Development Partner for Shrub Hill Quarter, Worcester

Buyer: Worcestershire County Council →

Participate on in-tendorganiser.co.uk ↗External submission platform

BuyerWorcestershire County Council
StatusClosed
Deadline13 Mar 2025
Value£80,000,000
Published11 Feb 2025

What is being bought

Worcestershire County Council (''WCC'') is seeking to procure a Development Partner for part of the Shrub Hill Quarter, an area which extends from Shrub Hill Station to the city centre. The proposed development of Shrub Hill Quarter (of which this opportunity comprises part) has the potential to become one of the largest regeneration initiatives in the region, offering a unique opportunity to transform a significant part of Worcester, close to the city centre, and create an exemplary mixed-use neighbourhood. There is potential that the rail station at Shrub Hill will benefit from future signalling upgrades, which will significantly improve the city's connectivity and accessibility. Over the past few years, WCC has begun to unlock long-term opportunities by developing a concept masterplan, the Shrub Hill Spatial Blueprint, and securing funding to aid with the demolition and redevelopment of key components of Phase 1. A range of technical due diligence has already been undertaken across the land assets that WCC own, which comprise the whole of Phase 1. A Shrub Hill Supplementary Planning Document (SPD) is also due to be adopted shortly. This work has been undertaken with the support of key public sector partners, including Worcester City Council and London and Continental Railways (LCR). WCC are looking forward to working with the selected partner to secure the successful delivery of the vision as follows: "With transformed national connectivity and inspiring heritage, Shrub Hill will become a vibrant new community and destination for Worcester. It will be a home for enterprise, ideas, and experiences; a place which is recognised for sustainable and innovative forms of living, working and relaxing, and which is driven by local energy & participation. Supporting City and County investment and growth aspirations, it will become established as an exemplar for successful and inspiring urban renewal and investment". The vision and overarching ambitions for the Shrub Hill Quarter are described in more detail within the Shrub Hill Quarter Vision document which was jointly created by Worcestershire County Council and Worcester City Council and endorsed by the Worcestershire Local Enterprise Partnership. Preliminary studies suggest that in the next 20 years the area could provide: - Up to 5,000 jobs - 500 + homes - A new gateway to Worcester City Centre - 2 hectares of new public space. The Quarter will be an extension of the city centre and provide excellent local, regional and national connections. The employment element will co-exist with new homes, concentrating around a re-energised canal and high quality public realm. The Quarter will develop along a main green spine which will connect Shrub Hill Station to the city and this will be supported by a series of new pedestrian and cycle links through the area. The layout of the Quarter will be generated from movement routes and view corridors with a particular focus on using the area's heritage (canal and built form) to establish character and reinforce wayfinding. Illustrative masterplan example for entire vision area: Residential approx. 37,000 sq m (398,265 sq ft) Commercial approx. 87,500 sq m (941,842 sq ft) Residential parking approx. 140 Commercial parking approx. 380 Following Cabinet approval in March 2024, supported by Soft Market Testing in August 2023 and August 2024, WCC now intends to formally procure a development partner to take forward the development of WCC's land in the Shrub Hill Quarter. A Descriptive Document is made available that sets out the principal objectives and the requirements of the Competitive Dialogue procurement process, alongside a summary of the key components of the opportunity. NB The estimated total value included in II.1.5 is further clarified as being the Phase 1 Indicative GDV which is estimated at £80m - £90m.

Delivery location

UKG12

Categories

Site-development work 45111291

Lot details

Lot 1

The Shrub Hill Quarter Vision area within WCC's ownership is the extent of the contracted area within which WCC would like to engage with the Development Partner. Noting however that WCC also wishes to work with the Development partner to unlock delivery of the wider vision area. Phase 1 comprises of all the land owned by WCC and will be the principal focus for the Development Partner in the early stages. This includes Lower Yard and Upper Yard. Alongside the delivery of Phase 1, WCC wish to work collaboratively with the Development Partner, and other public sector partners where appropriate, to unlock and deliver critical assets which are collectively considered essential to bring forward as subsequent phases of the wider vision. Within the vision area, there will also be a need to consider the public realm, pedestrian and cyclists routes, maximising canal accessibility and car parking to provide the underlying infrastructure and connectivity to support regeneration and its linkages with the city centre. WCC's commitment to the Shrub Hill Quarter regeneration is driven by the following objectives: - For WCC's assets to unlock the delivery of the vision for Phase 1 of the Shrub Hill Quarter, which maximises on the potential for growth and enhanced connectivity in the future. - To benefit from long term, sustainable investment return opportunities in and around the Shrub Hill Station area, maximising on opportunities for value capture from the Project which can be reinvested. - To deliver on the placemaking, economic and regeneration ambitions and outputs of the Shrub Hill Quarter as set out in the SPD and Shrub Hill Quarter Vision document. - To ensure best value and achievement of value for money outcomes for WCC in relation to their landholdings. In terms of Partnering structure, WCC are seeking to appoint a Master Developer to work collaboratively with them to unlock the delivery of the Shrub Hill Quarter vision. Pursuant to a Development Agreement for Lease and Development Leases, the parties will have defined roles and responsibilities to unlock a phased delivery and drawdown of the site with a share on the commercial return, after costs, either as land receipt and/or surplus profit. The partnering arrangement will be via a Development Agreement for Lease allowing for the draw down of development leases. The contractual arrangements will approach the opportunity in three stages: Part 1 - The first part will deal with the requirements to drawdown the land/assets within Phase 1 that can deliver an early phase of development within the specified requirements set out in funding parameters already secured. Part 2 - The second part will deal with further developing the Vision for the whole of Phase 1, to include master planning, a planning application process for Phase 1 and, subject to achieving an acceptable planning permission, the subsequent phased delivery of development. Part 3 - The third part will be to work collaboratively with WCC (and other partners where appropriate) to unlock wider assets and infrastructure that could support the delivery of the wider Vision. Additional information: NB The estimated total value included in II.2.6 is further clarified as being the Phase 1 Indicative GDV which is estimated at £80m - £90m.

Statusactive
Value£80,000,000

Award criteria
Quality / Weighting — 65
Cost / Weighting — 35

What is included

ItemCategoryQuantity
1Not publishedNot published

Comparable-procurement analytics

Benchmarked against retained Find a Tender procedures with CPV division 45. The category anchor is Site-development work (45111291); this is a deliberately broad market comparator. The comparison is shown at several levels rather than pretending one company or region is always the best benchmark.

Comparison setProceduresReported bids per procedureNamed award suppliersPrice evidence
Market: CPV division 4517,1274 median · 30.2 average (5,652 of 17,127 with a bid count)3.8 average (6,245 of 17,127 with named award suppliers)Not published
Same buyer0Not publishedNot publishedNot published
Delivery region: UKG12463 median · 121.1 average (17 of 46 with a bid count)3.9 average (17 of 46 with named award suppliers)Not published
Similar published value (0.5×–2×)6523 median · 68.1 average (9 of 652 with a bid count)6.9 average (9 of 652 with named award suppliers)Not published

“Reported bids” is an official aggregate, sometimes reported per lot; it is the closest available competition measure. “Named award suppliers” are winners, not all applicants.

Price-outcome signal

Not enough comparable procedures currently publish both a GBP tender value and a usable lowest-valid-bid value to calculate a responsible price-reduction benchmark. Tenderline deliberately does not infer a saving from named award suppliers or from missing award values.

Procurement strategy & market signals

Framework agreementNot published
Dynamic purchasing systemNot published
Competitive procurementNot published
Recurring requirementNo
Procurement method rationaleNot published
Rationale classificationsNot published
Special regimeNot published
Covered byGPA
Submission policyNot published
Selection criteriasuitability
Risk detailsNot published

Planning & early market engagement

BudgetNot published
No-engagement rationaleNot published
Planning documents0
Planning milestones0

No planning milestones published.

Related procurements

No linked framework, prior procurement or reprocurement published.

Documents & submission route

  • economicSelectionCriteria
  • technicalSelectionCriteria

Source data inventory

Diagnostic view. “Not published” means this current release does not provide a value.

OCIDocds-h6vhtk-04dd92
Latest release ID004500-2025
Latest release timestampTue Feb 11 2025 11:08:10 GMT+0000 (Coordinated Universal Time)
Sourcefind-a-tender
Official notice URLNot published
Tender statusactive
Procurement methodselective
Procurement method detailsCompetitive dialogue
Main procurement categoryworks
Above thresholdNot published
Legal basis32014L0024
Tender period: startNot published
Tender period: end2025-03-13T12:00:00Z
Expression of interest deadlineNot published
Enquiry deadlineNot published
Award period: startNot published
Award period: endNot published
Submission method detailshttps://www.in-tendorganiser.co.uk/worcestershire
Submission languagesen
Electronic catalogue policyNot published
Total tender value£80,000,000
Tender lots in source1
Tender items in source1
Tender documents in source2
Awards in latest release0
Contracts in latest release0
Parties in latest release2

Notice history

DateEventReference
11 Feb 2025tender004500-2025

All source data

Unmodified official OCDS data retained by Tenderline for this procurement process.

Complete current OCDS release JSON
{
  "id": "004500-2025",
  "tag": [
    "tender"
  ],
  "date": "2025-02-11T11:08:10Z",
  "ocid": "ocds-h6vhtk-04dd92",
  "buyer": {
    "id": "GB-FTS-137527",
    "name": "Worcestershire County Council"
  },
  "tender": {
    "id": "ocds-h6vhtk-04dd92",
    "lots": [
      {
        "id": "1",
        "value": {
          "amount": 80000000,
          "currency": "GBP"
        },
        "status": "active",
        "hasOptions": false,
        "hasRenewal": false,
        "description": "The Shrub Hill Quarter Vision area within WCC's ownership is the extent of the contracted area within which WCC would like to engage with the Development Partner. Noting however that WCC also wishes to work with the Development partner to unlock delivery of the wider vision area.\nPhase 1 comprises of all the land owned by WCC and will be the principal focus for the Development Partner in the early stages. This includes Lower Yard and Upper Yard.\nAlongside the delivery of Phase 1, WCC wish to work collaboratively with the Development Partner, and other public sector partners where appropriate, to unlock and deliver critical assets which are collectively considered essential to bring forward as subsequent phases of the wider vision.\nWithin the vision area, there will also be a need to consider the public realm, pedestrian and cyclists routes, maximising canal accessibility and car parking to provide the underlying infrastructure and connectivity to support regeneration and its linkages with the city centre.\nWCC's commitment to the Shrub Hill Quarter regeneration is driven by the following objectives:\n- For WCC's assets to unlock the delivery of the vision for Phase 1 of the Shrub Hill Quarter, which maximises on the potential for growth and enhanced connectivity in the future.\n- To benefit from long term, sustainable investment return opportunities in and around the Shrub Hill Station area, maximising on opportunities for value capture from the Project which can be reinvested.\n- To deliver on the placemaking, economic and regeneration ambitions and outputs of the Shrub Hill Quarter as set out in the SPD and Shrub Hill Quarter Vision document.\n- To ensure best value and achievement of value for money outcomes for WCC in relation to their landholdings.\nIn terms of Partnering structure, WCC are seeking to appoint a Master Developer to work collaboratively with them to unlock the delivery of the Shrub Hill Quarter vision.\nPursuant to a Development Agreement for Lease and Development Leases, the parties will have defined roles and responsibilities to unlock a phased delivery and drawdown of the site with a share on the commercial return, after costs, either as land receipt and/or surplus profit.\nThe partnering arrangement will be via a Development Agreement for Lease allowing for the draw down of development leases. The contractual arrangements will approach the opportunity in three stages:\nPart 1 - The first part will deal with the requirements to drawdown the land/assets within Phase 1 that can deliver an early phase of development within the specified requirements set out in funding parameters already secured.\nPart 2 - The second part will deal with further developing the Vision for the whole of Phase 1, to include master planning, a planning application process for Phase 1 and, subject to achieving an acceptable planning permission, the subsequent phased delivery of development.\nPart 3 - The third part will be to work collaboratively with WCC (and other partners where appropriate) to unlock wider assets and infrastructure that could support the delivery of the wider Vision. Additional information: NB The estimated total value included in II.2.6 is further clarified as being the Phase 1 Indicative GDV which is estimated at £80m - £90m.",
        "secondStage": {
          "maximumCandidates": 4,
          "minimumCandidates": 4
        },
        "awardCriteria": {
          "criteria": [
            {
              "name": "Quality / Weighting",
              "type": "quality",
              "description": "65"
            },
            {
              "name": "Cost / Weighting",
              "type": "cost",
              "description": "35"
            }
          ]
        },
        "contractPeriod": {
          "durationInDays": 1800
        },
        "submissionTerms": {
          "variantPolicy": "notAllowed"
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UKG12"
          }
        ]
      }
    ],
    "title": "Development Partner for Shrub Hill Quarter, Worcester",
    "value": {
      "amount": 80000000,
      "currency": "GBP"
    },
    "status": "active",
    "coveredBy": [
      "GPA"
    ],
    "documents": [
      {
        "id": "economic1",
        "documentType": "economicSelectionCriteria"
      },
      {
        "id": "technical1",
        "documentType": "technicalSelectionCriteria"
      }
    ],
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "description": "Worcestershire County Council (''WCC'') is seeking to procure a Development Partner for part of the Shrub Hill Quarter, an area which extends from Shrub Hill Station to the city centre.\nThe proposed development of Shrub Hill Quarter (of which this opportunity comprises part) has the potential to become one of the largest regeneration initiatives in the region, offering a unique opportunity to transform a significant part of Worcester, close to the city centre, and create an exemplary mixed-use neighbourhood. There is potential that the rail station at Shrub Hill will benefit from future signalling upgrades, which will significantly improve the city's connectivity and accessibility.\nOver the past few years, WCC has begun to unlock long-term opportunities by developing a concept masterplan, the Shrub Hill Spatial Blueprint, and securing funding to aid with the demolition and redevelopment of key components of Phase 1. A range of technical due diligence has already been undertaken across the land assets that WCC own, which comprise the whole of Phase 1. A Shrub Hill Supplementary Planning Document (SPD) is also due to be adopted shortly. This work has been undertaken with the support of key public sector partners, including Worcester City Council and London and Continental Railways (LCR).\nWCC are looking forward to working with the selected partner to secure the successful delivery of the vision as follows:\n\"With transformed national connectivity and inspiring heritage, Shrub Hill will become a vibrant new community and destination for Worcester. It will be a home for enterprise, ideas, and experiences; a place which is recognised for sustainable and innovative forms of living, working and relaxing, and which is driven by local energy & participation. Supporting City and County investment and growth aspirations, it will become established as an exemplar for successful and inspiring urban renewal and investment\".\nThe vision and overarching ambitions for the Shrub Hill Quarter are described in more detail within the Shrub Hill Quarter Vision document which was jointly created by Worcestershire County Council and Worcester City Council and endorsed by the Worcestershire Local Enterprise Partnership.\nPreliminary studies suggest that in the next 20 years the area could provide:\n- Up to 5,000 jobs\n- 500 + homes\n- A new gateway to Worcester City Centre\n- 2 hectares of new public space.\nThe Quarter will be an extension of the city centre and provide excellent local, regional and national connections. The employment element will co-exist with new homes, concentrating around a re-energised canal and high quality public realm.\nThe Quarter will develop along a main green spine which will connect Shrub Hill Station to the city and this will be supported by a series of new pedestrian and cycle links through the area. The layout of the Quarter will be generated from movement routes and view corridors with a particular focus on using the area's heritage (canal and built form) to establish character and reinforce wayfinding.\nIllustrative masterplan example for entire vision area:\nResidential approx. 37,000 sq m (398,265 sq ft) \nCommercial approx. 87,500 sq m (941,842 sq ft) \nResidential parking approx. 140\nCommercial parking approx. 380\nFollowing Cabinet approval in March 2024, supported by Soft Market Testing in August 2023 and August 2024, WCC now intends to formally procure a development partner to take forward the development of WCC's land in the Shrub Hill Quarter.\nA Descriptive Document is made available that sets out the principal objectives and the requirements of the Competitive Dialogue procurement process, alongside a summary of the key components of the opportunity.\nNB The estimated total value included in II.1.5 is further clarified as being the Phase 1 Indicative GDV which is estimated at £80m - £90m.",
    "secondStage": {
      "invitationDate": "2025-04-14T00:00:00+01:00"
    },
    "tenderPeriod": {
      "endDate": "2025-03-13T12:00:00Z"
    },
    "contractTerms": {
      "performanceTerms": "In the procurement documents"
    },
    "hasRecurrence": false,
    "classification": {
      "id": "45111291",
      "scheme": "CPV",
      "description": "Site-development work"
    },
    "submissionTerms": {
      "languages": [
        "en"
      ]
    },
    "submissionMethod": [
      "electronicSubmission"
    ],
    "procurementMethod": "selective",
    "selectionCriteria": {
      "criteria": [
        {
          "type": "suitability",
          "appliesTo": [
            "supplier"
          ],
          "description": "In the procurement documents"
        }
      ]
    },
    "mainProcurementCategory": "works",
    "submissionMethodDetails": "https://www.in-tendorganiser.co.uk/worcestershire",
    "procurementMethodDetails": "Competitive dialogue"
  },
  "parties": [
    {
      "id": "GB-FTS-137527",
      "name": "Worcestershire County Council",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKG12",
        "locality": "WORCESTER",
        "postalCode": "WR5 2NP",
        "countryName": "United Kingdom",
        "streetAddress": "County Hall"
      },
      "details": {
        "url": "http://www,worcestershire,gov.uk",
        "classifications": [
          {
            "id": "REGIONAL_AUTHORITY",
            "scheme": "TED_CA_TYPE",
            "description": "Regional or local authority"
          },
          {
            "id": "01",
            "scheme": "COFOG",
            "description": "General public services"
          }
        ]
      },
      "identifier": {
        "legalName": "Worcestershire County Council",
        "noIdentifierRationale": "notOnAnyRegister"
      },
      "contactPoint": {
        "url": "https://www.in-tendorganiser.co.uk/worcestershire",
        "name": "Claire Wooding",
        "email": "cwooding1@worcestershire.gov.uk"
      }
    },
    {
      "id": "GB-FTS-137528",
      "name": "The Royal Courts of Justice",
      "roles": [
        "reviewBody"
      ],
      "address": {
        "locality": "London",
        "postalCode": "WC21 2LL",
        "countryName": "United Kingdom",
        "streetAddress": "The Strand"
      },
      "identifier": {
        "legalName": "The Royal Courts of Justice"
      }
    }
  ],
  "language": "en",
  "description": "- The Selection Questionnaire, Descriptive Document and the draft Invitation to Participate in Dialogue documents are available via http://in- tendhost.co.uk/worcestershire (http://in- tendhost.co.uk/worcestershire) and the opportunity is entitled 'Development Partner for Shrub Hill Quarter, Worcester'.\n- Note the return date and time in IV.2.2 is the final date for submission of the completed Selection Questionnaire.\n- This procurement process will be conducted through the in-tend e-tendering portal and any submission made outside of this portal will be disqualified.\n- All communications, including SelectionQuestionnaire responses and tender submissions must be written in English and priced in pounds sterling.\n- Nothing in this procurement process is intended to form any express or implied contractual relationship between the parties unless and until the award of a contract is concluded.\n- Any contract entered into as a result of this procurement will be considered to be a contract governed by English Law and subject to the exclusive jurisdiction of the Courts of England and Wales.\n- WCC is not liable for any costs, fees or expenses (including third party costs, fees or expenses) incurred by those expressing an interest in, negotiating or tendering for this contract opportunity.\n- WCC reserves the right to terminate or suspend this procurement process or to amend or vary the process at any time prior to the conclusion of the award of contract without liability to any party.\n- WCC reserves the right to disqualify any candidate who provides information or confirmations which later proves to be untrue or incorrect, does not supply the information required by this notice or by the Selection Questionnaire or Invitation to Participate in Dialogue or as otherwise directed by WCC during the procurement process, or fulfils any one or more of the criteria stated in the Selection Questionnaire, including Regulation 57 of the Public Contracts Regulations 2015.\n- Further to II.1.5) Estimated total value is included is the envisaged gross development value (GDV)?",
  "initiationType": "tender"
}
Complete JSON history (1 releases)
11 Feb 2025 · 004500-2025 · tender
{
  "id": "004500-2025",
  "tag": [
    "tender"
  ],
  "date": "2025-02-11T11:08:10Z",
  "ocid": "ocds-h6vhtk-04dd92",
  "buyer": {
    "id": "GB-FTS-137527",
    "name": "Worcestershire County Council"
  },
  "tender": {
    "id": "ocds-h6vhtk-04dd92",
    "lots": [
      {
        "id": "1",
        "value": {
          "amount": 80000000,
          "currency": "GBP"
        },
        "status": "active",
        "hasOptions": false,
        "hasRenewal": false,
        "description": "The Shrub Hill Quarter Vision area within WCC's ownership is the extent of the contracted area within which WCC would like to engage with the Development Partner. Noting however that WCC also wishes to work with the Development partner to unlock delivery of the wider vision area.\nPhase 1 comprises of all the land owned by WCC and will be the principal focus for the Development Partner in the early stages. This includes Lower Yard and Upper Yard.\nAlongside the delivery of Phase 1, WCC wish to work collaboratively with the Development Partner, and other public sector partners where appropriate, to unlock and deliver critical assets which are collectively considered essential to bring forward as subsequent phases of the wider vision.\nWithin the vision area, there will also be a need to consider the public realm, pedestrian and cyclists routes, maximising canal accessibility and car parking to provide the underlying infrastructure and connectivity to support regeneration and its linkages with the city centre.\nWCC's commitment to the Shrub Hill Quarter regeneration is driven by the following objectives:\n- For WCC's assets to unlock the delivery of the vision for Phase 1 of the Shrub Hill Quarter, which maximises on the potential for growth and enhanced connectivity in the future.\n- To benefit from long term, sustainable investment return opportunities in and around the Shrub Hill Station area, maximising on opportunities for value capture from the Project which can be reinvested.\n- To deliver on the placemaking, economic and regeneration ambitions and outputs of the Shrub Hill Quarter as set out in the SPD and Shrub Hill Quarter Vision document.\n- To ensure best value and achievement of value for money outcomes for WCC in relation to their landholdings.\nIn terms of Partnering structure, WCC are seeking to appoint a Master Developer to work collaboratively with them to unlock the delivery of the Shrub Hill Quarter vision.\nPursuant to a Development Agreement for Lease and Development Leases, the parties will have defined roles and responsibilities to unlock a phased delivery and drawdown of the site with a share on the commercial return, after costs, either as land receipt and/or surplus profit.\nThe partnering arrangement will be via a Development Agreement for Lease allowing for the draw down of development leases. The contractual arrangements will approach the opportunity in three stages:\nPart 1 - The first part will deal with the requirements to drawdown the land/assets within Phase 1 that can deliver an early phase of development within the specified requirements set out in funding parameters already secured.\nPart 2 - The second part will deal with further developing the Vision for the whole of Phase 1, to include master planning, a planning application process for Phase 1 and, subject to achieving an acceptable planning permission, the subsequent phased delivery of development.\nPart 3 - The third part will be to work collaboratively with WCC (and other partners where appropriate) to unlock wider assets and infrastructure that could support the delivery of the wider Vision. Additional information: NB The estimated total value included in II.2.6 is further clarified as being the Phase 1 Indicative GDV which is estimated at £80m - £90m.",
        "secondStage": {
          "maximumCandidates": 4,
          "minimumCandidates": 4
        },
        "awardCriteria": {
          "criteria": [
            {
              "name": "Quality / Weighting",
              "type": "quality",
              "description": "65"
            },
            {
              "name": "Cost / Weighting",
              "type": "cost",
              "description": "35"
            }
          ]
        },
        "contractPeriod": {
          "durationInDays": 1800
        },
        "submissionTerms": {
          "variantPolicy": "notAllowed"
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UKG12"
          }
        ]
      }
    ],
    "title": "Development Partner for Shrub Hill Quarter, Worcester",
    "value": {
      "amount": 80000000,
      "currency": "GBP"
    },
    "status": "active",
    "coveredBy": [
      "GPA"
    ],
    "documents": [
      {
        "id": "economic1",
        "documentType": "economicSelectionCriteria"
      },
      {
        "id": "technical1",
        "documentType": "technicalSelectionCriteria"
      }
    ],
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "description": "Worcestershire County Council (''WCC'') is seeking to procure a Development Partner for part of the Shrub Hill Quarter, an area which extends from Shrub Hill Station to the city centre.\nThe proposed development of Shrub Hill Quarter (of which this opportunity comprises part) has the potential to become one of the largest regeneration initiatives in the region, offering a unique opportunity to transform a significant part of Worcester, close to the city centre, and create an exemplary mixed-use neighbourhood. There is potential that the rail station at Shrub Hill will benefit from future signalling upgrades, which will significantly improve the city's connectivity and accessibility.\nOver the past few years, WCC has begun to unlock long-term opportunities by developing a concept masterplan, the Shrub Hill Spatial Blueprint, and securing funding to aid with the demolition and redevelopment of key components of Phase 1. A range of technical due diligence has already been undertaken across the land assets that WCC own, which comprise the whole of Phase 1. A Shrub Hill Supplementary Planning Document (SPD) is also due to be adopted shortly. This work has been undertaken with the support of key public sector partners, including Worcester City Council and London and Continental Railways (LCR).\nWCC are looking forward to working with the selected partner to secure the successful delivery of the vision as follows:\n\"With transformed national connectivity and inspiring heritage, Shrub Hill will become a vibrant new community and destination for Worcester. It will be a home for enterprise, ideas, and experiences; a place which is recognised for sustainable and innovative forms of living, working and relaxing, and which is driven by local energy & participation. Supporting City and County investment and growth aspirations, it will become established as an exemplar for successful and inspiring urban renewal and investment\".\nThe vision and overarching ambitions for the Shrub Hill Quarter are described in more detail within the Shrub Hill Quarter Vision document which was jointly created by Worcestershire County Council and Worcester City Council and endorsed by the Worcestershire Local Enterprise Partnership.\nPreliminary studies suggest that in the next 20 years the area could provide:\n- Up to 5,000 jobs\n- 500 + homes\n- A new gateway to Worcester City Centre\n- 2 hectares of new public space.\nThe Quarter will be an extension of the city centre and provide excellent local, regional and national connections. The employment element will co-exist with new homes, concentrating around a re-energised canal and high quality public realm.\nThe Quarter will develop along a main green spine which will connect Shrub Hill Station to the city and this will be supported by a series of new pedestrian and cycle links through the area. The layout of the Quarter will be generated from movement routes and view corridors with a particular focus on using the area's heritage (canal and built form) to establish character and reinforce wayfinding.\nIllustrative masterplan example for entire vision area:\nResidential approx. 37,000 sq m (398,265 sq ft) \nCommercial approx. 87,500 sq m (941,842 sq ft) \nResidential parking approx. 140\nCommercial parking approx. 380\nFollowing Cabinet approval in March 2024, supported by Soft Market Testing in August 2023 and August 2024, WCC now intends to formally procure a development partner to take forward the development of WCC's land in the Shrub Hill Quarter.\nA Descriptive Document is made available that sets out the principal objectives and the requirements of the Competitive Dialogue procurement process, alongside a summary of the key components of the opportunity.\nNB The estimated total value included in II.1.5 is further clarified as being the Phase 1 Indicative GDV which is estimated at £80m - £90m.",
    "secondStage": {
      "invitationDate": "2025-04-14T00:00:00+01:00"
    },
    "tenderPeriod": {
      "endDate": "2025-03-13T12:00:00Z"
    },
    "contractTerms": {
      "performanceTerms": "In the procurement documents"
    },
    "hasRecurrence": false,
    "classification": {
      "id": "45111291",
      "scheme": "CPV",
      "description": "Site-development work"
    },
    "submissionTerms": {
      "languages": [
        "en"
      ]
    },
    "submissionMethod": [
      "electronicSubmission"
    ],
    "procurementMethod": "selective",
    "selectionCriteria": {
      "criteria": [
        {
          "type": "suitability",
          "appliesTo": [
            "supplier"
          ],
          "description": "In the procurement documents"
        }
      ]
    },
    "mainProcurementCategory": "works",
    "submissionMethodDetails": "https://www.in-tendorganiser.co.uk/worcestershire",
    "procurementMethodDetails": "Competitive dialogue"
  },
  "parties": [
    {
      "id": "GB-FTS-137527",
      "name": "Worcestershire County Council",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKG12",
        "locality": "WORCESTER",
        "postalCode": "WR5 2NP",
        "countryName": "United Kingdom",
        "streetAddress": "County Hall"
      },
      "details": {
        "url": "http://www,worcestershire,gov.uk",
        "classifications": [
          {
            "id": "REGIONAL_AUTHORITY",
            "scheme": "TED_CA_TYPE",
            "description": "Regional or local authority"
          },
          {
            "id": "01",
            "scheme": "COFOG",
            "description": "General public services"
          }
        ]
      },
      "identifier": {
        "legalName": "Worcestershire County Council",
        "noIdentifierRationale": "notOnAnyRegister"
      },
      "contactPoint": {
        "url": "https://www.in-tendorganiser.co.uk/worcestershire",
        "name": "Claire Wooding",
        "email": "cwooding1@worcestershire.gov.uk"
      }
    },
    {
      "id": "GB-FTS-137528",
      "name": "The Royal Courts of Justice",
      "roles": [
        "reviewBody"
      ],
      "address": {
        "locality": "London",
        "postalCode": "WC21 2LL",
        "countryName": "United Kingdom",
        "streetAddress": "The Strand"
      },
      "identifier": {
        "legalName": "The Royal Courts of Justice"
      }
    }
  ],
  "language": "en",
  "description": "- The Selection Questionnaire, Descriptive Document and the draft Invitation to Participate in Dialogue documents are available via http://in- tendhost.co.uk/worcestershire (http://in- tendhost.co.uk/worcestershire) and the opportunity is entitled 'Development Partner for Shrub Hill Quarter, Worcester'.\n- Note the return date and time in IV.2.2 is the final date for submission of the completed Selection Questionnaire.\n- This procurement process will be conducted through the in-tend e-tendering portal and any submission made outside of this portal will be disqualified.\n- All communications, including SelectionQuestionnaire responses and tender submissions must be written in English and priced in pounds sterling.\n- Nothing in this procurement process is intended to form any express or implied contractual relationship between the parties unless and until the award of a contract is concluded.\n- Any contract entered into as a result of this procurement will be considered to be a contract governed by English Law and subject to the exclusive jurisdiction of the Courts of England and Wales.\n- WCC is not liable for any costs, fees or expenses (including third party costs, fees or expenses) incurred by those expressing an interest in, negotiating or tendering for this contract opportunity.\n- WCC reserves the right to terminate or suspend this procurement process or to amend or vary the process at any time prior to the conclusion of the award of contract without liability to any party.\n- WCC reserves the right to disqualify any candidate who provides information or confirmations which later proves to be untrue or incorrect, does not supply the information required by this notice or by the Selection Questionnaire or Invitation to Participate in Dialogue or as otherwise directed by WCC during the procurement process, or fulfils any one or more of the criteria stated in the Selection Questionnaire, including Regulation 57 of the Public Contracts Regulations 2015.\n- Further to II.1.5) Estimated total value is included is the envisaged gross development value (GDV)?",
  "initiationType": "tender"
}