DfI TRAM T-1145 Framework Contract for Surfacing Framework A
Authority: Department for Infrastructure - Transport and Road Asset Management TRAM (Central government)·Consortium: 2 public authorities
What is being bought6 lots · detail below
Published requirement descriptionRAM Surfacing Framework A will deliver Works through Call-Off Contracts for all lots under the Framework. These works may include but are not limited to: laying carriageway asphalt surfacing; delivery of two or more concurrent resurfacing schemes on a public road; reshaping of carriageways; delivery of Temporary Traffic Management; adjustment of street furniture to new levels; adjustment and/or provision of kerb lines; adjustment and/or provision of carriageway drainage systems; provision of road markings and studs. The Framework will comprise of five area Lots (delivering multiple Works Orders each valued between £50k to £750k) and a Project Lot (delivering projects valued between £750k and £5m in all areas). The five area lots are: Mid and East Antrim; Newry and Mourne; Cookstown and Magherafelt; Omagh; and Belfast North.
CPV: Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork · Works for complete or part construction and civil engineering work
How this framework works
From the published notice- Places
- up to 50 suppliers · 7 bids on the busiest of 6 lots (0.1 per place) · 7 appointed
Lots and requirements (6)Procurement structure
6 lots · all with a published value · a supplier may bid for at most 6 and win at most 3 of them · same evaluation weights on every lotLot #1SFA P1 Projects LotAwardedRenewalPublished value£30,000,000
Lot #2SFA N1 Mid and East AntrimAwardedRenewalPublished value£48,500,000
Lot #3SFA S1 Newry and MourneAwardedRenewalPublished value£47,500,000
Lot #4SFA W1 Cookstown and MagherafeltAwardedRenewalPublished value£46,500,000
Lot #5SFA W2 OmaghAwardedPublished value£42,500,000
Lot #6SFA E1 Belfast NorthAwardedRenewalPublished value£27,500,000
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (2)
- 30: 30%
- 70: 70%
Published award criteria (2)
- 30
- 70
- Price carries 70 of 100 points: a 10% discount moves about 7 points. This one is won on the number: sharpen the price before polishing the prose.
- “DfI TRAM T-1145 Framework Contract for Surfacing Framework A” is a framework: the contest is a place on its panel, up to 50 suppliers, not a single contract.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Yes
- First published
- 7 Nov 2024, 12:29 GMT
- Last source update
- 5 Jun 2025, 15:07 BST
- Award evaluation window
- 20 Jan 2025 – …
- FTS notice number
2025/S 000-030314- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-04b4a6Find a Tender
- Review procedure
DfI will comply with the Public Contracts Regulations 2015 (as amended) and, where appropriate, will incorporate a standstill period (i.e. a minimum of 10 calendar days) at the point information on the award of contract is communicated to tenderers. That notification will provide full information on the award decision. This provides time for the unsuccessful tenderers to challenge the award decision before the contract is entered into.
Publisher note: In March 2023, the Department for Infrastructure (DfI) published the Procurement Enhancement Programme procurement strategy, developed to provide an efficient and value for money procurement route for the delivery of road asset maintenance across Northern Ireland. A key output of this strategy is the introduction of a suite of eleven Road Asset Management (RAM) Frameworks covering all roads maintenance and improvement works valued at up to £5 million. ---------------------------------------------------------------------------------------------------------------------------------------. . Four Surfacing Frameworks (A, B, C and D) have been developed by DfI to ensure the effective, efficient, and reliable delivery of road surfacing schemes across the Northern Ireland public road network. Each framework will last four years, covering surfacing requirements across a specified set of geographical areas and provide an opportunity for suppliers that have the capacity and appetite to deliver all types of surfacing schemes valued from £50k up to £5m. Each Framework will be divided into Lots in accordance with Regulation 46 of the Public Contract Regulations 2015. This arrangement has been adopted in order to ensure security of service delivery, preserve competition and encourage participation by SMEs. One surfacing framework is expected to be released every year. There will be restrictions on the number of Lots that an individual supplier can be awarded, both within and across the surfacing frameworks, full details of which will be set out in the procurement documents. ---------------------------------------------------------------------------------------------------------------------------------------. . Under Surfacing Framework A (this procurement), there are a total of six Lots. There is one Lot (Lot 1) covering all surfacing schemes valued from £750k to £5m across the geographical area covered by the Framework. Multiple suppliers will be appointed to this Lot. Call-Off Contracts awarded under Lot 1 are intended to be awarded following mini-competitions. There are five Lots (Lots 2 to 6) each covering all surfacing schemes valued from £50k to £750k which are to be delivered within a defined geographical area. It is intended that a Primary Supplier will be appointed to each of Lots 2 to 6 and following Framework award the Primary Supplier will be awarded a Measured Term Contract (MTC) Call-Off Contract. Subject to performance, it is intended that all Works Orders for schemes valued from £50k to £750k within the Lot contract area will be placed with the Primary Supplier via the MTC Call-Off Contract. For each of Lots 2 to 6, a Reserve Supplier will also be appointed to provide delivery resilience, in line with procedures set out in the Framework. ---------------------------------------------------------------------------------------------------------------------------------------. . Suppliers that are interested in this Surfacing Framework will be required to tender for Lot 1 and at least one of Lots 2 to 6. The number of MTC Lots a single Economic Operator may be awarded under this Framework shall not exceed: (i) Primary Supplier - two MTC Lots out of five and (ii) Primary and Reserve Supplier (Combined) - four MTC Lots out of five. In addition to these competition specific limits, there will be limits on the number of Primary Supplier Lots that can be awarded to any one Economic Operator when assessed across all Surfacing Frameworks (A-D). The maximum number of Lots that a Single Economic Operator may be awarded in any one TRAM Division is one less than the total Lots contained in that Division. The maximum number of Lots to which an Economic Operator can be appointed as Primary Supplier across all four Surfacing Frameworks (A-D) cumulatively, is five out of seventeen. ---------------------------------------------------------------------------------------------------------------------------------------. . Further information on DfI's Procurement Enhancement Programme and Road Asset Management Frameworks can be found in the document titled RAM FRAMEWORKS - PROCUREMENT ESSENTIALS at the following link: https://www.infrastructure-ni.gov.uk/publications/department-infrastructure-roads-works-and-maintenance-procurement-enhancement-programme--------------------------------------------------------------------------------------------------------------------------------------. . The Contracting. Authority considers that this framework may be suitable for economic operators that are Small or Medium Enterprises. (SMEs). The. evaluation of submissions will be based solely on the criteria set out for the procurement, and the contract will be. awarded on the basis stated in II.2.5). All documents will only be available on line through the eTendersNI portal: (1) If your company is. not already registered on eTendersNI you may do so through the eTendersNI portal https://etendersni.gov.uk/epps/. home.do — Select. the “Register as a Supplier” link and follow the on screen instructions. 2) Expression of Interest and access to tender documentation You may “Express an Interest” in a project and access the tender documentation via the projects CfT Menu. If you require assistance. or help to navigate the site please consult the on-line help, or contact the eTendersNI help desk. The documents may be downloaded up to the closing date and time for the submission. Submissions must be completed and returned to the Contracting Authority using. the online eTendersNI portal, to arrive not later than the time and date as stated in IV.2.2). The Contracting Authority is utilising an. electronic tendering system to manage this procurement and to communicate with Economic Operators. Accordingly, it is intended that all communications with the Contracting Authority, including the accessing and submission of tender responses, will be conducted via eTendersNI. ---------------------------------------------------------------------------------------------------------------------------------------. . . Poor Performance, as part of its contract management procedures: the Contracting Authority and their CoPE will use the Protocol for Managing Poor Supplier. Performance contained in the Procurement documentation. The protocol sets out a series of five escalating stages to enable Contracting. Authorities and their CoPEs to manage poor performance by suppliers. At Stage 4, as an alternative to terminating the contract, senior. management in the Contracting Authority/CoPE can issue a Notice of Written Warning. At Stage 5, as an alternative to terminating the. contract, a notice of unsatisfactory performance can be issued to the Economic Operator. These notices remain current for the period of. time stated in the protocol and an Economic Operator must declare, in subsequent procurement competitions, if it has received a current. Notice of Written Warning or a current Notice of Unsatisfactory Performance within 3 years of the TP Submission Deadline. If an Economic. Operator has received more than one current Notice of Written Warning the Contracting Authority/CoPE, at its discretion, can consider. an Economic Operator’s exclusion from future procurement competitions, being undertaken on behalf of bodies covered by the Northern. Ireland Public Procurement Policy, for a minimum period of 12 months. If an Economic Operator is subject to a notice of unsatisfactory. performance the Contracting Authority/CoPE, at its discretion, can consider the Economic Operator’s exclusion from future procurement. competitions, being undertaken on behalf of bodies covered by the Northern Ireland Public Procurement Policy, for a period of 3 years.List of public bodies to which NI public procurement policy applies Department of Finance (finance-ni.gov.uk).
How it was run
Official notice- Appointment period ends
- 31 Jan 2025, 15:00 GMT
- Submission channel
- {"electronicSubmission","written"}
- Accepted languages
- en
- Bids opened
- 20 Jan 2025, 15:30 GMT
Timeline
20 Nov 2024 → 5 Jun 2025 · 5 dates- Next notice expected20 Nov 2024
- Bids opened20 Jan 2025, 15:30 GMT
- Admission / appointment period endsperiod end, not a bid countdown31 Jan 2025, 15:00 GMT
- Bids must remain valid until20 May 2025, 23:59 BST
- Notice published5 Jun 2025, 15:07 BST
Notice history
7 events · 6 releases on Find a Tender · since 26 Nov 2024- Published value published: £242,500,00026 Nov 2024, 16:04 GMT
- Status changed to active26 Nov 2024, 16:04 GMT
- Procurement method changed26 Nov 2024, 16:04 GMT
- Deadline published: 20 Jan 2025, 15:00 GMT26 Nov 2024, 16:04 GMT
- Deadline moved to 31 Jan 2025, 15:00 GMT14 Jan 2025, 10:09 GMT+11 days · was 20 Jan 2025, 15:00 GMT
- Status changed to complete5 Jun 2025, 15:07 BST
- Buyer details updated5 Jun 2025, 15:07 BST
Published amendments (3 · 3 deadline changes)
| When | What | Before | After | Shift |
|---|---|---|---|---|
| — | DeadlineIV.2.2) | 20 Jan 2025 | 31 Jan 2025 | +11 d |
| — | Bid openingIV.2.7) | 20 Jan 2025 | 31 Jan 2025 | +11 d |
| — | Bid validityIV.2.6) | 20 May 2025 | 31 May 2025 | +11 d |
| — | DeadlineIV.2.2) | 20 Jan 2025 | 4 Feb 2025 | +15 d |
| — | Bid validityIV.2.6) | 20 Jan 2025 | 4 Feb 2025 | +15 d |
| — | Bid openingIV.2.7) | 20 Jan 2025 | 4 Feb 2025 | +15 d |
| — | DeadlineIV.2.2) | 20 Jan 2025 | 11 Feb 2025 | +22 d |
| — | Bid validityIV.2.6) | 20 May 2025 | 11 Jun 2025 | +22 d |
| — | Bid openingIV.2.7) | 20 Jan 2025 | 11 Feb 2025 | +22 d |
3 amendments published without a description.
Routine re-releases (6)
- 2025-01: 1 release · 14 Jan 2025
- 2024-11: 2 releases · 7 Nov 2024, 26 Nov 2024
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast6 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
SFA P1 (Projects Lot)
- Signed
- 30 Apr 2025
- Value
- £30,000,000
- Status
- active
SFA N1 (Mid and East Antrim)
- Signed
- 30 Apr 2025
- Value
- £48,500,000
- Status
- active
SFA S1 (Newry and Mourne)
- Signed
- 30 Apr 2025
- Value
- £47,500,000
- Status
- active
SFA W1 (Cookstown and Magherafelt)
- Signed
- 30 Apr 2025
- Value
- £46,500,000
- Status
- active
SFA W2 (Omagh)
- Signed
- 30 Apr 2025
- Value
- £42,500,000
- Status
- active
SFA E1 (Belfast North)
- Signed
- 30 Apr 2025
- Value
- £27,500,000
- Status
- active
Bid statistics published by the authority
| Lot | Bids | SME | VCSE | Valid bid range |
|---|---|---|---|---|
| 1 · SFA P1 Projects Lot | 7bids · 7 electronic · 7 from abroad | 6 | — | — |
| 2 · SFA N1 Mid and East Antrim | 5bids · 5 electronic · 5 from abroad | 2 | — | — |
| 3 · SFA S1 Newry and Mourne | 7bids · 7 electronic · 7 from abroad | 4 | — | — |
| 4 · SFA W1 Cookstown and Magherafelt | 6bids · 6 electronic · 6 from abroad | 3 | — | — |
| 5 · SFA W2 Omagh | 6bids · 6 electronic · 6 from abroad | 3 | — | — |
| 6 · SFA E1 Belfast North | 5bids · 5 electronic · 5 from abroad | 2 | — | — |
Contracting authority & participating public bodies
2 public bodies on the noticeConsortium members and other public bodies
- Department for InfrastructureContracting authorityMinistry or any other national or federal authority, including their regional or local subdivisionsGeneral public services
Dispute resolution & review bodies
- High Court, Royal Courts of JusticeReview body
- The High CourtReview body
Framework contractors & participating bidders
7 commercial parties on the notice- FP McCannFramework contractor
- GIBSON QUARRIES BANBRIDGE LIMITEDFramework contractor
- JOHN MCQUILLAN CONTRACTS LTDFramework contractor
- Northstone Materials LimitedFramework contractor
- PATRICK KEENANFramework contractor
- TULLYRAINE QUARRIES LTDFramework contractor
- WHITEMOUNTAIN QUARRIES LTD t/a BREEDONFramework contractor
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria