Official UK procurement notice
Future Port Talbot market engagement
Authority: Associated British Ports
What is being bought
Published requirement descriptionThe development of a major hub for floating offshore wind (FLOW) and green energy development at Port Talbot will be delivered as part of the overarching programme called Future Port Talbot (FPT). This will complement The Crown Estate’s leasing round for FLOW in the Celtic Sea.
CPV: Construction structures and materials; auxiliary products to construction (except electric apparatus) · Construction work
The lotProcurement structure
single lot · no lot value publishedProcedure terms & legal framework
From the official record · publisher note attached- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Past planning notice
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 8 Aug 2024, 12:25 BST
- Last source update
- 8 Aug 2024, 12:25 BST
- FTS notice number
2024/S 000-025027- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-0488e6Find a Tender
Publisher note: INFORMATION SOURCESABP’s overarching vision for its network of ports in South Wales – Swansea, Port Talbot, Barry, Cardiff and Newport can be found here:Associated British Ports | Future Ports: Wales Vision (abports.co.uk).Further information regarding Future Port Talbot can be found here:Associated British Ports | Future Ports: Port Talbot (abports.co.uk)Further information about the Port of Port Talbot can be found here:Associated British Ports – Port of Port TalbotFPT MARKET ENGAGEMENT DAYABP are currently arranging a supplier engagement day which is estimated to be held in mid-September, once finalised full details will follow.REQUIREMENTSThe programme is likely to include many different packages of work and services. A high-level indication is provided below. At this early design stage, the requirements below are indicative and may change as the design and requirements are developed.SITE CLEARANCEThe 11ha site will require the removal of inert and contaminated materials. The total estimated volume of the site level excavation are as follows: 113,000 m3 reduced level excavation; removal of approx. 90,000 m3 inert, 17,000 m3 non–hazardous, and 6,000 m3 hazardous material.To complete the ground preparation works a capping layer will be formed at a depth of 300mm to deliver a development platform enabling use of the site for hardstanding. The total volume of capping layer will be approximately 33,000 m3.All metrics provided are indicative at this early stage in the project to inform the scale of the works only, and are subject to change pending further investigation, survey and design works.NEW ROADThe work is expected to consist of construction of a new single carriageway road and remedial work to the existing carriageway.The works required will be the refurbishment and widening of approx. 1,000lm of existing carriageway and approx. 1,000lm of new single carriageway construction ; the total distance of road construction will be approximately 2,000 Im.SAND QUARRY RESTORATIONSite restoration of a former sand quarry comprising site clearance, excavation and other earthworks .The material removed is likely to include inert, contaminated non-hazardous and contaminated hazardous materials. The approximate volumes of this material are included within those stated for Site Clearance above. There will be approximately 237,000m3 of fill required utilising on site and imported material.As the programme develops and the design matures, further requirements are likely.HABITAT IMPROVEMENT WORKSHabitat works for ecological mitigation, including but not limited to the design and implementation of landscaping works.UTILITIES AND DRAINAGEEarthworks in connection with utilities and drainage.TIMELINEThe procurement of the requirements are likely to commence during Autumn 2024. The expected start date on site would then be during Q1 2025, with potential enabling works commencing Q4 2024.Work packageActivity Approximate DatesSite clearanceVegetation/ecology removal – Q2-3 2025Construction – Q3 2025 – Q1 2026New roadVegetation/ecology removal – Q2-3 2025Construction – Q3 2025 – Q1 2026Sand quarry restorationVegetation/ecology removal – Q2-3 2025Construction – Q3 2025 – Q3 2026Habitat Improvement WorksConstruction - Q4 2024 – Q2 2025Utilities and DrainageConstruction – Q2 2025 – Q1 2026PROCUREMENT PORTALABP will be using the In-Tend host e-tendering portal to issue future tender opportunities.https://in-tendhost.co.uk/abp/aspx/HomeProspective bidders should ensure that they register on the portal in readiness for when future opportunities are published.EXPRESSING AN INTERESTABP requests that interested parties initially record an interest on the Contracts Finder/ Find a Tender/ Sell2Wales site (where this PIN was originally published) and should ensure that they are registered for future notifications from the respective portal.In addition, we encourage interested parties to respond to the
How it was run
Official notice- Submission deadline
- —
Timeline
8 Aug 2024 → 8 Aug 2024 · 2 dates- Tender notice expected8 Aug 2024, 00:00 BST
- Notice published8 Aug 2024, 12:25 BST
Commercial outcome & contract awards
Pipeline notice- Awards (0)
- No award published
- Contracts (0)
- No contract published
- Bid statistics
- No aggregate bid statistics published
Contracting authority & participating public bodies
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.