Published 22 Mar 2022, 17:16 GMT

Official UK procurement notice

Forth Bridge Walk Experience On-Bridge Works

Official notice

Authority: NETWORK RAIL INFRASTRUCTURE LIMITED (Central government)

WorksAward procedure without prior publication of a call for competition
Awarded value£7,000,000published contract · exc. VAT
Awarded 22 Mar 2022no call for competition
Awarded to Balfour Beatty Civil Engineering Limited

What is being bought

Published requirement description

A procurement event commenced in Summer 2020 for a single design and build contract covering a visitor reception (Off-Bridge) and public walk way (On-Bridge) on the Forth Bridge. No bids within the available and advertised funding envelope were received and the procurement was terminated.

Consequently the procurement is being awarded as two separate packages covering the On and Off Bridge work. This is a contract for Early Contractor Involvement services to assist with planning for the design and build of the On-Bridge works only. A decision has been made to award this to the contractor who holds the separate bridge maintenance contract. They have a unique understanding of the safety risks to the workforce on this structure. There is an option within for the contractor to progress from the ECI phase to full design and build, if instructed this is anticipated to be valued at approximately £7m.

The contract for the design and build of the Off-Bridge works will be procured via Find a Tender commencing with a PIN inviting interested parties to attend an engagement session.

CPV: Construction work for bridges

The lotProcurement structure

single lot · no lot value published
Lot #1This is a contract for Early Contractor Involvement services to assist with planning…Awarded

This is a contract for Early Contractor Involvement services to assist with planning for the design and build of a walkway on the Forth Bridge which is open to the public.

There is an option within for the contractor to progress from the ECI phase to full design and build, if instructed this is anticipated to be valued at approximately £7m.

Delivery: Scotland
Extensions: Option 1 - Design and Build

Procedure terms & legal framework

From the official record
Procedure method
Award procedure without prior publication of a call for competition
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Works
Notice status
Awarded without competition
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Direct award (no call for competition)
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
22 Mar 2022, 17:16 GMT
Last source update
22 Mar 2022, 17:16 GMT
FTS notice number
2022/S 000-007791
Classification (CPV)
Construction work for bridges
Delivery area
Scotland (UKM)
Official registry OCID
ocds-h6vhtk-032509 Find a Tender
Why no open competition
The procurement falls outside the scope of application of the directive
Published justification

A procurement event commenced in Summer 2020 for a single design and build contract covering a visitor reception (Off-Bridge) and public walk way (On-Bridge) on the Forth Bridge. No bids within the available and advertised funding envelope were received and the procurement was terminated.

Consequently the procurement is being awarded as two separate packages covering the On and Off Bridge work. This is a contract for Early Contractor Involvement services to assist with planning for the design and build of the On-Bridge works only. A decision has been made to award this to the contractor who holds the separate bridge maintenance contract. They have a unique understanding of the safety risks to the workforce on this structure. There is an option within for the contractor to progress from the ECI phase to full design and build, if instructed this is anticipated to be valued at approximately £7m.

The contract for the design and build of the Off-Bridge works will be procured via Find a Tender commencing with a PIN inviting interested parties to attend an engagement session.

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 1
Awarded value £7,000,0001 contract exc. VAT
Bids received 1
Contracts signed 1latest 22 Mar 2022
Awarded toValueDateStatus
Balfour Beatty Civil Engineering Limited£7,000,000 †—Awarded

Contracts

Bid statistics published by the authority

BidsSMEVCSEValid bid range
1bids · 1 electronic———

Contracting authority & participating public bodies

Network Rail Infrastructure Ltd

Contracting authorityCentral GovernmentBody governed by public lawRail Infrastructure 1 Eversholt Street, London, UK, NW1 2DNContact email, phone

Dispute resolution & review bodies

  • High Court of EnglandReview body London

Bidders & participating suppliers

1 commercial party on the notice

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.