TenderlineUK
Procurement Intelligence
Official OCDS
Find a Tender
complete
Official procurement procedure

E Series pump modification kit from PVT10D to PVT10E design for Stabiliser system for the proposed duration – 28/03/2025 – 31/03/2026

No classification published
Location not published
Published value
Not published
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: Home Office: "E Series pump modification kit from PVT10D to PVT10E design for Stabiliser system for the proposed duration – 28/03/2025 – 31/03/2026". Published status: complete. Published value: Value not published. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
Contracting AuthorityHome OfficeScope & CategoriesNot publishedSubmission Window
complete
No deadline published
Submission GatewayDirect notice routeLegal Basis & RegimeStandard procurementEstimated Value (exc. VAT)Not published
Bidder Intelligence · Authority Profile: Home Office
Market Analytics
View Authority Profile →
Derived from OCDS awards & bid statistics
Published history for Home Office. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Requires at least 5 comparable procedures
Competition Density
5.3Bids / Report
0% of reports have one bid
Supplier ConcentrationHigh Concentration
KAINOS SOFTWARE LIMITEDTop vendor: 56.7% of attributable value
Payment Terms
Check noticePublished terms
Payment obligations depend on the applicable regime and contract. Consult the official documents.
Coverage: 140 active published awards; 3 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Historical Awarded Suppliers With This Authority:
Supplier NameHistoric AwardsAttributable GBP Value
KAINOS SOFTWARE LIMITED1 win£110,652,398
CIRRA - Clearsprings (Management) Limited & IRARA Secure Solutions Ltd1 win£63,968,042
Frequentis UK Limited1 win£11,147,119
Royal Mail Group Limited1 win£6,900,000
Bayliss Executive Travel Ltd1 win£1,706,000
Procedure terms
Contracting AuthorityHome Office
Procedure methodNot published
Procurement categoryNot published
Statuscomplete
Framework / DPSNot published
CompetitionNot published
Above thresholdNot published
Legal basisNot published
Tender period startsNot published
Clarification deadlineNot published
Electronic submissionNot published
Submission languagesNot published
Published10 Apr 2025, 10:01 BST
Last source update10 Apr 2025, 10:01 BST
Recurring procurementNot published
ClassificationNot published
Delivery areaLocation not published
OCIDocds-h6vhtk-050048
What is being bought
The current Naiad Stabiliser system onboard the Border Force 4207 patrol vessels are made up of a High Pressure Unit (HPU) with hydraulic pump, sea water cooling pump and 2 fins. The hydraulic pump circulates high pressure hydraulic oil to the fins which are mounted through the vessels hull underwater and reduces the rolling and rocking motion caused by waves, currents or wind. • The current hydraulic pumps used on the stabiliser system onboard the Damen 4207 Cutters have been made obsolete and all existing spares have been depleted, a replacement pump with modification kit is required that will bolt onto our existing Naiad system equipment to keep stabiliser function onboard the cutters and ensure safe operation of the system and vessel when at sea. • Naiad Dynamics is the original equipment manufacturer in the UK for the stabilizer control system and is in possession of the intellectual property and exclusive rights as OEM of the system used on the Damen 4207 Cutters. The services are not part of any catalogue, OGD framework or dynamic purchasing system. • The use of Naiad Dynamics is to assure the serviceability of crucial systems on board our Cutters. Due to the current operating model and levels of usage OEM parts, systems and sub-assemblies should be used to service BF Cutters when a break down occurs. As a result, warranty claims both retrospective and in the future, are a main factor in ensuring that these systems are afforded the most reactive and comprehensive support available that is assured. • Without the assured serviceability of these vessels, people and illicit goods may be successful in penetrating the coastline controls without being interdicted. Inability to deploy the vessel will significantly reduce the capability of BF Maritime Command to adequately protect the UK EEZ boundary. Introduction of a third-party suppliers would allow for technically unacceptable fluctuations in the standard of parts, labour and certification services required on these systems. If we did not use an OEM for this the reliability would drop and the likelihood of catastrophic failure would increase.
What changed
From the official release history
  1. Official notice release published
    10 Apr 2025, 10:01 BST
  2. Status changed to complete
    10 Apr 2025, 09:53 BST
  3. Official notice release published
    10 Apr 2025, 09:53 BST
  4. Buyer information updated
    10 Apr 2025, 09:53 BST
Lots and requirements (1)
Published by the contracting authority
  • Lot 1 · #1
    Individual lot title not published
    complete
    Published valueNot published
    The source published no individual title or description for this lot.
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
Timeline
  1. Procedure published
    10 Apr 2025, 10:01 BST
  2. Award active
    Not published · Not published
  3. Contract active
    Signed 9 Apr 2025, 00:00 BST · £18,029
Commercial outcome and competition
Awards
Naiad Dynamics
Not published · Not published · active
Contracts
Contract
£18,029 · signed 9 Apr 2025, 00:00 BST · active
Contract period: 10 Apr 2025, 00:00 BST31 Mar 2026, 23:59 BST
Bid statisticsNo aggregate bid statistics published
Buyer and organisations in this procedure

Home Office

Contracting authority GB-PPON-PWGC-6513-PQLZ
View buyer profile
Documents (0)
Official links; attachments are not copied
No data
No linked documents are published
Related procedures (0)
No data
No related procedures published