Official UK procurement notice
Electric Plant Storage · UK public procurement notice
Authority: Northern Powergrid Limited
What is being bought
Published requirement descriptionElectrical plant to be used on substation replacement projects needs to be temporarily stored following delivery from the manufacturer prior to installation. The requirement is for the safe and secure storage of all plant items in an undercover facility (warehouse). Storage, handling and movement of plant within the warehouse facility must meet Northern Powergrid’s safety requirements for both the equipment and staff. The warehouse facility must be secure and must as a minimum feature 24 hour CCTV, a monitored alarm system and access control.
A strict stock control system must be implemented and managed. Movement of the equipment within the unit and the loading/unloading of the equipment will be the responsibility of the warehouse facility.
Ideally two storage facilities are required, one to service the Yorkshire licence area and one to service to Northeast licence area. The facilities must be easily accessible and centrally located and ideally situated close to the A1, A19, M1 or M62 motorway corridors. Each facility must have a floor storage space of approx. 500m2 and have sufficient space for HGV’s to safety manoeuvre when delivering or picking up plant items. The plant must be stored such that access to all items is possible without the need to manoeuvre items; this is required to gain access for inspection and testing purposes. Some of the electrical plant items will contain oil, hence adequate precautions must be in place to prevent any environmental contamination. The facility must, as a minimum, have spill kits and temporary bunds available at all times and all staff must be adequately trained to deal with oil spillage/leaks.
CPV: Storage and warehousing services
The lotProcurement structure
single lot · no lot value publishedLot #1Ideally two storage facilities are required, one to service the Yorkshire licence area…Awarded
Ideally two storage facilities are required, one to service the Yorkshire licence area and one to service to Northeast licence area.
Ideally two storage facilities are required, one to service the Yorkshire licence area and one to service to Northeast licence area. The facilities must be easily accessible and centrally located and ideally situated close to the A1, A19, M1 or M62 motorway corridors.
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
- Procurement category
- Services
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Unspecified in notice
- First published
- 16 Sept 2021, 06:14 BST
- Last source update
- 16 Sept 2021, 06:14 BST
- Authority reference
NPg20005- FTS notice number
2021/S 000-023001- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-02e14cFind a Tender
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast1 further award records carry no date or value.
Contracts
Contract 023001-2021-NPg20005 - Electric Plant Storage-1 · supplier not published
- Signed
- 17 Aug 2021
- Value
- —
- Status
- active
Contracting authority & participating public bodies
Dispute resolution & review bodies
- Northern Powergrid Limited, Internal Audit DepartmentReview body
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.