnes per annum of input commingled material. The new plant is expected to operate across two x 8 hours shifts daily (Monday - Friday) plus one additional 8-hour shift (Saturday). It is expected to employ one 8-hour daily cleaning shift (Monday - Friday). Maintenance which cannot be completed with the plant "on-line" will be scheduled for non-operational periods, i.e. overnight and at weekends. The key objectives of the procurement are: • That the Works are executed with the highest regard for Health and Safety. • In considering Plant performance, the design and equipment selection shall consider the following objectives: o High equipment availability o High equipment reliability over the long term o Consideration of Capital vs Operational Costs to produce the lowest total cost of ownership o Minimising low-grade operator roles through the use of automated processes o The use of AI to enhance capture and purity rates of materials o Good access for maintenance, demonstrated through HAZOP and Access, Lifting and Maintenance workshops o Good design and access for regular cleaning o High capture rate and purity of Aluminium o High capture rate and purity of natural HDPE o High capture rate and purity of clear PET o High capture rate of glass o High capture rate of film o Flexibility in the design to allow for the future capture of new materials, or to adapt to changes in market specifications of existing materials (eg purity levels), or to allow integration of AI/automation Civil works do not form part of this procurement. Following the Pre-Market Engagement Events, which were carried out on Monday 30th June 2025 and Wednesday 2nd July 2025, the Authority will now commence with the Competitive Flexible Procedure. The Authority reserves the right to issue updated versions (Modifications) of the documents to Suppliers as and when the need arises, in order to reflect the corresponding stage of the Competitive Flexible Procedure, together with any changes to the Procurement or any other new information. The Authority also reserves the right following contract award, as reflected in Schedule 8 of the new Procurement Act 2023, to make various Modifications (unforeseen at this moment) as the contract evolves over the full term of the agreement. In order to bid for this procurement, interested parties must ensure they are registered on the Central Digital Platform (https://www.gov.uk/find-Tender) and the Chest e-tendering portal (www.the-chest.org.uk).

Delivery location

UKD3, GB

Categories

Recycling equipment 42914000Miscellaneous special-purpose machinery 42990000Engineering-design services for industrial process and production 71323000

Lot details

Lot 1

No lot description published.

Statusactive
Value£20,000,000
Contract periodFrom 20 Apr 2026 to 19 Aug 2027

Award criteria
Technical (60%)
Commercial (40%)

What is included

ItemCategoryQuantity
1Recycling equipment, Miscellaneous special-purpose machinery, Engineering-design services for industrial process and productionNot published

Comparable-procurement analytics

Benchmarked against retained Find a Tender procedures with CPV division 42. The category anchor is Recycling equipment (42914000); this is a deliberately broad market comparator. The comparison is shown at several levels rather than pretending one company or region is always the best benchmark.

Comparison setProceduresReported bids per procedureNamed award suppliersPrice evidence
Market: CPV division 421,9124 median · 50.5 average (677 of 1,912 with a bid count)6.3 average (722 of 1,912 with named award suppliers)Not published
Same buyer0Not publishedNot publishedNot published
Delivery region: UKD31145.5 median · 363.8 average (4 of 11 with a bid count)18.8 average (5 of 11 with named award suppliers)Not published
Similar published value (0.5×–2×)87Not publishedNot publishedNot published

“Reported bids” is an official aggregate, sometimes reported per lot; it is the closest available competition measure. “Named award suppliers” are winners, not all applicants.

Price-outcome signal

Not enough comparable procedures currently publish both a GBP tender value and a usable lowest-valid-bid value to calculate a responsible price-reduction benchmark. Tenderline deliberately does not infer a saving from named award suppliers or from missing award values.

Procurement strategy & market signals

Framework agreementNot published
Dynamic purchasing systemNot published
Competitive procurementNot published
Recurring requirementNot published
Procurement method rationaleNot published
Rationale classificationsNot published
Special regimeNot published
Covered byNot published
Submission policyallowed
Selection criteriaNot published
Risk details1. Known Risk Due to the volatility of the international economic global economy including (but not limited to) war and conflict, and the trade tariffs imposed by the United States and China in 2025, there is a risk that the supply chain of goods into the United Kingdom could be affected resulting in scarcity of supply and additional or increased costs for the goods. The materialisation of this risk would need to be demonstrated to the Authority by clear evidence of the impact of the global economy on the supply chain and costs of goods to be provided under the Contract as detailed in the Specification. The Authority, acting reasonably, will determine whether they are satisfied with the evidence prior to any modification of the Contract.

Planning & early market engagement

BudgetNot published
No-engagement rationaleNot published
Planning documents0
Planning milestones0

No planning milestones published.

Related procurements

No linked framework, prior procurement or reprocurement published.

Documents & submission route

Source data inventory

Diagnostic view. “Not published” means this current release does not provide a value.

OCIDocds-h6vhtk-051574
Latest release ID061078-2025
Latest release timestampTue Sep 30 2025 16:22:27 GMT+0000 (Coordinated Universal Time)
Sourcefind-a-tender
Official notice URLhttps://www.find-tender.service.gov.uk/Notice/061078-2025
Tender statusactive
Procurement methodselective
Procurement method detailsCompetitive flexible procedure
Main procurement categorygoods
Above thresholdYes
Legal basis2023/54
Tender period: startNot published
Tender period: endNot published
Expression of interest deadline2025-10-17T13:00:00+01:00
Enquiry deadlineNot published
Award period: startNot published
Award period: end2026-04-20T23:59:59+01:00
Submission method detailsAll Tenders must be submitted through The Chest, the North West Procurement portal, and can be accessed using the following link: www.the-chest.org.uk. For the avoidance of doubt, submissions made by any other method will not be accepted. Documents must be downloaded from the Chest and reviewed in detail before Bidders submit any responses.
Submission languagesen
Electronic catalogue policyNot published
Total tender value£20,000,000
Tender lots in source1
Tender items in source1
Tender documents in source2
Awards in latest release0
Contracts in latest release0
Parties in latest release1

Notice history

DateEventReference
30 Sept 2025tenderUpdate061078-2025
5 Sept 2025tender054296-2025
16 Jun 2025planning032729-2025
16 May 2025planning022087-2025

All source data

Unmodified official OCDS data retained by Tenderline for this procurement process.

Complete current OCDS release JSON
{
  "id": "061078-2025",
  "tag": [
    "tenderUpdate"
  ],
  "date": "2025-09-30T17:22:27+01:00",
  "ocid": "ocds-h6vhtk-051574",
  "buyer": {
    "id": "GB-PPON-PXBN-3793-LCTQ",
    "name": "Greater Manchester Combined Authority"
  },
  "tender": {
    "id": "GMCA 1185",
    "lots": [
      {
        "id": "1",
        "value": {
          "amount": 20000000,
          "currency": "GBP",
          "amountGross": 24000000
        },
        "status": "active",
        "renewal": {
          "description": "The contract period will be for 16 months with the option to extend for up to an additional 6 months. It is intended for the contract to commence in April 2026."
        },
        "hasRenewal": true,
        "awardCriteria": {
          "criteria": [
            {
              "name": "Technical",
              "type": "quality",
              "numbers": [
                {
                  "number": 60,
                  "weight": "percentageExact"
                }
              ]
            },
            {
              "name": "Commercial",
              "type": "price",
              "numbers": [
                {
                  "number": 40,
                  "weight": "percentageExact"
                }
              ]
            }
          ]
        },
        "contractPeriod": {
          "endDate": "2027-08-19T23:59:59+01:00",
          "startDate": "2026-04-20T00:00:00+01:00",
          "maxExtentDate": "2028-02-19T23:59:59Z"
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UKD3",
            "country": "GB",
            "countryName": "United Kingdom"
          }
        ],
        "additionalClassifications": [
          {
            "id": "42914000",
            "scheme": "CPV",
            "description": "Recycling equipment"
          },
          {
            "id": "42990000",
            "scheme": "CPV",
            "description": "Miscellaneous special-purpose machinery"
          },
          {
            "id": "71323000",
            "scheme": "CPV",
            "description": "Engineering-design services for industrial process and production"
          }
        ]
      }
    ],
    "title": "GMCA 1185 Salford Road MRF Equipment",
    "value": {
      "amount": 20000000,
      "currency": "GBP",
      "amountGross": 24000000
    },
    "status": "active",
    "documents": [
      {
        "id": "conflictOfInterest",
        "description": "Not published",
        "documentType": "conflictOfInterest"
      },
      {
        "id": "061078-2025",
        "url": "https://www.find-tender.service.gov.uk/Notice/061078-2025",
        "format": "text/html",
        "noticeType": "UK4",
        "description": "Tender notice on Find a Tender",
        "documentType": "tenderNotice",
        "datePublished": "2025-09-30T17:22:27+01:00"
      }
    ],
    "procedure": {
      "features": "This Competitive Flexible Procedure (CFP) procurement process is being conducted in adherence with the Procurement Act 2023.\nThis CFP will consist of three stages:\nStage 1 - Selection Stage/Conditions of Participation\nStage 2 - Invitation to Tender\nStage 3 - Detailed Negotiation & Best and Final Offer/Design\nThis Tender Notice will commence the start of Stage 1 of the process.\nDetails of the step-by-step process, and detailed requirements are provided within the documents attached to the opportunity that can be found by visiting the GMCA's e-tendering portal, The Chest: https://www.the-chest.org.uk/"
    },
    "amendments": [
      {
        "id": "061078-2025",
        "description": "Submission deadline corrected from 23:59 on 17/10/2025 to 13:00 on 17/10/2025 in line with published tender documents"
      }
    ],
    "legalBasis": {
      "id": "2023/54",
      "uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents",
      "scheme": "UKPGA"
    },
    "awardPeriod": {
      "endDate": "2026-04-20T23:59:59+01:00"
    },
    "description": "Under the national Resources and Waste strategy and requirements of Simpler Recycling policy, waste collection authorities (WCAs) that are part of the GMCA waste management arrangements will be required to make changes to current dry, mixed recycling (DMR) collections increasing the range of materials to be collected.\nThe existing materials recovery facility (MRF) at Longley Lane, Sharston does not have the capacity or the sorting equipment required to process these additional materials.\nGMCA (the Authority) is therefore looking to procure the design, build, installation, commissioning, and testing of new commingled dry recyclable material processing systems to be installed within the existing building at the Salford Road, Over Hulton, Bolton site to create a new Mechanical Recovery Facility (MRF).\nThe Salford Road site building has previously operated as an In-Vessel Composting facility and most recently a Bio Transfer Loading Station. The previous equipment has been removed and internal structure of the building refurbished to provide a clean operational space to accommodate new recyclable sorting equipment.\nOn completion of the works the site will be able to process commingled dry recyclable material collected from households across Greater Manchester, with plant outputs in the form of loose material (glass) or baled recyclable materials, with a capacity 140,000 tonnes per annum of input commingled material.\nThe new plant is expected to operate across two x 8 hours shifts daily (Monday - Friday) plus one additional 8-hour shift (Saturday). It is expected to employ one 8-hour daily cleaning shift (Monday - Friday).\nMaintenance which cannot be completed with the plant \"on-line\" will be scheduled for non-operational periods, i.e. overnight and at weekends.\nThe key objectives of the procurement are:\n• That the Works are executed with the highest regard for Health and Safety.\n• In considering Plant performance, the design and equipment selection shall consider the following objectives:\no High equipment availability\no High equipment reliability over the long term\no Consideration of Capital vs Operational Costs to produce the lowest total cost of ownership\no Minimising low-grade operator roles through the use of automated processes\no The use of AI to enhance capture and purity rates of materials\no Good access for maintenance, demonstrated through HAZOP and Access, Lifting and Maintenance workshops\no Good design and access for regular cleaning\no High capture rate and purity of Aluminium\no High capture rate and purity of natural HDPE\no High capture rate and purity of clear PET\no High capture rate of glass\no High capture rate of film\no Flexibility in the design to allow for the future capture of new materials, or to adapt to changes in market specifications of existing materials (eg purity levels), or to allow integration of AI/automation\nCivil works do not form part of this procurement.\nFollowing the Pre-Market Engagement Events, which were carried out on Monday 30th June 2025 and Wednesday 2nd July 2025, the Authority will now commence with the Competitive Flexible Procedure.\nThe Authority reserves the right to issue updated versions (Modifications) of the documents to Suppliers as and when the need arises, in order to reflect the corresponding stage of the Competitive Flexible Procedure, together with any changes to the Procurement or any other new information.\nThe Authority also reserves the right following contract award, as reflected in Schedule 8 of the new Procurement Act 2023, to make various Modifications (unforeseen at this moment) as the contract evolves over the full term of the agreement.\nIn order to bid for this procurement, interested parties must ensure they are registered on the Central Digital Platform (https://www.gov.uk/find-Tender) and the Chest e-tendering portal (www.the-chest.org.uk).",
    "riskDetails": "1. Known Risk\nDue to the volatility of the international economic global economy including (but not limited to) war and conflict, and the trade tariffs imposed by the United States and China in 2025, there is a risk that the supply chain of goods into the United Kingdom could be affected resulting in scarcity of supply and additional or increased costs for the goods. The materialisation of this risk would need to be demonstrated to the Authority by clear evidence of the impact of the global economy on the supply chain and costs of goods to be provided under the Contract as detailed in the Specification. The Authority, acting reasonably, will determine whether they are satisfied with the evidence prior to any modification of the Contract.",
    "aboveThreshold": true,
    "submissionTerms": {
      "languages": [
        "en"
      ],
      "electronicSubmissionPolicy": "allowed"
    },
    "procurementMethod": "selective",
    "mainProcurementCategory": "goods",
    "submissionMethodDetails": "All Tenders must be submitted through The Chest, the North West Procurement portal, and can be accessed using the following link: www.the-chest.org.uk. For the avoidance of doubt, submissions made by any other method will not be accepted.\nDocuments must be downloaded from the Chest and reviewed in detail before Bidders submit any responses.",
    "procurementMethodDetails": "Competitive flexible procedure",
    "expressionOfInterestDeadline": "2025-10-17T13:00:00+01:00"
  },
  "parties": [
    {
      "id": "GB-PPON-PXBN-3793-LCTQ",
      "name": "Greater Manchester Combined Authority",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKD33",
        "country": "GB",
        "locality": "Manchester",
        "postalCode": "M1 6EU",
        "countryName": "United Kingdom",
        "streetAddress": "56 Oxford Street"
      },
      "details": {
        "classifications": [
          {
            "id": "publicAuthoritySubCentralGovernment",
            "scheme": "UK_CA_TYPE",
            "description": "Public authority - sub-central government"
          }
        ]
      },
      "identifier": {
        "id": "PXBN-3793-LCTQ",
        "scheme": "GB-PPON"
      },
      "contactPoint": {
        "email": "procurement@manchesterfire.gov.uk"
      }
    }
  ],
  "language": "en",
  "initiationType": "tender"
}
Complete JSON history (4 releases)
30 Sept 2025 · 061078-2025 · tenderUpdate
{
  "id": "061078-2025",
  "tag": [
    "tenderUpdate"
  ],
  "date": "2025-09-30T17:22:27+01:00",
  "ocid": "ocds-h6vhtk-051574",
  "buyer": {
    "id": "GB-PPON-PXBN-3793-LCTQ",
    "name": "Greater Manchester Combined Authority"
  },
  "tender": {
    "id": "GMCA 1185",
    "lots": [
      {
        "id": "1",
        "value": {
          "amount": 20000000,
          "currency": "GBP",
          "amountGross": 24000000
        },
        "status": "active",
        "renewal": {
          "description": "The contract period will be for 16 months with the option to extend for up to an additional 6 months. It is intended for the contract to commence in April 2026."
        },
        "hasRenewal": true,
        "awardCriteria": {
          "criteria": [
            {
              "name": "Technical",
              "type": "quality",
              "numbers": [
                {
                  "number": 60,
                  "weight": "percentageExact"
                }
              ]
            },
            {
              "name": "Commercial",
              "type": "price",
              "numbers": [
                {
                  "number": 40,
                  "weight": "percentageExact"
                }
              ]
            }
          ]
        },
        "contractPeriod": {
          "endDate": "2027-08-19T23:59:59+01:00",
          "startDate": "2026-04-20T00:00:00+01:00",
          "maxExtentDate": "2028-02-19T23:59:59Z"
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UKD3",
            "country": "GB",
            "countryName": "United Kingdom"
          }
        ],
        "additionalClassifications": [
          {
            "id": "42914000",
            "scheme": "CPV",
            "description": "Recycling equipment"
          },
          {
            "id": "42990000",
            "scheme": "CPV",
            "description": "Miscellaneous special-purpose machinery"
          },
          {
            "id": "71323000",
            "scheme": "CPV",
            "description": "Engineering-design services for industrial process and production"
          }
        ]
      }
    ],
    "title": "GMCA 1185 Salford Road MRF Equipment",
    "value": {
      "amount": 20000000,
      "currency": "GBP",
      "amountGross": 24000000
    },
    "status": "active",
    "documents": [
      {
        "id": "conflictOfInterest",
        "description": "Not published",
        "documentType": "conflictOfInterest"
      },
      {
        "id": "061078-2025",
        "url": "https://www.find-tender.service.gov.uk/Notice/061078-2025",
        "format": "text/html",
        "noticeType": "UK4",
        "description": "Tender notice on Find a Tender",
        "documentType": "tenderNotice",
        "datePublished": "2025-09-30T17:22:27+01:00"
      }
    ],
    "procedure": {
      "features": "This Competitive Flexible Procedure (CFP) procurement process is being conducted in adherence with the Procurement Act 2023.\nThis CFP will consist of three stages:\nStage 1 - Selection Stage/Conditions of Participation\nStage 2 - Invitation to Tender\nStage 3 - Detailed Negotiation & Best and Final Offer/Design\nThis Tender Notice will commence the start of Stage 1 of the process.\nDetails of the step-by-step process, and detailed requirements are provided within the documents attached to the opportunity that can be found by visiting the GMCA's e-tendering portal, The Chest: https://www.the-chest.org.uk/"
    },
    "amendments": [
      {
        "id": "061078-2025",
        "description": "Submission deadline corrected from 23:59 on 17/10/2025 to 13:00 on 17/10/2025 in line with published tender documents"
      }
    ],
    "legalBasis": {
      "id": "2023/54",
      "uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents",
      "scheme": "UKPGA"
    },
    "awardPeriod": {
      "endDate": "2026-04-20T23:59:59+01:00"
    },
    "description": "Under the national Resources and Waste strategy and requirements of Simpler Recycling policy, waste collection authorities (WCAs) that are part of the GMCA waste management arrangements will be required to make changes to current dry, mixed recycling (DMR) collections increasing the range of materials to be collected.\nThe existing materials recovery facility (MRF) at Longley Lane, Sharston does not have the capacity or the sorting equipment required to process these additional materials.\nGMCA (the Authority) is therefore looking to procure the design, build, installation, commissioning, and testing of new commingled dry recyclable material processing systems to be installed within the existing building at the Salford Road, Over Hulton, Bolton site to create a new Mechanical Recovery Facility (MRF).\nThe Salford Road site building has previously operated as an In-Vessel Composting facility and most recently a Bio Transfer Loading Station. The previous equipment has been removed and internal structure of the building refurbished to provide a clean operational space to accommodate new recyclable sorting equipment.\nOn completion of the works the site will be able to process commingled dry recyclable material collected from households across Greater Manchester, with plant outputs in the form of loose material (glass) or baled recyclable materials, with a capacity 140,000 tonnes per annum of input commingled material.\nThe new plant is expected to operate across two x 8 hours shifts daily (Monday - Friday) plus one additional 8-hour shift (Saturday). It is expected to employ one 8-hour daily cleaning shift (Monday - Friday).\nMaintenance which cannot be completed with the plant \"on-line\" will be scheduled for non-operational periods, i.e. overnight and at weekends.\nThe key objectives of the procurement are:\n• That the Works are executed with the highest regard for Health and Safety.\n• In considering Plant performance, the design and equipment selection shall consider the following objectives:\no High equipment availability\no High equipment reliability over the long term\no Consideration of Capital vs Operational Costs to produce the lowest total cost of ownership\no Minimising low-grade operator roles through the use of automated processes\no The use of AI to enhance capture and purity rates of materials\no Good access for maintenance, demonstrated through HAZOP and Access, Lifting and Maintenance workshops\no Good design and access for regular cleaning\no High capture rate and purity of Aluminium\no High capture rate and purity of natural HDPE\no High capture rate and purity of clear PET\no High capture rate of glass\no High capture rate of film\no Flexibility in the design to allow for the future capture of new materials, or to adapt to changes in market specifications of existing materials (eg purity levels), or to allow integration of AI/automation\nCivil works do not form part of this procurement.\nFollowing the Pre-Market Engagement Events, which were carried out on Monday 30th June 2025 and Wednesday 2nd July 2025, the Authority will now commence with the Competitive Flexible Procedure.\nThe Authority reserves the right to issue updated versions (Modifications) of the documents to Suppliers as and when the need arises, in order to reflect the corresponding stage of the Competitive Flexible Procedure, together with any changes to the Procurement or any other new information.\nThe Authority also reserves the right following contract award, as reflected in Schedule 8 of the new Procurement Act 2023, to make various Modifications (unforeseen at this moment) as the contract evolves over the full term of the agreement.\nIn order to bid for this procurement, interested parties must ensure they are registered on the Central Digital Platform (https://www.gov.uk/find-Tender) and the Chest e-tendering portal (www.the-chest.org.uk).",
    "riskDetails": "1. Known Risk\nDue to the volatility of the international economic global economy including (but not limited to) war and conflict, and the trade tariffs imposed by the United States and China in 2025, there is a risk that the supply chain of goods into the United Kingdom could be affected resulting in scarcity of supply and additional or increased costs for the goods. The materialisation of this risk would need to be demonstrated to the Authority by clear evidence of the impact of the global economy on the supply chain and costs of goods to be provided under the Contract as detailed in the Specification. The Authority, acting reasonably, will determine whether they are satisfied with the evidence prior to any modification of the Contract.",
    "aboveThreshold": true,
    "submissionTerms": {
      "languages": [
        "en"
      ],
      "electronicSubmissionPolicy": "allowed"
    },
    "procurementMethod": "selective",
    "mainProcurementCategory": "goods",
    "submissionMethodDetails": "All Tenders must be submitted through The Chest, the North West Procurement portal, and can be accessed using the following link: www.the-chest.org.uk. For the avoidance of doubt, submissions made by any other method will not be accepted.\nDocuments must be downloaded from the Chest and reviewed in detail before Bidders submit any responses.",
    "procurementMethodDetails": "Competitive flexible procedure",
    "expressionOfInterestDeadline": "2025-10-17T13:00:00+01:00"
  },
  "parties": [
    {
      "id": "GB-PPON-PXBN-3793-LCTQ",
      "name": "Greater Manchester Combined Authority",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKD33",
        "country": "GB",
        "locality": "Manchester",
        "postalCode": "M1 6EU",
        "countryName": "United Kingdom",
        "streetAddress": "56 Oxford Street"
      },
      "details": {
        "classifications": [
          {
            "id": "publicAuthoritySubCentralGovernment",
            "scheme": "UK_CA_TYPE",
            "description": "Public authority - sub-central government"
          }
        ]
      },
      "identifier": {
        "id": "PXBN-3793-LCTQ",
        "scheme": "GB-PPON"
      },
      "contactPoint": {
        "email": "procurement@manchesterfire.gov.uk"
      }
    }
  ],
  "language": "en",
  "initiationType": "tender"
}
5 Sept 2025 · 054296-2025 · tender
{
  "id": "054296-2025",
  "tag": [
    "tender"
  ],
  "date": "2025-09-05T13:54:53+01:00",
  "ocid": "ocds-h6vhtk-051574",
  "buyer": {
    "id": "GB-PPON-PXBN-3793-LCTQ",
    "name": "Greater Manchester Combined Authority"
  },
  "tender": {
    "id": "GMCA 1185",
    "lots": [
      {
        "id": "1",
        "value": {
          "amount": 20000000,
          "currency": "GBP",
          "amountGross": 24000000
        },
        "status": "active",
        "renewal": {
          "description": "The contract period will be for 16 months with the option to extend for up to an additional 6 months. It is intended for the contract to commence in April 2026."
        },
        "hasRenewal": true,
        "awardCriteria": {
          "criteria": [
            {
              "name": "Technical",
              "type": "quality",
              "numbers": [
                {
                  "number": 60,
                  "weight": "percentageExact"
                }
              ]
            },
            {
              "name": "Commercial",
              "type": "price",
              "numbers": [
                {
                  "number": 40,
                  "weight": "percentageExact"
                }
              ]
            }
          ]
        },
        "contractPeriod": {
          "endDate": "2027-08-19T23:59:59+01:00",
          "startDate": "2026-04-20T00:00:00+01:00",
          "maxExtentDate": "2028-02-19T23:59:59Z"
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UKD3",
            "country": "GB",
            "countryName": "United Kingdom"
          }
        ],
        "additionalClassifications": [
          {
            "id": "42914000",
            "scheme": "CPV",
            "description": "Recycling equipment"
          },
          {
            "id": "42990000",
            "scheme": "CPV",
            "description": "Miscellaneous special-purpose machinery"
          },
          {
            "id": "71323000",
            "scheme": "CPV",
            "description": "Engineering-design services for industrial process and production"
          }
        ]
      }
    ],
    "title": "GMCA 1185 Salford Road MRF Equipment",
    "value": {
      "amount": 20000000,
      "currency": "GBP",
      "amountGross": 24000000
    },
    "status": "active",
    "documents": [
      {
        "id": "conflictOfInterest",
        "description": "Not published",
        "documentType": "conflictOfInterest"
      },
      {
        "id": "054296-2025",
        "url": "https://www.find-tender.service.gov.uk/Notice/054296-2025",
        "format": "text/html",
        "noticeType": "UK4",
        "description": "Tender notice on Find a Tender",
        "documentType": "tenderNotice",
        "datePublished": "2025-09-05T13:54:53+01:00"
      }
    ],
    "procedure": {
      "features": "This Competitive Flexible Procedure (CFP) procurement process is being conducted in adherence with the Procurement Act 2023. \nThis CFP will consist of three stages:\nStage 1 - Selection Stage/Conditions of Participation\nStage 2 - Invitation to Tender\nStage 3 - Detailed Negotiation & Best and Final Offer/Design\nThis Tender Notice will commence the start of Stage 1 of the process. \nDetails of the step-by-step process, and detailed requirements are provided within the documents attached to the opportunity that can be found by visiting the GMCA's e-tendering portal, The Chest: https://www.the-chest.org.uk/"
    },
    "legalBasis": {
      "id": "2023/54",
      "uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents",
      "scheme": "UKPGA"
    },
    "awardPeriod": {
      "endDate": "2026-04-20T23:59:59+01:00"
    },
    "description": "Under the national Resources and Waste strategy and requirements of Simpler Recycling policy, waste collection authorities (WCAs) that are part of the GMCA waste management arrangements will be required to make changes to current dry, mixed recycling (DMR) collections increasing the range of materials to be collected.\nThe existing materials recovery facility (MRF) at Longley Lane, Sharston does not have the capacity or the sorting equipment required to process these additional materials.\nGMCA (the Authority) is therefore looking to procure the design, build, installation, commissioning, and testing of new commingled dry recyclable material processing systems to be installed within the existing building at the Salford Road, Over Hulton, Bolton site to create a new Mechanical Recovery Facility (MRF).\nThe Salford Road site building has previously operated as an In-Vessel Composting facility and most recently a Bio Transfer Loading Station. The previous equipment has been removed and internal structure of the building refurbished to provide a clean operational space to accommodate new recyclable sorting equipment.\nOn completion of the works the site will be able to process commingled dry recyclable material collected from households across Greater Manchester, with plant outputs in the form of loose material (glass) or baled recyclable materials, with a capacity 140,000 tonnes per annum of input commingled material.\nThe new plant is expected to operate across two x 8 hours shifts daily (Monday - Friday) plus one additional 8-hour shift (Saturday). It is expected to employ one 8-hour daily cleaning shift (Monday - Friday).\nMaintenance which cannot be completed with the plant \"on-line\" will be scheduled for non-operational periods, i.e. overnight and at weekends.\nThe key objectives of the procurement are:\n• That the Works are executed with the highest regard for Health and Safety.\n• In considering Plant performance, the design and equipment selection shall consider the following objectives:\no High equipment availability\no High equipment reliability over the long term\no Consideration of Capital vs Operational Costs to produce the lowest total cost of ownership\no Minimising low-grade operator roles through the use of automated processes\no The use of AI to enhance capture and purity rates of materials\no Good access for maintenance, demonstrated through HAZOP and Access, Lifting and Maintenance workshops\no Good design and access for regular cleaning\no High capture rate and purity of Aluminium\no High capture rate and purity of natural HDPE\no High capture rate and purity of clear PET\no High capture rate of glass\no High capture rate of film\no Flexibility in the design to allow for the future capture of new materials, or to adapt to changes in market specifications of existing materials (eg purity levels), or to allow integration of AI/automation\nCivil works do not form part of this procurement.\nFollowing the Pre-Market Engagement Events, which were carried out on Monday 30th June 2025 and Wednesday 2nd July 2025, the Authority will now commence with the Competitive Flexible Procedure.\nThe Authority reserves the right to issue updated versions (Modifications) of the documents to Suppliers as and when the need arises, in order to reflect the corresponding stage of the Competitive Flexible Procedure, together with any changes to the Procurement or any other new information.\nThe Authority also reserves the right following contract award, as reflected in Schedule 8 of the new Procurement Act 2023, to make various Modifications (unforeseen at this moment) as the contract evolves over the full term of the agreement.\nIn order to bid for this procurement, interested parties must ensure they are registered on the Central Digital Platform (https://www.gov.uk/find-Tender) and the Chest e-tendering portal (www.the-chest.org.uk).",
    "riskDetails": "1. Known Risk\nDue to the volatility of the international economic global economy including (but not limited to) war and conflict, and the trade tariffs imposed by the United States and China in 2025, there is a risk that the supply chain of goods into the United Kingdom could be affected resulting in scarcity of supply and additional or increased costs for the goods. The materialisation of this risk would need to be demonstrated to the Authority by clear evidence of the impact of the global economy on the supply chain and costs of goods to be provided under the Contract as detailed in the Specification. The Authority, acting reasonably, will determine whether they are satisfied with the evidence prior to any modification of the Contract.",
    "aboveThreshold": true,
    "submissionTerms": {
      "languages": [
        "en"
      ],
      "electronicSubmissionPolicy": "allowed"
    },
    "procurementMethod": "selective",
    "mainProcurementCategory": "goods",
    "submissionMethodDetails": "All Tenders must be submitted through The Chest, the North West Procurement portal, and can be accessed using the following link: www.the-chest.org.uk. For the avoidance of doubt, submissions made by any other method will not be accepted.\nDocuments must be downloaded from the Chest and reviewed in detail before Bidders submit any responses.",
    "procurementMethodDetails": "Competitive flexible procedure",
    "expressionOfInterestDeadline": "2025-10-17T23:59:59+01:00"
  },
  "parties": [
    {
      "id": "GB-PPON-PXBN-3793-LCTQ",
      "name": "Greater Manchester Combined Authority",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKD33",
        "country": "GB",
        "locality": "Manchester",
        "postalCode": "M1 6EU",
        "countryName": "United Kingdom",
        "streetAddress": "56 Oxford Street"
      },
      "details": {
        "classifications": [
          {
            "id": "publicAuthoritySubCentralGovernment",
            "scheme": "UK_CA_TYPE",
            "description": "Public authority - sub-central government"
          }
        ]
      },
      "identifier": {
        "id": "PXBN-3793-LCTQ",
        "scheme": "GB-PPON"
      },
      "contactPoint": {
        "email": "procurement@manchesterfire.gov.uk"
      }
    }
  ],
  "language": "en",
  "initiationType": "tender"
}
16 Jun 2025 · 032729-2025 · planning
{
  "id": "032729-2025",
  "tag": [
    "planning"
  ],
  "date": "2025-06-16T16:25:29+01:00",
  "ocid": "ocds-h6vhtk-051574",
  "buyer": {
    "id": "GB-PPON-PXBN-3793-LCTQ",
    "name": "Greater Manchester Combined Authority"
  },
  "tender": {
    "id": "GMCA 1185",
    "lots": [
      {
        "id": "1",
        "status": "planned",
        "hasRenewal": true,
        "contractPeriod": {
          "endDate": "2027-07-05T23:59:59+01:00",
          "startDate": "2026-01-05T00:00:00Z",
          "maxExtentDate": "2028-01-05T23:59:59Z"
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UKD3",
            "country": "GB",
            "countryName": "United Kingdom"
          }
        ],
        "additionalClassifications": [
          {
            "id": "42914000",
            "scheme": "CPV",
            "description": "Recycling equipment"
          },
          {
            "id": "42990000",
            "scheme": "CPV",
            "description": "Miscellaneous special-purpose machinery"
          },
          {
            "id": "71323000",
            "scheme": "CPV",
            "description": "Engineering-design services for industrial process and production"
          }
        ]
      }
    ],
    "title": "GMCA 1185 Salford Road MRF",
    "value": {
      "amount": 20000000,
      "currency": "GBP",
      "amountGross": 24000000
    },
    "status": "planned",
    "legalBasis": {
      "id": "2023/54",
      "uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents",
      "scheme": "UKPGA"
    },
    "description": "1.0\tBackground\nUnder the national Resources and Waste strategy and requirements of Simpler Recycling policy, waste collection authorities (WCAs) that are part of the GMCA waste management arrangements will be required to make changes to current dry, mixed recycling (DMR) collections increasing the range of materials to be collected.\nThe existing materials recovery facility (MRF) at Longley Lane, Sharston does not have the capacity or the sorting equipment required to process these additional materials. \nGMCA is therefore looking for to procure the design, build, installation, commissioning, and testing of new commingled dry recyclable material processing systems to be installed within the existing building at the Salford Road, Over Hulton, Bolton site to create a new Mechanical Recovery Facility (MRF).\nThe Salford Road site building has previously operated as an In-Vessel Composting facility and most recently a Bio Transfer Loading Station. The previous equipment has been removed and internal structure of the building refurbished to provide a clean operational space to accommodate new recyclable sorting equipment.\nOn completion of the works the site will be able to process commingled dry recyclable material collected from households across Greater Manchester, with plant outputs in the form of loose material (glass) or baled recyclable materials, with a capacity 140,000 tonnes per annum of input commingled material. \nThe new plant is expected to operate across two x 8 hours shifts daily (Monday - Friday) plus one additional 8-hour shift (Saturday). It is expected to employ one 8-hour daily cleaning shift (Monday - Friday). \nMaintenance which cannot be completed with the plant \"on-line\" will be scheduled for non-operational periods, i.e. overnight and at weekends.\n1.2\tKey Objectives\nThe key objectives of the procurement are:\n•\tThat the Works are executed with the highest regard for Health and Safety.\n•\tIn considering Plant performance, the design and equipment selection shall consider the following objectives:\no\tHigh equipment availability\no\tHigh equipment reliability over the long term\no\tConsideration of Capital vs Operational Costs to produce the lowest total cost of ownership\no\tMinimising low-grade operator roles through the use of automated processes\no\tThe use of AI to enhance capture and purity rates of materials\no\tGood access for maintenance, demonstrated through HAZOP and Access, Lifting and Maintenance workshops\no\tGood design and access for regular cleaning\no\tHigh capture rate and purity of Aluminium\no\tHigh capture rate and purity of natural HDPE\no\tHigh capture rate and purity of clear PET\no\tHigh capture rate of glass\no\tHigh capture rate of film\no\tFlexibility in the design to allow for the future capture of new materials, or to adapt to changes in market specifications of existing materials (eg purity levels), or to allow integration of AI/automation\nCivil works do not form part of this procurement.",
    "aboveThreshold": true,
    "mainProcurementCategory": "goods"
  },
  "parties": [
    {
      "id": "GB-PPON-PXBN-3793-LCTQ",
      "name": "Greater Manchester Combined Authority",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKD33",
        "country": "GB",
        "locality": "Manchester",
        "postalCode": "M1 6EU",
        "countryName": "United Kingdom",
        "streetAddress": "56 Oxford Street"
      },
      "details": {
        "classifications": [
          {
            "id": "publicAuthoritySubCentralGovernment",
            "scheme": "UK_CA_TYPE",
            "description": "Public authority - sub-central government"
          }
        ]
      },
      "identifier": {
        "id": "PXBN-3793-LCTQ",
        "scheme": "GB-PPON"
      },
      "contactPoint": {
        "email": "procurement@manchesterfire.gov.uk"
      }
    }
  ],
  "language": "en",
  "planning": {
    "documents": [
      {
        "id": "032729-2025",
        "url": "https://www.find-tender.service.gov.uk/Notice/032729-2025",
        "format": "text/html",
        "noticeType": "UK2",
        "description": "Preliminary market engagement notice on Find a Tender",
        "documentType": "marketEngagementNotice",
        "datePublished": "2025-06-16T16:25:29+01:00"
      }
    ],
    "milestones": [
      {
        "id": "engagement",
        "type": "engagement",
        "status": "scheduled",
        "dueDate": "2025-07-02T23:59:59+01:00",
        "description": "GMCA will be conducting a market engagement event in relation to GMCA 1185 Materials Recovery Facility (MRF) Salford Road, Over Hulton, Bolton.\nMarket Engagement will take place on: Monday 30th June 2025 and Wednesday 2nd July 2025.\n•\tSession 1 AM 09.00-12.00 inclusive of x3 (20min) 1-2-1 slots available (following the presentation)\n•\t12.00 - 13.00 Lunch break \n•\tSession 2 PM 13.00-16.00 inclusive of x3 (20min) slots available (following the presentation)\n (All sessions will be the same.)\nThe purpose of this event is to present the project, engage with the market and to inform the procurement process. \nStructure of day:  Presentation to explain high level detail of the proposed project, opportunity for individual conversations (time slotted) and Site Visit. \nDue to the limited capacity of space, booking prior to attendance is imperative.  Bookings can be made via Michael Kelly at: Michael.Kelly@greatermanchester-ca.gov.uk\nAttendance will be limited to a maximum of 2 representatives per supplier. \nBooking Deadline: Friday 27th June 12noon\nTimed slots will be allocated upon booking & on a first come first served basis.\nPlease provide:\n•\tNames of Participants \n•\tOrganisation Name\nAll slides and relevant findings in line with PA23 regulations will be shared publicly following the market engagement events.\nAttendance is not mandatory. Non -attendance will not exclude you from participating in this opportunity. \nChest address: The Chest: North West Procurement Portal  and reference GMCA 1185 Salford Road MRF. Address: Recycle for Greater Manchester, Solar Farm, Salford Road, Bolton, BL5 1DG"
      }
    ]
  },
  "initiationType": "tender"
}
16 May 2025 · 022087-2025 · planning
{
  "id": "022087-2025",
  "tag": [
    "planning"
  ],
  "date": "2025-05-16T10:41:13+01:00",
  "ocid": "ocds-h6vhtk-051574",
  "buyer": {
    "id": "GB-PPON-PXBN-3793-LCTQ",
    "name": "Greater Manchester Combined Authority"
  },
  "tender": {
    "id": "GMCA 1185",
    "lots": [
      {
        "id": "1",
        "status": "planned",
        "contractPeriod": {
          "endDate": "2027-03-31T23:59:59+01:00",
          "startDate": "2025-12-31T00:00:00Z"
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UKD3",
            "country": "GB",
            "countryName": "United Kingdom"
          }
        ],
        "additionalClassifications": [
          {
            "id": "42914000",
            "scheme": "CPV",
            "description": "Recycling equipment"
          },
          {
            "id": "42990000",
            "scheme": "CPV",
            "description": "Miscellaneous special-purpose machinery"
          },
          {
            "id": "71323000",
            "scheme": "CPV",
            "description": "Engineering-design services for industrial process and production"
          }
        ]
      }
    ],
    "title": "GMCA 1185 Salford Road MRF Equipment",
    "status": "planned",
    "legalBasis": {
      "id": "2023/54",
      "uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents",
      "scheme": "UKPGA"
    },
    "description": "Under the national Resources and Waste strategy and requirements of Simpler Recycling policy, waste collection authorities (WCAs) that are part of the GMCA waste management arrangements will be required to make changes to current dry, mixed recycling (DMR) collections increasing the range of materials to be collected.\nThe existing materials recovery facility (MRF) at Longley Lane, Sharston does not have the capacity or the sorting equipment required to process these additional materials. \nGMCA is therefore looking for to procure the design, build, installation, commissioning, and testing of new commingled dry recyclable material processing systems to be installed within the existing building at the Salford Road, Over Hulton, Bolton site to create a new Mechanical Recovery Facility (MRF).\nThe Salford Road site building has previously operated as an In-Vessel Composting facility and most recently a Bio Transfer Loading Station. The previous equipment has been removed and internal structure of the building refurbished to provide a clean operational space to accommodate new recyclable sorting equipment.\nOn completion of the works the site will be able to process commingled dry recyclable material collected from households across Greater Manchester, with plant outputs in the form of loose material (glass) or baled recyclable materials, with a capacity 140,000 tonnes per annum of input commingled material. \nThe new plant is expected to operate across two x 8 hours shifts daily (Monday - Friday) plus one additional 8-hour shift (Saturday). It is expected to employ one 8-hour daily cleaning shift (Monday - Friday). \nMaintenance which cannot be completed with the plant \"on-line\" will be scheduled for non-operational periods, i.e. overnight and at weekends.\nThe key objectives of the procurement are:\n•\tThat the Works are executed with the highest regard for Health and Safety.\n•\tIn considering Plant performance, the design and equipment selection shall consider the following objectives:\no\tHigh equipment availability\no\tHigh equipment reliability over the long term\no\tConsideration of Capital vs Operational Costs to produce the lowest total cost of ownership\no\tMinimising low-grade operator roles through the use of automated processes\no\tThe use of AI to enhance capture and purity rates of materials\no\tGood access for maintenance, demonstrated through HAZOP and Access, Lifting and Maintenance workshops\no\tGood design and access for regular cleaning\no\tHigh capture rate and purity of Aluminium\no\tHigh capture rate and purity of natural HDPE\no\tHigh capture rate and purity of clear PET\no\tHigh capture rate of glass\no\tHigh capture rate of film\no\tFlexibility in the design to allow for the future capture of new materials, or to adapt to changes in market specifications of existing materials (eg purity levels), or to allow integration of AI/automation\nCivil works do not form part of this procurement.",
    "communication": {
      "futureNoticeDate": "2025-07-31T23:59:59+01:00"
    },
    "mainProcurementCategory": "goods"
  },
  "parties": [
    {
      "id": "GB-PPON-PXBN-3793-LCTQ",
      "name": "Greater Manchester Combined Authority",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKD33",
        "country": "GB",
        "locality": "Manchester",
        "postalCode": "M1 6EU",
        "countryName": "United Kingdom",
        "streetAddress": "56 Oxford Street"
      },
      "details": {
        "classifications": [
          {
            "id": "publicAuthoritySubCentralGovernment",
            "scheme": "UK_CA_TYPE",
            "description": "Public authority - sub-central government"
          }
        ]
      },
      "identifier": {
        "id": "PXBN-3793-LCTQ",
        "scheme": "GB-PPON"
      },
      "contactPoint": {
        "email": "procurement@manchesterfire.gov.uk"
      }
    }
  ],
  "language": "en",
  "planning": {
    "documents": [
      {
        "id": "022087-2025",
        "url": "https://www.find-tender.service.gov.uk/Notice/022087-2025",
        "format": "text/html",
        "noticeType": "UK1",
        "description": "Pipeline notice on Find a Tender",
        "documentType": "plannedProcurementNotice",
        "datePublished": "2025-05-16T10:41:13+01:00"
      }
    ]
  },
  "initiationType": "tender"
}