Official UK procurement notice
Electricity & Underground Utilities Support Services Framework 2025
Authority: Natural Resources Wales (Public body)
What is being bought2 lots · detail below
Published requirement descriptionElectricity & Underground Utilities Support Services Framework 2025. Services to facilitate safe working practices when conducting operations within the proximity of overhead powerlines and undetground utilities in South Wales
- No preliminary market engagement: None carried out.
CPV: Electricity distribution and related services · Forestry services · Signage
How this framework works
From the published notice- Type
- Closed framework · open framework scheme (admission reopens)
- Call-offs
- call-offs are awarded directly to appointed suppliers, without further competition
- Places
- up to 4 suppliers · 3 bids on the busiest of 2 lots (0.8 per place) · 2 appointed
- Framework period
- 4 yrs · up to 4 yrs 6 mo from 31 Oct 2025
- Scheme runs until
- 8 Jan 2030
Published description of the framework
Ranking of suppliers
Pricing as per costing activity
Unit-Level Costing: This method assigns costs (materials, labor, and overhead) based on the volume of production, such as cost per item or per linear meter in some instance for this framework
Cost Drivers: In Activity-Based Costing (ABC), the "linear meter" or "individual item" acts as the cost driver (or unit of measurement) to allocate indirect costs to a product.
Calculation Method: Total cost (direct materials + labor + overhead) is divided by the number of units or total length (meters) to establish the rate.
Applications: It is essential for determining profitability, setting prices, and in construction or manufacturing (e.g., pipes, fabric, wiring).
This approach is crucial in Activity-Based Costing (ABC) for assigning overhead to products, and in marginal costing to determine the cost of producing one additional unit
- Electricity & Utilities Support Services – Overhead & Underground 2025 (Lot 1: North Wales) · Natural Resources Wales · 24 Feb 2026
- Electricity & Utilities Support Services – Overhead & Underground 2025 (Lot 2: South Wales) · Natural Resources Wales · 24 Feb 2026
Notices that name this framework as their framework in the official record. Many call-offs are never published, so this is a floor, not utilisation.
Lots and requirements (2)Procurement structure
2 lots · all with a published value · same evaluation weights on every lotEvery one of these 2 lots carries the same published figure, £500,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.
Lot #1North WalesAwardedRenewalceiling above
Services to facilitate safe working practices when conducting operations within the proximity of overhead power lines and underground utilities in North Wales.
Lot #2South WalesAwardedRenewalceiling above
Services to facilitate safe working practices when conducting operations within the proximity of overhead power lines and underground utilities in South Wales.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published award criteria (2)
- Quality
- Price
- Price carries 50 of 100 points: a 10% discount moves about 5 points. This one is won on the number: sharpen the price before polishing the prose.
- “Electricity & Underground Utilities Support Services Framework 2025” is a framework: the contest is a place on its panel, up to 4 suppliers, not a single contract, and call-offs are awarded directly: getting appointed is the whole game.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Services
- Notice status
- Awarded
- Procurement threshold
- Above threshold (FTS publication)
- Regulatory regime
- Standard
- Commercial structure
- Open framework scheme
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Unspecified in notice
- First published
- 12 Aug 2025, 08:57 BST
- Last source update
- 21 Jan 2026, 11:11 GMT
- Award evaluation window
- Submission end – 30 Sept 2025
- Authority reference
NRW 59932- FTS notice number
2025/S 000-047827- Latest notice
- Contract details notice (UK7)
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-05859bFind a Tender
How it was run
Official notice- Appointment period ends
- 15 Sept 2025, 17:00 BST
- Clarification deadline
- 2 Sept 2025, 17:00 BST
- Submission channel
- Official e-sourcing portal
- Electronic submission
- Allowed
- Accepted languages
- en, cy
INSTRUCTIONS FOR SUBMITTING AN EXPRESSION OF INTEREST/COMPLETING THE Invitation To Tender (ITT).
- Tenderers should register on the eTendering portal etenderwales.bravosolution.co.uk ↗
- Once registered, suppliers must express their interest as follows:
a. Login to the etendering portal.
b. On the Dashboard go to area for PQQs/ITTs open to all suppliers.
c. Click on the number next to ITT_119319
d. Click on the down arrow next to filter box and select ITT Descriptions
e. In operator box select “contains” and in the value box type title of contract or reference number and click on search
f. Click on 'Express Interest' button in the 'Actions' box on the left-hand side of the page.
- Once you have expressed your interest, the ITT_119319 will move to 'My ITTs', where you can download and where you can construct your reply as instructed.
- For any support in submitting your expression of interest, please contact the eTendering helpdesk on 08003684852 or at [email protected]
Timeline
12 Aug 2025 → 21 Jan 2026 · 8 dates- Tender notice published12 Aug 2025, 08:57 BST
- Clarification questions by2 Sept 2025, 17:00 BST
- Admission / appointment period endsperiod end, not a bid countdown15 Sept 2025, 17:00 BST
- Award decision expected by391 days ago30 Sept 2025, 23:59 BST
- Contract starts361 days ago31 Oct 2025
- Assessment summaries sent321 days ago10 Dec 2025
- Standstill ends306 days ago24 Dec 2025, 23:59 GMT
- Latest notice published278 days ago21 Jan 2026, 11:11 GMT
Notice history
5 events · 3 releases on Find a Tender · since 12 Aug 2025- Tender notice published12 Aug 2025, 08:57 BSTUK4
- Contract award notice published15 Dec 2025, 14:20 GMTUK6
- Status changed to complete15 Dec 2025, 14:20 GMT
- Contract signature expected5 Jan 2026, 23:59 GMTscheduled
- Contract details notice published21 Jan 2026, 11:11 GMTUK7
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast£500,000 is the framework's published maximum, restated by the publisher on 2 award rows. It is one ceiling, not 2 separate sums, and no share per lot is published; those rows read “ceiling above”.
| Awarded to | Value | Date | Status |
|---|---|---|---|
| Lot 1 · North Wales1 award | |||
| Forest Tree Surgery and Grounds Maintenance LimitedSME, Jones and Jones Contractors6 Jan 2026 – 5 Jan 2030 | ceiling above | 10 Dec 2025 | Awarded |
| Lot 2 · South Wales1 award | |||
| Forest Tree Surgery and Grounds Maintenance LimitedSME6 Jan 2026 – 5 Jan 2030 | ceiling above | 10 Dec 2025 | Awarded |
Contracts
All 2 of these contracts carry the same published figure, £500,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.
Electricity & Underground Utilities Services (North Wales) · Forest Tree Surgery and Grounds Maintenance LimitedSME, Jones and Jones Contractors
- Signed
- 7 Jan 2026
- Value
- ceiling above
- Period
- 9 Jan 2026 – 8 Jan 2030
- Status
- active
1 agreed KPI: Key performance indicators Electricity
- Key performance indicators Electricity
Electricity & Underground Utilities Services (South Wales) · Forest Tree Surgery and Grounds Maintenance LimitedSME
- Signed
- 7 Jan 2026
- Value
- ceiling above
- Period
- 9 Jan 2026 – 8 Jan 2030
- Status
- active
1 agreed KPI: KPI's Electricity Contract
- KPI's Electricity Contract
Bid statistics published by the authority
| Lot | Bids | SME | VCSE | Valid bid range |
|---|---|---|---|---|
| 1 · North Wales | 3final-stage tenders | 3 | 0 | — |
| 2 · South Wales | 2final-stage tenders | 2 | 0 | — |
Contracting authority & participating public bodies
Framework contractors & participating bidders
2 commercial parties on the notice- Forest Tree Surgery & Ground Maintenance Ltd.Framework contractor
- Jones and JonesFramework contractor
Official documents & specifications (7)
Official links; attachments are not copiedTender pack and attachments
- Signed contract NRW Framework order Jones&Jones
- Signed contract NRW Framework order Forest Tree
Notices published for this procedure
- Contract details notice Contract details notice on Find a Tender
- Contract details notice Contract details notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Tender notice Tender notice on Find a Tender