Official UK procurement notice
for the completion of the Integrated Control & Safety System (ICSS) for the H3AT Tritium Facility at Culham
Authority: UK Atomic Energy Authority (Central government)
What is being bought
Published requirement descriptionScope of supply is for the continued design development, procurement, manufacture, testing, installation and verification activities for the H3AT Integrated Control and Safety System (ICS).
The lotProcurement structure
single lot · no lot value publishedProcedure terms & legal framework
From the official record- Procedure method
- Direct award
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Notice status
- Awarded without competition
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Direct award (no call for competition)
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 2 Jul 2026, 14:27 BST
- Last source update
- 8 Sept 2026, 08:43 BST
- Authority reference
JP-ICS-001- FTS notice number
2026/S 000-084682- Latest notice
- Contract award notice (UK6)
- Delivery area
- Official registry OCID
ocds-h6vhtk-06c27dFind a Tender
- Why no open competition
- Single Suppliers Technical Reasons
- Published justification
This notice provides transparency of UKAEA’s intention to award a contract to Bilfinger UK Limited (BUK) for the completion of the Integrated Control & Safety System (ICSS) for the H3AT Tritium Facility at Culham. The ICSS scope forms a critical part of the H3AT facility, covering the design finalisation, manufacture, installation, testing and commissioning of the control, interlock and safety systems required to safely operate the tritium plant. BUK was originally engaged as a specialist subcontractor under a wider contract with a previous main contractor (DBD), with direct responsibility for delivering the ICSS scope. Following the termination of the DBD contract, the ICSS works remain partially complete (approximately 50%) and have been significantly progressed by BUK. UKAEA intends to award a direct contract to BUK to complete the remaining works for the following reasons:
- Proprietary Know-How & Design Continuity The ICSS design, software configuration, control architecture, and technical associated documentation have been uniquely developed and partially implemented by BUK, and are specific to their proprietary systems, tooling, and engineering approach.
- Safety & Technical Risk Assumption : A change of supplier would require a third party to assume legal and technical liability to take over, reinterpret, and revalidate partially completed design and safety-critical systems, including Safety Integrity Level (SIL )-rated elements, which would introduce material technical and programme risk that cannot be mitigated by an alternative party
- System Incompatibility: The ICSS must seamlessly integrate with existing plant systems and previously installed components already delivered by BUK. Substituting the supplier at this stage introduces in incompatibility risks across hardware, software, interfaces and safety validation activities.
- Disproportionate Duplication & Rework: Replacement of BUK would lead to significant and wasteful rework, duplication of design assurance and testing, and potential invalidation of completed Factory Acceptance Testing (FAT) and statutory safety lifecycle deliverables.
- Operational Hardship: These impacts would create disproportionate technical and operational difficulties, particularly in relation to safety assurance, system integration, and commissioning of a nuclear-grade system integration and final commissioning of the facility. On this basis, UKAEA considers that:
- The proposed contract represents a partial continuation and completion of existing works by the original delivery party, and
- Changing supplier would result in incompatible outcomes void existing warranties/assurances and cause disproportionate technical difficulties in operation and maintenance. The proposed direct award is therefore justified in accordance with the Procurement Act 2023, Schedule 5, Clause 7 (a) and (b). In addition, due to the unique level of system integration, the proprietary nature of the partially completed design, and BUK’s ownership of detailed implementation knowledge, there is an absence of alternatives who can complete the works without significant risk to the facility’s safety case, delay, and substantial duplication of cost, further supporting reliance on Schedule 5 provisions.
How it was run
Official notice- Submission deadline
- —
Timeline
8 Sept 2026 → 17 Sept 2026 · 2 dates- Notice published48 days ago8 Sept 2026, 08:43 BST
- Standstill ends38 days ago17 Sept 2026, 23:59 BST
Notice history
3 events · 2 releases on Find a Tender · since 2 Jul 2026- Transparency notice published2 Jul 2026, 14:27 BSTUK5
- Contract award notice published8 Sept 2026, 08:43 BSTUK6
- Contract signature expected30 Sept 2026, 23:59 BSTscheduled
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| Bilfinger UK Limiited1 Oct 2026 – 25 Jan 2028 | £3,256,918 | 8 Sept 2026standstill to 17 Sept 2026 | Standstill |
Contracting authority & participating public bodies
Bidders & participating suppliers
1 commercial party on the notice- Bilfinger UK LimiitedAwarded supplier
Official documents & specifications (2)
Official links; attachments are not copiedNotices published for this procedure
- Contract award notice Contract award notice on Find a Tender
- Transparency notice Transparency notice on Find a Tender