Official UK procurement notice
CT0130 - External Cyclical Maintenance - Lot 1
Authority: Northern Ireland Housing Executive (Central government)·Consortium: 2 public authorities
What is being bought7 lots · detail below
Published requirement descriptionNIHE would like to procure suitable qualified Contractors to carry out external cyclical maintenance to properties throughout the Belfast and South Regions.
- Recurrence: A further competition for ECMs may be run prior to this contract finishing
CPV: Construction work · Construction work for multi-dwelling buildings and individual houses · Construction work for subsidised residential accommodation · Refurbishment work
Lots and requirements (7)Procurement structure
7 lots · all with a published value (£36,337,000 together) · evaluation weights differ by lotLot #1Belfast - North AreaAwardedRenewalPublished value£6,351,000
External cyclical maintenance works to NIHE properties in the North Belfast Area
Lot #2Belfast - West Area BAwardedRenewalPublished value£5,834,800
Lot #3South - Portadown AreaAwardedRenewalPublished value£5,220,000
Lot #4Belfast - West Area AAwardedRenewalPublished value£5,080,800
Lot #5South - Lurgan AreaAwardedRenewalPublished value£4,999,600
Lot #6Belfast - S + E Belfast + Lisburn AreaAwardedRenewalPublished value£4,709,600
Lot #7South - Banbridge AreaAwardedRenewalPublished value£4,141,200
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Lots publish different evaluation splits; there is no single procedure weighting.
| Lot | Price | Social value | Split |
|---|---|---|---|
| 1 · Belfast - North Area | 90% | 10% | |
| 2 · Belfast - West Area B | 90% | 10% | |
| 3 · South - Portadown Area | 90% | 10% | |
| 4 · Belfast - West Area A | 90% | 10% | |
| 5 · South - Lurgan Area | 90% | 10% | |
| 6 · Belfast - S + E Belfast + Lisburn Area | 90% | 10% | |
| 7 · South - Banbridge Area | 90% | 10% |
- Suitability
Please see contract documents for full details
- Economic & financial standing
Please see contract documents for full details
- Technical & professional ability
Please see contract documents for full details
- Price carries 90 points on every lot: a 10% discount moves about 9 points.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Yes · A further competition for ECMs may be run prior to this contract finishing
- First published
- 30 Oct 2023, 18:55 GMT
- Last source update
- 11 Dec 2025, 15:30 GMT
- Award evaluation window
- 29 Nov 2023 – …
- FTS notice number
2025/S 000-082127- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-041052Find a Tender
- Performance terms
Please see contract documents for full details
Publisher note: The value shown in section V.2.4 (Total value of the contract) represents the potential total value of the contract inclusive of the initial Contract period of 18 months plus a planned 6 month extension period (included in the contract when initially advertised), prior to any modification.
How it was run
Official notice- Submission deadline
- 29 Nov 2023, 15:00 GMT
- Submission channel
- {"electronicSubmission"}
- Accepted languages
- en
- Bids opened
- 29 Nov 2023, 15:30 GMT
Timeline
29 Nov 2023 → 11 Dec 2025 · 4 dates- Submission deadline29 Nov 2023, 15:00 GMT
- Bids opened29 Nov 2023, 15:30 GMT
- Bids must remain valid until27 May 2024, 23:59 BST
- Notice published317 days ago11 Dec 2025, 15:30 GMT
Notice history
2 events · 6 releases on Find a Tender · since 25 May 2024- Status changed to complete25 May 2024, 14:25 BST
- Buyer details updated11 Dec 2025, 15:30 GMT
Routine re-releases (6)
- 2025-12: 1 release · 11 Dec 2025
- 2024-05: 1 release · 25 May 2024
- 2023-10: 1 release · 30 Oct 2023
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| Lot 1 · Belfast - North Area4 awards | |||
| P.K. MURPHY CONSTRUCTION LTDSME | £5,363,420 † | — | Awarded |
| MASCOTT CONSTRUCTION EUROPE LTDSMEExternal Cyclical Maintenance Works | £6,923,112 † | — | Awarded |
| UNICO CONTRACTS LIMITEDSMEExternal Cyclical Maintenance | £6,744,762 † | — | Awarded |
| S+D Properrty Maintenance LtdSME, S+D Property Maintenance LtdSMEjoint awardExternal Cyclical Maintenance | £7,824,467 † | — | Awarded |
| Lot 2 · Belfast - West Area B1 award | |||
| SD Prpoerty Maintenance LTDSME | £5,216,311 † | — | Awarded |
| Lot 3 · South - Portadown Area1 award | |||
| Bann LtdSME | £4,894,272 † | — | Awarded |
| Lot 4 · Belfast - West Area A1 award | |||
| UNICO CONTRACTS LIMITEDSME | £4,496,508 † | — | Awarded |
| Lot 5 · South - Lurgan Area1 award | |||
| PETER O'HARE LTDSME | £5,599,552 † | — | Awarded |
| Lot 6 · Belfast - S + E Belfast + Lisburn Area1 award | |||
| MASCOTT CONSTRUCTION EUROPE LTDSME | £4,615,408 † | — | Awarded |
| Lot 7 · South - Banbridge Area1 award | |||
| HETHERINGTON PAINTING BUILDINGSME | £4,948,734 † | — | Awarded |
1 further award records carry no date or value.
Contracts
Lot 1 - Belfast - North Area · P.K. MURPHY CONSTRUCTION LTDSME
- Signed
- 20 May 2024
- Value
- £5,363,420
- Status
- active
Lot 2 - Belfast - West Area B · SD Prpoerty Maintenance LTDSME
- Signed
- 20 May 2024
- Value
- £5,216,311
- Status
- active
Lot 3 - South - Portadown Area · Bann LtdSME
- Signed
- 20 May 2024
- Value
- £4,894,272
- Status
- active
Lot 4 - Belfast - West Area A · UNICO CONTRACTS LIMITEDSME
- Signed
- 20 May 2024
- Value
- £4,496,508
- Status
- active
Lot 5 - South - Lurgan Area · PETER O'HARE LTDSME
- Signed
- 20 May 2024
- Value
- £5,599,552
- Status
- active
Lot 6 - Belfast - S + E Belfast + Lisburn Area · MASCOTT CONSTRUCTION EUROPE LTDSME
- Signed
- 20 May 2024
- Value
- £4,615,408
- Status
- active
Lot 7 - South - Banbridge Area · HETHERINGTON PAINTING BUILDINGSME
- Signed
- 20 May 2024
- Value
- £4,948,734
- Status
- active
External Cyclical Maintenance Works · MASCOTT CONSTRUCTION EUROPE LTDSME
- Signed
- 10 May 2024
- Value
- £6,923,112
- Status
- active
- Change The Housing Executive intends to modify this contract in line with regulation 72(1)(b) of the Public Contract Regulations 2015, to increase the spend on the contract and extend the period for a further 6 months. This represents an increase of up to £2,307,704 (approximately 50% of the value of the original contract). There no guarantee of any level of spend on the contract. This is intended to give time for additional work to be carried out by the same Contractor during the Contract period., Need for additional works, services or supplies by the original contractor/concessionaire: NIHE is currently developing a 5-year programme focused on the delivery of External Maintenance Works and is holding a market engagement event in January 2026. A significant investment of time and resources, for all parties, is required when procuring these contracts. It is not in the interest of the public purse to procure another round of short-term contracts. Doing so would result in significant inconvenience, and substantialdu plication of costs would be incurred in issuing another short-term tender The modification could enable us to develop a new strategy for ECM works and this will result in a new competition going to the market in early 2026.
External Cyclical Maintenance · UNICO CONTRACTS LIMITEDSME
- Signed
- 10 May 2024
- Value
- £6,744,762
- Status
- active
- Change The Housing Executive intends to modify this contract in line with regulation 72(1)(b) of the Public Contract Regulations 2015, to increase the spend on the contract and extend the period for a further 6 months. This represents an increase of up to £2,248,254 (approximately 50% of the value of the original contract). There no guarantee of any level of spend on the contract. This is intended to give time for additional work to be carried out by the same Contractor during the Contract perio, Need for additional works, services or supplies by the original contractor/concessionaire: NIHE is currently developing a 5-year programme focused on the delivery of External Maintenance Works and is holding a market engagement event in January 2026. A significant investment of time and resources, for all parties, is required when procuring these contracts. It is not in the interest of the public purse to procure another round of short-term contracts. Doing so would result in significant inconvenience, and substantial duplication of costs would be incurred in issuing another short-term tender. The modification could enable us to develop a new strategy for ECM works and this will result in a new competition going to the market in early 2026.
External Cyclical Maintenance · S+D Properrty Maintenance LtdSME, S+D Property Maintenance LtdSME
- Signed
- 10 May 2024
- Value
- £7,824,467
- Status
- active
- Change The Housing Executive intends to modify this contract in line with regulation 72(1)(b) of the Public Contract Regulations 2015, to increase the spend on the contract and extend the period for a further 6 months. This represents an increase of up to £2,608,155.60 (approximately 50% of the value of the original contract). There no guarantee of any level of spend on the contract.This is intended to give time for additional work to be carried out by the same Contractor during the Contract period., Need for additional works, services or supplies by the original contractor/concessionaire: NIHE is currently developing a 5-year programme focused on the delivery of External Maintenance Works and is holding a market engagement event in January 2026. A significant investment of time and resources, for all parties, is required when procuring these contracts. It is not in the interest of the public purse to procure another round of short-term contracts. Doing so would result in significant inconvenience, and substantial duplication of costs would be incurred in issuing another short-term tender The modification could enable us to develop a new strategy for ECM works and this will result in a new competition going to the market in early 2026.
External Cyclical Maintenance
- Signed
- 10 May 2024
- Value
- £8,045,129
- Status
- active
- Change The Housing Executive intends to modify this contract in line with regulation 72(1)(b) of the Public Contract Regulations 2015, to increase the spend on the contract and extend the period for a further 6 months. This represents an increase of up to £2,681,709.75 (approximately 50% of the value of the original contract). There no guarantee of any level of spend on the contract. This is intended to give time for additional work to be carried out by the same Contractor during the Contract period., Need for additional works, services or supplies by the original contractor/concessionaire: NIHE is currently developing a 5-year programme focused on the delivery of External Maintenance Works and is holding a market engagement event in January 2026. A significant investment of time and resources, for all parties, is required when procuring these contracts. It is not in the interest of the public purse to procure another round of short-term contracts. Doing so would result in significant inconvenience, and substantial duplication of costs would be incurred in issuing another short-term tender The modification could enable us to develop a new strategy for ECM works and this will result in a new competition going to the market in early 2026.
Bid statistics published by the authority
| Lot | Bids | SME | VCSE | Valid bid range |
|---|---|---|---|---|
| 1 · Belfast - North Area | 13bids · 13 electronic · 1 from abroad | 1 | — | — |
| 2 · Belfast - West Area B | 13bids · 13 electronic · 1 from abroad | 1 | — | — |
| 3 · South - Portadown Area | 13bids · 13 electronic · 1 from abroad | 1 | — | — |
| 4 · Belfast - West Area A | 13bids · 13 electronic · 1 from abroad | 1 | — | — |
| 5 · South - Lurgan Area | 13bids · 13 electronic · 1 from abroad | 1 | — | — |
| 6 · Belfast - S + E Belfast + Lisburn Area | 13bids · 13 electronic · 1 from abroad | 1 | — | — |
| 7 · South - Banbridge Area | 13bids · 13 electronic · 1 from abroad | 1 | — | — |
Contracting authority & participating public bodies
2 public bodies on the noticeDispute resolution & review bodies
- Royal Courts of JusticeReview body
Bidders & participating suppliers
13 commercial parties on the notice- BANN LTDAwarded supplier
- HETHERINGTON PAINTING BUILDINGAwarded supplier
- MASCOTT CONSTRUCTION EUROPE LTDAwarded supplier
- Mascott Construction Europe LtdAwarded supplier
- P.K. MURPHY CONSTRUCTION LTDAwarded supplier
- PETER O'HARE LTDAwarded supplier
- PK MurphyAwarded supplier
- PK Murphy Construction LtdAwarded supplier
- S+D Properrty Maintenance LtdAwarded supplier
- S+D Property Maintenance LtdAwarded supplier
Show 3 more suppliers
- SD Prpoerty Maintenance LTDAwarded supplier
- UNICO CONTRACTS LIMITEDAwarded supplier
- Unico Contracts LtdAwarded supplier
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.