Eastern Green Link 3, Scotland to Norfolk, England HVDC Link Project-Cables
Construction work
Construction work for electricity power lines
Electricity distribution and control apparatus
+3 more
UK
Published value
£2,500,000,000
Submission deadline 22 Jan 2024, 17:00 GMT
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: National Grid Electricity Transmission PLC: "Eastern Green Link 3, Scotland to Norfolk, England HVDC Link Project-Cables". Published status: active. Published value: £2,500,000,000. 1 published lot. Recorded submission deadline: 22 Jan 2024, 17:00 GMT. See the official notice for participation instructions.
| Contracting Authority | National Grid Electricity Transmission PLC | Scope & Categories | Not published | Submission Window | Closed 22 Jan 2024, 17:00 GMT |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | £2,500,000,000 |
Bidder Intelligence · Authority Profile: National Grid Electricity Transmission PLC
Market Analytics
Derived from OCDS awards & bid statistics
Published history for National Grid Electricity Transmission PLC. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Competition Density
Not availableNo published reports
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate availablePayment Terms
Check noticePublished terms
Coverage: 0 active published awards; 0 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityNational Grid Electricity Transmission PLC | Procedure methodNot published | Procurement categoryNot published |
Statusactive | Framework / DPSNot published | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published12 Dec 2023, 17:01 GMT | Last source update12 Dec 2023, 17:01 GMT | Recurring procurementNo |
ClassificationConstruction work, Construction work for electricity power lines, Electricity distribution and control apparatus, High-voltage cable, Installation of cable laying, Submarine cable | ||
Delivery area UK | ||
OCIDocds-h6vhtk-042513 | ||
What is being bought
National Grid Electricity Transmission PLC and Scottish Hydro Electric Transmission PLC (the "Employers") are jointly developing a HVDC link between the Netherton Hub, west of Peterhead, Scotland and Norfolk, England (the "HVDC Link"). This notice concerns the procurement and award of contract(s) for:
• Design, supply, manufacture, install, test and commission 525kV HVDC submarine and underground cable system, including but not limited to:
• extruded cable systems at along with all associated cable accessories
• HVDC submarine cable supply and complete installation including lay, jointing and burial. The submarine route length is expected to be in the range of 540 to 580km.
• HVDC onshore underground cable system supply, installation and associated civil engineering works as required that will link the Peterhead site in Scotland to the adjacent coast. The onshore route length of this element is approximately 10 km.
• AC cable circa 1km at Peterhead site in Scotland, 3-10km at Norfolk site.
• There is an option that it will be routed through a DCSS (DC Switching Station) also to be located within the Netherton Hub
• Design, supply but not install the cable that is to be routed onshore between the Lincolnshire coast and Norfolk, England. The onshore route length of this element is expected to be in the range of 90 to 135km. This cable will be installed onshore by others.
• Jointing of the onshore cable between Lincolnshire and Norfolk, the provision of installation instructions for use by the installation contractor and technical supervision of the onshore cable installation.
• Provision of cable spares and storage facilities for cable spares.
• Design, engineer, prepare, procure and install HDD (Horizontal Direct Drilling) ducts as required at the landfalls in both Scotland and England.
• Front-end engineering design services, in relation to any or all of the aforementioned scope.
• The Employers will require the Preferred Bidder to enter a Long-Term Service Agreement (LTSA) for the cable systems, either as part of the main contract or a standalone contract. This may be structured as an agreement with the Employers either acting jointly or as a Joint Venture, or as separate LTSAs with each Employer with regard to separate sections of the cable.
What changed
From the official release history
- Published value updated to £2,500,000,000
12 Dec 2023, 17:01 GMT - Status changed to active
12 Dec 2023, 17:01 GMT - Official notice release published
12 Dec 2023, 17:01 GMT - Submission deadline changed to 22 Jan 2024, 17:00 GMT
12 Dec 2023, 17:01 GMT - Buyer information updated
12 Dec 2023, 17:01 GMT
Lots and requirements (1)
Published by the contracting authority
- Lot 1 · #1Individual lot title not publishedactivePublished value£2,500,000,000Design, supply, manufacture, install, test and commission of 525kV HVDC submarine and underground cable system and HVDC onshore underground cable system supply, installation and associated civil engineering works as required that will link the Netherton Hub near Peterhead in Scotland to the adjacent coast. Design, supply but not install the cable that is to be routed onshore between the Lincolnshire coast and Norfolk, England. The scope of this Procurement includes the provision of two HVDC cable poles (underground and submarine cable) utilising 525kV extruded cable systems. L. Proposed cable systems (cables and accessories, including factory joints and transition joints) shall be type tested in accordance with Cigre Electra 189 and 171 before the award of the contract. With option of DCSS there would be the requirement for a three cable solution between the DCSS and local convertor (circa 1km). The cable shall be capable of delivering 2GW. The Employers reserve the right to take up to a maximum of four Suppliers through the prequalification process and into the tender process. Applicants are advised that, for the purpose of the contracts, the Employers may potentially enter into joint venture arrangements prior to awarding any contract from this activity. If this approach were to be adopted and, depending on the nature of the joint venture arrangements, the successful applicant(s) may be required to enter into a contract with a new JV entity relating to the execution of the works and services being procured. The Employers are considering the potential to award early works.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Procedure published
12 Dec 2023, 17:01 GMT - Submission deadline
22 Jan 2024, 17:00 GMT
Commercial outcome and competition
AwardsNo award published |
ContractsNo contract published |
Bid statisticsNo aggregate bid statistics published |
Buyer and organisations in this procedure
National Grid Electricity Transmission PLC
Contracting authority GB-FTS-100547Documents (2)