Digbeth (Tea Factory) - FIT OUT

Official notice

Authority: BBC (British Broadcasting Corporation) (Public body)

WorksCompetitive flexible procedureAbove thresholdSME suitable
Published estimate£10,400,000≈ £12m / year · £13,000,000 inc. VAT
Submissions closed 16 Jun 2025awarded 27 Oct 2025
Award (standstill) to Overbury Plc
Contract term 10 moends 30 Sept 2026 · starts 15 Dec 2025

What is being bought

Published requirement description

The requirement is summarised below:

The BBC are looking to appoint a contractor to carry out fit-out works at their new home at The Tea Factory in Digbeth. The BBC’s current home to its 650 staff is The Mailbox. Staff are expected to move from The Mailbox to The Tea Factory in 2027.

Stoford (with BAM) started redeveloping The Tea Factory from a derelict building to a Shell and Core office1 in January 2024. They are making good progress and expect to complete their works in late December 2025.

1 As part of the Shell and Core, Stoford and BAM are also building the walls and lids to the Technical Rooms (i.e., Studios, Edit Suites, etc).

The fit-out works are expected start on site date in early January 2026 and be completed by no later than the end of September 2026.

The fit-out is over four floors (Ground, 1, 2 and 3) with a plant area on the roof. The scope of fit-out works includes:

  • Finishes (including acoustics) to the Technical Rooms:

o 8x Radio Studios.

o 10x Edit Suites.

o 1x TV Studio.

o 1x TV Studio Gallery.

o 1x Lecture Theatre.

o 4x Apparatus Rooms.

  • Construction of Radio Drama Studio and Control Room including a ‘Dead Room’.
  • Construction of six meeting rooms with structural lids.
  • All M&E to the floor plates and all rooms / spaces.
  • Raised access floor.
  • Acoustic finishes.
  • Wall and floor finishes.
  • FF&E (excluding technical rooms).

Design of the works has been progressed to RIBA Stage 4 by BBC Workplace with support from the following consultants:

  • J4 Projects Project Managers
  • MGAC Cost Consultant
  • AWW Architects
  • IDSR Interior Designers
  • CMB MEP Design
  • Arup Structural Engineer
  • Ion Acoustics Acousticians

The works will be procured under the JCT 2024 D&B Contract.

The BBC does not intend to novate the designers to the contractor; however, it may be acceptable for the contractor to directly appoint the designers if they (a) deem it to be beneficial for the project and (b) can demonstrate that any associated risks (e.g., conflicts of interest) can be mitigated.

  • How the procedure runs: The BBC are looking to appoint a contractor to carry out fit -out works at their new home at The Tea Factory in Digbeth. The BBC’s current home to its 650 staff is The Mailbox. 2.6 The following is a very brief summary of the stages of this Procurement: 2.6.1 Conditions of Participation Stage: during this stage, the BBC will assess each supplier’s legal and financial capacity to perform the Contract and technical ability to perform the Contract. Suppliers must complete and submit a Request to Participate through the Portal. The BBC will assess and score each Request to Participate. The top-scoring suppliers will be shortlisted and invited to submit an Initial Tender. Suppliers who are not shortlisted will be eliminated from the Procurement. No tender or pricing information is submitted or evaluated during the Conditions of Participation Stage. Full details of this stage are set out in section 5 below. 2.6.2 Initial Tender Stage: only those suppliers who were shortlisted at the conclusion of the Conditions of Participation Stage will be invited to the Initial Tender Stage. During this stage, Suppliers will prepare and submit their Initial Tenders. The BBC will evaluate these and provide feedback to the Suppliers. Full details of this stage are set out in the Draft ITT. 2.6.3 Final Stage: during this stage, Suppliers will be invited to participate in certain activities before submitting a Final Tender. The BBC will evaluate these and provide feedback to the Suppliers. The top-scoring Supplier[s] will be awarded the Contract. Outline details of this stage are set out in the Draft ITT. The fit-out works are expected start on site date in early January 2026 and be completed by no later than the end of September 2026.

CPV: Building alteration work

The lotProcurement structure

single lot · value published
Lot #1Awarded 10 moSMEPublished value£10,400,000
Contract period: 15 Dec 2025 – 30 Sept 2026 (10 mo)Value: £10,400,000 exc. VAT · £13,000,000 inc. VAT
Delivery: West MidlandsEligibility: SME eligible
Second stage: 3–4 candidates invited to tender
Pre-qualification & selection criteria (PQQ)3
  • Economic & financial standing

    See tender documents

  • Technical & professional ability

    See tender documents

  • Condition of participation

    See tender documents

    shortlisting

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
Quality: 70%Price: 30%
Published sub-criteria (2)
  • quality: 70%
  • Cost: 30%
Published award criteria (2)
  • quality
  • Cost
Conditions of participation3
  • Economic & financial standing

    See tender documents

  • Technical & professional ability

    See tender documents

  • Condition of participation

    See tender documents

    shortlisting
What this means for your bid
  • Price carries 30 of 100 points: a 10% discount moves about 3 points. The method statement decides this lot, not the discount.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Competitive flexible procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Works
Notice status
Awarded
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA, CPTPP)
Recurring procurement
Unspecified in notice
First published
16 May 2025, 17:38 BST
Last source update
30 Oct 2025, 15:24 GMT
Award evaluation window
Submission end – 11 Jul 2025
FTS notice number
2025/S 000-022397
Latest notice
Contract award notice (UK6)
Classification (CPV)
Building alteration work
Delivery area
West Midlands (UKG31)
Official registry OCID
ocds-h6vhtk-051657 Find a Tender
Contract terms summary

See tender documents

How it runs

The BBC are looking to appoint a contractor to carry out fit

-out works at their new home at

The Tea Factory in Digbeth. The BBC’s current home to its 650 staff is The Mailbox.

2.6 The following is a very brief summary of the stages of this Procurement:

2.6.1 Conditions of Participation Stage: during this stage, the BBC will assess each supplier’s legal and financial capacity to perform the Contract and technical ability to perform the Contract. Suppliers must complete and submit a Request to Participate through the Portal. The BBC will assess and score each Request to Participate. The top-scoring suppliers will be shortlisted and invited to submit an Initial Tender. Suppliers who are not shortlisted will be eliminated from the Procurement. No tender or pricing information is submitted or evaluated during the Conditions of Participation Stage. Full details of this stage are set out in section 5 below.

2.6.2 Initial Tender Stage: only those suppliers who were shortlisted at the conclusion of the Conditions of Participation Stage will be invited to the Initial Tender Stage. During this stage, Suppliers will prepare and submit their Initial Tenders. The BBC will evaluate these and provide feedback to the Suppliers. Full details of this stage are set out in the Draft ITT.

2.6.3 Final Stage: during this stage, Suppliers will be invited to participate in certain activities before submitting a Final Tender. The BBC will evaluate these and provide feedback to the Suppliers. The top-scoring Supplier[s] will be awarded the Contract. Outline details of this stage are set out in the Draft ITT.

The fit-out works are expected start on site date in early January 2026 and be completed by no later than the end of September 2026.

Review and risk notes
Risks

See tender documents

How it was run

Official notice
Run through: Jaggaer · Who buys & how to bid on JAGGAER
Supplier login requiredElectronic submission allowedLanguage: EN
Access & registration note: Free; latest Chrome/Edge/Firefox only — corporate browsers fail
Requests to participate (first stage)
16 Jun 2025, 14:00 BST
Submission deadline
16 Jun 2025, 14:00 BST
Clarification deadline
9 Jun 2025, 14:00 BST
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Timeline

16 May 2025 → 15 Dec 2025 · 8 dates
  1. Tender notice published
    16 May 2025, 17:38 BST
  2. Clarification questions by
    9 Jun 2025, 14:00 BST
  3. Submission deadline
    16 Jun 2025, 14:00 BST
  4. Award decision expected by
    11 Jul 2025, 23:59 BST
  5. Assessment summaries sent362 days ago
    27 Oct 2025
  6. Latest notice published358 days ago
    30 Oct 2025, 15:24 GMT
  7. Standstill ends347 days ago
    10 Nov 2025, 23:59 GMT
  8. Contract starts313 days ago
    15 Dec 2025

Notice history

4 events · 2 releases on Find a Tender · since 16 May 2025
  1. Tender notice published
    16 May 2025, 17:38 BST
    UK4
  2. Contract award notice published
    30 Oct 2025, 15:24 GMT
    UK6
  3. Status changed to complete
    30 Oct 2025, 15:24 GMT
  4. Contract signature expected
    30 Nov 2025, 23:59 GMT
    scheduled

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 1
Awarded value £10,400,0001 award exc. VAT
Bids received 21 from SMEs
Named bidders 2published on the award notice
Awarded toValueDateStatus
Overbury Plc15 Dec 2025 – 30 Sept 2026£10,400,00027 Oct 2025standstill to 10 Nov 2025Standstill

Bid statistics published by the authority

BidsSMEVCSEValid bid range
2final-stage tenders10—

Who bid

Bidders as named on the Procurement Act 2023 award notice. “Won” means the bidder holds an award on this notice.

Contracting authority & participating public bodies

BBC (British Broadcasting Corporation)

Contracting authorityPublic authority - sub-central government GB-PPON: PJRB-3233-GTQL Broadcasting House, Portland Place, London, London, W1A 1AAContact name, email

Bidders & participating suppliers

2 commercial parties on the notice · 1 awarded
  • Heydon & Carr LtdBidder / tendererGB-COH: 06217178 104 High Street, London Colney, East of England, AL2 1QL
  • Overbury PlcAwarded supplierGB-COH: 00836946 77 Newman Street London, London, London, W1T 3EWContact email

Official documents & specifications (3)

Official links; attachments are not copied

Tender pack and attachments

  • Bidding documents and specificationstenderBidding documents and specificationsAccess: AS PART OF THIS UK COMPETITIVE FLEXIBLE PROCEDURE – WITH SEPARATE PARTICIPATION STAGE , THE INVITATION TO TENDER FOR A FIT-OUT CONTRACTOR FOR THE TEA FACTORY, DIGEBTH WILL BE ISSUED ON 11TH JUSLY 2025

Notices published for this procedure

  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender