← Back to search results

AwardedFind a Tender · award

Design Services New Maritime Museum & Archive ED-03-13

Buyer: Derry City & Strabane District Council →

BuyerDerry City & Strabane District Council
StatusAwarded
DeadlineNot published
ValueValue not published
Published26 Apr 2024

What is being bought

The Maritime Museum and Archive Project is for a new museum to be located in existing listed buildings at Ebrington in Derry~Londonderry. Derry City and Strabane District Council is the Contracting Authority. In 2015, following a Public Procurement Exercise under the Restricted Procedure for the Appointment of a Multi Disciplinary Consultant Team for the delivery of the Maritime Museum and Archive Project, Todd Architects were the successful Economic Operator and were duly appointed for, the sum of £490,400.00, for the provision of architectural led integrated consultancy team professional consultancy services. At the time of their appointment, it was expected that the project would be completed in 2019. In 2018 the project was put on hold prior to the procurement of the Contractor, as the Contracting Authority was awaiting funding. At that time, the Integrated Consultant Team ("ICT") had completed RIBA Stages 1-3 and 85% of RIBA Stage 4. The project was on hold from 2018 until late 2023 due to funding issues. Funding is now in place for the completion of the project and such is required to be utilised very urgently. The original project completion was due in 2019. Currently it is anticipated that completion will occur in 2026.

Delivery location

UKN0A

Categories

Construction project management services 71541000Architectural design services 71220000

Lot details

Lot 1

The Maritime Museum and Archive Project is for a new museum to be located in existing listed buildings at Ebrington in Derry~Londonderry. Derry City and Strabane District Council is the Contracting Authority. In 2015, following a Public Procurement Exercise under the Restricted Procedure for the Appointment of a Multi Disciplinary Consultant Team for the delivery of the Maritime Museum and Archive Project, Todd Architects were selected as the successful Economic Operator and were duly appointed, for the sum of £490,400.00, for the provision of architectural led integrated consultancy team professional consultancy services. At the time of their appointment, it was expected that the project would be completed in 2019. In 2018 the project was put on hold prior to the procurement of the Contractor, as the Contracting Authority was awaiting funding. At that time, the ICT had completed RIBA Stages 1-3 and 85% of RIBA Stage 4. The project was on hold from 2018 until late 2023. Funding is now in place for the completion of the stated project. The original project completion was due in 2019. Currently it is anticipated that the completion will occur in 2026. Derry City and Strabane District Council, the Contracting Authority, intends that the ICT appointed in 2015, complete the commission for which they were appointed. There have been a number of consequences as a result of the prolonged stand still of the project. During this time, there have been changes in legislation, in particular building control. Additionally, the statutory approvals for the project have lapsed and other changes have occurred, that could not have been reasonably been foreseen, that have impacted the project. Additionally, the project has been adversely affected by the extremely high rate of construction inflation during recent years. Neither the high rate of construction inflation nor the protracted period of standstill of the project could have been reasonably foreseen by the appointed consultant at the time of tendering for the project in 2015. Derry City and Strabane District Council, the Contracting Authority, is minded to amend the contract with Todd Architects, by the introduction of the X1 clause to the NEC3 PSC to address the inflationary impact on fees for the remainder of the contract. The scope of the project and the work that Todd Architects is required to perform has not materially changed. The original appointment was made using a NEC3 Option A Professional Services Contract that did not include an X1 Clause (Price Adjustment for inflation clause). At the time of appointment of Todd Architects, it was expected that the project would be complete by 2019. The anticipated completion date is currently 2026, some seven years later. During this time there have been unprecedented inflationary rises. In order to mitigate this significant increase, it is reasonable and necessary to apply the X1 clause for the remainder of the project. The Contracting Authority is minded that the proposed change to the contract is in accordance with regulation 72 of the Public Procurement Regulations Contracts. In this regard, it states that: 72.-(1) Contracts and framework agreements may be modified without a new procurement procedure in accordance with this Part in any of the following cases:- (e) where the modifications, irrespective of their value, are not substantial within the meaning of paragraph (8); The Contracting Authority is of the opinion that had the X1 clause been included in the original tender, the tender selection would have remained unchanged. It would not have attracted additional participants to the tender process, nor would it have changed the candidates selected, nor the outcome of the tender selection. Under the terms of the Public Procurement Regulations 72, a Voluntary Ex- Ante Transparency VEAT notice is required to cover a variation to the contract between Derry City and Strabane District Council, the Contracting Authority and the Integrated Consultant Team led by Todd Architects for the Maritime Museum Project in Derry~Londonderry. Derry City and Strabane District Council, the Contracting Authority is therefore publishing this Voluntary Ex Ante Transparency Notice to cover a variation to the stated contract and for additional tasks to be carried out necessary as a result of changes in legislation and lapses in statutory approvals. It should be noted that the scope of the original commission has not changed.

Award criteria
Methodology — 21
Programme — 7
Resources — 17.5
Coordination with Interpretative Designer — 17.5
Cost Management — 7
price — 30

What is included

ItemCategoryQuantity
1Construction project management servicesNot published

Comparable-procurement analytics

Benchmarked against retained Find a Tender procedures with CPV division 71. The category anchor is Construction project management services (71541000); this is a deliberately broad market comparator. The comparison is shown at several levels rather than pretending one company or region is always the best benchmark.

Comparison setProceduresReported bids per procedureNamed award suppliersPrice evidence
Market: CPV division 716,8474 median · 31.5 average (2,507 of 6,847 with a bid count)4.2 average (2,780 of 6,847 with named award suppliers)Not published
Same buyer0Not publishedNot publishedNot published
Delivery region: UKN0A2811 median · 20.4 average (7 of 28 with a bid count)2.6 average (8 of 28 with named award suppliers)Not published

“Reported bids” is an official aggregate, sometimes reported per lot; it is the closest available competition measure. “Named award suppliers” are winners, not all applicants.

Price-outcome signal

Not enough comparable procedures currently publish both a GBP tender value and a usable lowest-valid-bid value to calculate a responsible price-reduction benchmark. Tenderline deliberately does not infer a saving from named award suppliers or from missing award values.

Procurement strategy & market signals

Framework agreementNot published
Dynamic purchasing systemNot published
Competitive procurementNot published
Recurring requirementNot published
Procurement method rationaleUnder Public Procurement Regulations 72, a Voluntary Ex- Ante Transparency notice is required to cover a variation to the contract between Derry City & Strabane District Council, the Contracting Authority and the ICT led by Todd Architects for the Maritime Museum Project. The Contracting Authority is publishing this VEAT Notice to cover variation to the contract and for additional tasks to be carried out necessary as a result of changes in legislation and lapses in statutory approvals. The scope of the original commission has not changed. In 2015, following a Public Procurement Exercise for the Appointment of a Multi Disciplinary Consultant Team for delivery of the Maritime Museum, Todd Architects were appointed for the sum of £490,400.00. At the time of appointment project completion was intended to be in 2019. In 2018 the project was put on hold, awaiting funding. At that time, the ICT had completed RIBA Stages 1-3 and 85% RIBA Stage 4. The project was on hold until late 2023. Funding is now in place for the completion of the project but must be utilised urgently. Currently it is anticipated that completion will be 2026. The Contracting Authority, intends that the ICT appointed in 2015, complete the commission for which it was appointed. There have been a number of consequences as a result of the prolonged stand still of the project. During this time, there have been changes in legislation, in particular building control, the statutory approvals for the project have lapsed and other changes have occurred that could not have been reasonably been foreseen, that have impacted the project. Additionally, the project has been adversely affected by extremely high rates of inflation during recent years. Neither the high rates of inflation nor the protracted period of standstill of the project could have been reasonably foreseen by the appointed consultant at the time of tendering in 2015. The Contracting Authority, is minded to amend the contract, by the introduction of the X1 clause to the NEC3 PSC to address the inflationary impact on fees for the remainder of the contract. The original appointment used a NEC3 Option A PSC that did not include an X1 Clause (Price Adjustment for inflation clause). At the time of appointment of the ICT, project completion was 2019. The anticipated completion date is currently 2026, some 7years later. During this time there have been unprecedented construction industry inflationary rises. In order to mitigate this significant increase, it is reasonable and necessary to apply the X1 clause for the remainder of the project. The Contracting Authority is minded that the proposed change to the contract is in accordance with regulation 72 of the Public Procurement Regulations Contracts. In this regard, it states that: 72.-(1) Contracts and framework agreements may be modified without a new procurement procedure in accordance with this Part in any of the following cases:- (e) where the modifications, irrespective of their value, are not substantial within the meaning of paragraph (8); The Contracting Authority is of the opinion that had the X1 clause been included in the original tender, the tender selection would have remained unchanged from that concluded in 2015. Having considered all the issues the Contracting Authority is of the view that the introduction of the X1 clause does not render the contract materially different in character from the one initially concluded; the modification would not have attracted additional participants to the tender process, nor would it have changed the candidates selected, or the ultimate outcome of the tender selection. Further the modification does not change the economic balance of the contract in favour of the ICT and nor does the modification extend the scope of the contract considerably. Consequently, having considered the matter the Contracting Authority is of the view that this matter comes within the scope of Regulation 72(1)(e) and the related Regulation 72(8).
Rationale classificationsThe procurement falls outside the scope of application of the directive
Special regimeNot published
Covered byGPA
Submission policyNot published
Selection criteriaNot published
Risk detailsNot published

Planning & early market engagement

BudgetNot published
No-engagement rationaleNot published
Planning documents0
Planning milestones0

No planning milestones published.

Related procurements

No linked framework, prior procurement or reprocurement published.

Awards

Design Services New Maritime Museum & Archive ED-03-13

Statusactive

Contracts

Design Services New Maritime Museum & Archive ED-03-13

Statusactive
Value£812,906

Documents & submission route

No documents are published in the current source record.

Source data inventory

Diagnostic view. “Not published” means this current release does not provide a value.

OCIDocds-h6vhtk-045589
Latest release ID013638-2024
Latest release timestampFri Apr 26 2024 14:21:15 GMT+0000 (Coordinated Universal Time)
Sourcefind-a-tender
Official notice URLNot published
Tender statuscomplete
Procurement methodlimited
Procurement method detailsAward procedure without prior publication of a call for competition
Main procurement categoryservices
Above thresholdNot published
Legal basis32014L0024
Tender period: startNot published
Tender period: endNot published
Expression of interest deadlineNot published
Enquiry deadlineNot published
Award period: startNot published
Award period: endNot published
Submission method detailsNot published
Submission languagesNot published
Electronic catalogue policyNot published
Total tender valueNot published
Tender lots in source1
Tender items in source1
Tender documents in source0
Awards in latest release1
Contracts in latest release1
Parties in latest release3

Notice history

DateEventReference
26 Apr 2024award, contract013638-2024

All source data

Unmodified official OCDS data retained by Tenderline for this procurement process.

Complete current OCDS release JSON
{
  "id": "013638-2024",
  "tag": [
    "award",
    "contract"
  ],
  "date": "2024-04-26T15:21:15+01:00",
  "ocid": "ocds-h6vhtk-045589",
  "buyer": {
    "id": "GB-FTS-112156",
    "name": "Derry City & Strabane District Council"
  },
  "links": [
    {
      "rel": "prev",
      "href": "https://ted.europa.eu/udl?uri=TED:NOTICE:419198-2014:TEXT:EN:HTML"
    }
  ],
  "awards": [
    {
      "id": "013638-2024-1",
      "title": "Design Services New Maritime Museum & Archive ED-03-13",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-COH-NI021213",
          "name": "Todd Architects"
        }
      ],
      "relatedLots": [
        "1"
      ]
    }
  ],
  "tender": {
    "id": "ocds-h6vhtk-045589",
    "lots": [
      {
        "id": "1",
        "hasOptions": false,
        "description": "The Maritime Museum and Archive Project is for a new museum to be located in existing listed buildings at Ebrington in Derry~Londonderry. Derry City and Strabane District Council is the Contracting Authority.\nIn 2015, following a Public Procurement Exercise under the Restricted Procedure for the Appointment of a Multi Disciplinary Consultant Team for the delivery of the Maritime Museum and Archive Project, Todd Architects were selected as the successful Economic Operator and were duly appointed, for the sum of £490,400.00, for the provision of architectural led integrated consultancy team professional consultancy services. At the time of their appointment, it was expected that the project would be completed in 2019.\nIn 2018 the project was put on hold prior to the procurement of the Contractor, as the Contracting Authority was awaiting funding. At that time, the ICT had completed RIBA Stages 1-3 and 85% of RIBA Stage 4.\nThe project was on hold from 2018 until late 2023. Funding is now in place for the completion of the stated project. \nThe original project completion was due in 2019. Currently it is anticipated that the completion will occur in 2026.\nDerry City and Strabane District Council, the Contracting Authority, intends that the ICT appointed in 2015, complete the commission for which they were appointed.\nThere have been a number of consequences as a result of the prolonged stand still of the project. During this time, there have been changes in legislation, in particular building control. Additionally, the statutory approvals for the project have lapsed and other changes have occurred, that could not have been reasonably been foreseen, that have impacted the project.\nAdditionally, the project has been adversely affected by the extremely high rate of construction inflation during recent years. Neither the high rate of construction inflation nor the protracted period of standstill of the project could have been reasonably foreseen by the appointed consultant at the time of tendering for the project in 2015.\nDerry City and Strabane District Council, the Contracting Authority, is minded to amend the contract with Todd Architects, by the introduction of the X1 clause to the NEC3 PSC to address the inflationary impact on fees for the remainder of the contract. The scope of the project and the work that Todd Architects is required to perform has not materially changed.\nThe original appointment was made using a NEC3 Option A Professional Services Contract that did not include an X1 Clause (Price Adjustment for inflation clause). At the time of appointment of Todd Architects, it was expected that the project would be complete by 2019. The anticipated completion date is currently 2026, some seven years later. During this time there have been unprecedented inflationary rises. In order to mitigate this significant increase, it is reasonable and necessary to apply the X1 clause for the remainder of the project. \nThe Contracting Authority is minded that the proposed change to the contract is in accordance with regulation 72 of the Public Procurement Regulations Contracts. In this regard, it states that:\n72.-(1) Contracts and framework agreements may be modified without a new procurement procedure in accordance with this Part in any of the following cases:-\n(e) where the modifications, irrespective of their value, are not substantial within the meaning of paragraph (8);\nThe Contracting Authority is of the opinion that had the X1 clause been included in the original tender, the tender selection would have remained unchanged. It would not have attracted additional participants to the tender process, nor would it have changed the candidates selected, nor the outcome of the tender selection.\nUnder the terms of the Public Procurement Regulations 72, a Voluntary Ex- Ante Transparency VEAT notice is required to cover a variation to the contract between Derry City and Strabane District Council, the Contracting Authority and the Integrated Consultant Team led by Todd Architects for the Maritime Museum Project in Derry~Londonderry.\nDerry City and Strabane District Council, the Contracting Authority is therefore publishing this Voluntary Ex Ante Transparency Notice to cover a variation to the stated contract and for additional tasks to be carried out necessary as a result of changes in legislation and lapses in statutory approvals. It should be noted that the scope of the original commission has not changed.",
        "awardCriteria": {
          "criteria": [
            {
              "name": "Methodology",
              "type": "quality",
              "description": "21"
            },
            {
              "name": "Programme",
              "type": "quality",
              "description": "7"
            },
            {
              "name": "Resources",
              "type": "quality",
              "description": "17.5"
            },
            {
              "name": "Coordination with Interpretative Designer",
              "type": "quality",
              "description": "17.5"
            },
            {
              "name": "Cost Management",
              "type": "quality",
              "description": "7"
            },
            {
              "type": "price",
              "description": "30"
            }
          ]
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryLocation": {
          "description": "Ebrington, Derry ~ Londonderry"
        },
        "deliveryAddresses": [
          {
            "region": "UKN0A"
          }
        ],
        "additionalClassifications": [
          {
            "id": "71541000",
            "scheme": "CPV",
            "description": "Construction project management services"
          }
        ]
      }
    ],
    "title": "Design Services New Maritime Museum & Archive ED-03-13",
    "status": "complete",
    "coveredBy": [
      "GPA"
    ],
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "description": "The Maritime Museum and Archive Project is for a new museum to be located in existing listed buildings at Ebrington in Derry~Londonderry. Derry City and Strabane District Council is the Contracting Authority.\nIn 2015, following a Public Procurement Exercise under the Restricted Procedure for the Appointment of a Multi Disciplinary Consultant Team for the delivery of the Maritime Museum and Archive Project, Todd Architects were the successful Economic Operator and were duly appointed for, the sum of £490,400.00, for the provision of architectural led integrated consultancy team professional consultancy services. At the time of their appointment, it was expected that the project would be completed in 2019.\nIn 2018 the project was put on hold prior to the procurement of the Contractor, as the Contracting Authority was awaiting funding. At that time, the Integrated Consultant Team (\"ICT\") had completed RIBA Stages 1-3 and 85% of RIBA Stage 4.\nThe project was on hold from 2018 until late 2023 due to funding issues. Funding is now in place for the completion of the project and such is required to be utilised very urgently. The original project completion was due in 2019. Currently it is anticipated that completion will occur in 2026.",
    "reviewDetails": "As per PCR2015",
    "classification": {
      "id": "71220000",
      "scheme": "CPV",
      "description": "Architectural design services"
    },
    "procurementMethod": "limited",
    "mainProcurementCategory": "services",
    "procurementMethodDetails": "Award procedure without prior publication of a call for competition",
    "procurementMethodRationale": "Under Public Procurement Regulations 72, a Voluntary Ex- Ante Transparency notice is required to cover a variation to the contract between Derry City & Strabane District Council, the Contracting Authority and the ICT led by Todd Architects for the Maritime Museum Project.\nThe Contracting Authority is publishing this VEAT Notice to cover variation to the contract and for additional tasks to be carried out necessary as a result of changes in legislation and lapses in statutory approvals. The scope of the original commission has not changed.\nIn 2015, following a Public Procurement Exercise for the Appointment of a Multi Disciplinary Consultant Team for delivery of the Maritime Museum, Todd Architects were appointed for the sum of £490,400.00. At the time of appointment project completion was intended to be in 2019.\nIn 2018 the project was put on hold, awaiting funding. At that time, the ICT had completed RIBA Stages 1-3 and 85% RIBA Stage 4. The project was on hold until late 2023. Funding is now in place for the completion of the project but must be utilised urgently. Currently it is anticipated that completion will be 2026.\nThe Contracting Authority, intends that the ICT appointed in 2015, complete the commission for which it was appointed.\nThere have been a number of consequences as a result of the prolonged stand still of the project. During this time, there have been changes in legislation, in particular building control, the statutory approvals for the project have lapsed and other changes have occurred that could not have been reasonably been foreseen, that have impacted the project. Additionally, the project has been adversely affected by extremely high rates of inflation during recent years. Neither the high rates of inflation nor the protracted period of standstill of the project could have been reasonably foreseen by the appointed consultant at the time of tendering in 2015.\nThe Contracting Authority, is minded to amend the contract, by the introduction of the X1 clause to the NEC3 PSC to address the inflationary impact on fees for the remainder of the contract.\nThe original appointment used a NEC3 Option A PSC that did not include an X1 Clause (Price Adjustment for inflation clause). At the time of appointment of the ICT, project completion was 2019. The anticipated completion date is currently 2026, some 7years later. During this time there have been unprecedented construction industry inflationary rises. In order to mitigate this significant increase, it is reasonable and necessary to apply the X1 clause for the remainder of the project.\nThe Contracting Authority is minded that the proposed change to the contract is in accordance with regulation 72 of the Public Procurement Regulations Contracts. In this regard, it states that:\n72.-(1) Contracts and framework agreements may be modified without a new procurement procedure in accordance with this Part in any of the following cases:-\n(e) where the modifications, irrespective of their value, are not substantial within the meaning of paragraph (8);\nThe Contracting Authority is of the opinion that had the X1 clause been included in the original tender, the tender selection would have remained unchanged from that concluded in 2015.\nHaving considered all the issues the Contracting Authority is of the view that the introduction of the X1 clause does not render the contract materially different in character from the one initially concluded; the modification would not have attracted additional participants to the tender process, nor would it have changed the candidates selected, or the ultimate outcome of the tender selection. Further the modification does not change the economic balance of the contract in favour of the ICT and nor does the modification extend the scope of the contract considerably.\nConsequently, having considered the matter the Contracting Authority is of the view that this matter comes within the scope of Regulation 72(1)(e) and the related Regulation 72(8).",
    "procurementMethodRationaleClassifications": [
      {
        "id": "D_OUTSIDE_SCOPE",
        "scheme": "TED_PT_AWARD_CONTRACT_WITHOUT_CALL",
        "description": "The procurement falls outside the scope of application of the directive"
      }
    ]
  },
  "parties": [
    {
      "id": "GB-FTS-112156",
      "name": "Derry City & Strabane District Council",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKN0A",
        "locality": "Derry",
        "postalCode": "BT487NN",
        "countryName": "United Kingdom",
        "streetAddress": "98 Strand Road"
      },
      "details": {
        "url": "http://www.derrystrabane.com",
        "classifications": [
          {
            "id": "REGIONAL_AUTHORITY",
            "scheme": "TED_CA_TYPE",
            "description": "Regional or local authority"
          },
          {
            "id": "01",
            "scheme": "COFOG",
            "description": "General public services"
          }
        ]
      },
      "identifier": {
        "legalName": "Derry City & Strabane District Council",
        "noIdentifierRationale": "notOnAnyRegister"
      },
      "contactPoint": {
        "name": "Colin Killeen",
        "email": "Tenders@derrystrabane.com",
        "telephone": "+44 2871253253"
      }
    },
    {
      "id": "GB-COH-NI021213",
      "name": "Todd Architects",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN06",
        "locality": "Belfast",
        "postalCode": "BT3 9DT",
        "countryName": "United Kingdom",
        "streetAddress": "2nd Floor Titanic House, 6 Queens Road"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "id": "NI021213",
        "scheme": "GB-COH",
        "legalName": "Todd Architects"
      }
    },
    {
      "id": "GB-FTS-80342",
      "name": "The Royal Courts of Justice NI",
      "roles": [
        "reviewBody",
        "mediationBody",
        "reviewContactPoint"
      ],
      "address": {
        "locality": "Belfast",
        "countryName": "United Kingdom"
      },
      "identifier": {
        "legalName": "The Royal Courts of Justice NI"
      }
    }
  ],
  "language": "en",
  "contracts": [
    {
      "id": "013638-2024-1",
      "title": "Design Services New Maritime Museum & Archive ED-03-13",
      "value": {
        "amount": 812906.34,
        "currency": "GBP"
      },
      "status": "active",
      "awardID": "013638-2024-1",
      "dateSigned": "2015-10-20T00:00:00+01:00"
    }
  ],
  "description": "Derry City & Strabane District Council will incorporate a standstill period at the point information on the award of the contract is communicated to suppliers by means of this VEAT notice. The Standstill period will be for a period of 10 calendar days expiring Midnight 7th May 2024",
  "initiationType": "tender"
}
Complete JSON history (1 releases)
26 Apr 2024 · 013638-2024 · award, contract
{
  "id": "013638-2024",
  "tag": [
    "award",
    "contract"
  ],
  "date": "2024-04-26T15:21:15+01:00",
  "ocid": "ocds-h6vhtk-045589",
  "buyer": {
    "id": "GB-FTS-112156",
    "name": "Derry City & Strabane District Council"
  },
  "links": [
    {
      "rel": "prev",
      "href": "https://ted.europa.eu/udl?uri=TED:NOTICE:419198-2014:TEXT:EN:HTML"
    }
  ],
  "awards": [
    {
      "id": "013638-2024-1",
      "title": "Design Services New Maritime Museum & Archive ED-03-13",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-COH-NI021213",
          "name": "Todd Architects"
        }
      ],
      "relatedLots": [
        "1"
      ]
    }
  ],
  "tender": {
    "id": "ocds-h6vhtk-045589",
    "lots": [
      {
        "id": "1",
        "hasOptions": false,
        "description": "The Maritime Museum and Archive Project is for a new museum to be located in existing listed buildings at Ebrington in Derry~Londonderry. Derry City and Strabane District Council is the Contracting Authority.\nIn 2015, following a Public Procurement Exercise under the Restricted Procedure for the Appointment of a Multi Disciplinary Consultant Team for the delivery of the Maritime Museum and Archive Project, Todd Architects were selected as the successful Economic Operator and were duly appointed, for the sum of £490,400.00, for the provision of architectural led integrated consultancy team professional consultancy services. At the time of their appointment, it was expected that the project would be completed in 2019.\nIn 2018 the project was put on hold prior to the procurement of the Contractor, as the Contracting Authority was awaiting funding. At that time, the ICT had completed RIBA Stages 1-3 and 85% of RIBA Stage 4.\nThe project was on hold from 2018 until late 2023. Funding is now in place for the completion of the stated project. \nThe original project completion was due in 2019. Currently it is anticipated that the completion will occur in 2026.\nDerry City and Strabane District Council, the Contracting Authority, intends that the ICT appointed in 2015, complete the commission for which they were appointed.\nThere have been a number of consequences as a result of the prolonged stand still of the project. During this time, there have been changes in legislation, in particular building control. Additionally, the statutory approvals for the project have lapsed and other changes have occurred, that could not have been reasonably been foreseen, that have impacted the project.\nAdditionally, the project has been adversely affected by the extremely high rate of construction inflation during recent years. Neither the high rate of construction inflation nor the protracted period of standstill of the project could have been reasonably foreseen by the appointed consultant at the time of tendering for the project in 2015.\nDerry City and Strabane District Council, the Contracting Authority, is minded to amend the contract with Todd Architects, by the introduction of the X1 clause to the NEC3 PSC to address the inflationary impact on fees for the remainder of the contract. The scope of the project and the work that Todd Architects is required to perform has not materially changed.\nThe original appointment was made using a NEC3 Option A Professional Services Contract that did not include an X1 Clause (Price Adjustment for inflation clause). At the time of appointment of Todd Architects, it was expected that the project would be complete by 2019. The anticipated completion date is currently 2026, some seven years later. During this time there have been unprecedented inflationary rises. In order to mitigate this significant increase, it is reasonable and necessary to apply the X1 clause for the remainder of the project. \nThe Contracting Authority is minded that the proposed change to the contract is in accordance with regulation 72 of the Public Procurement Regulations Contracts. In this regard, it states that:\n72.-(1) Contracts and framework agreements may be modified without a new procurement procedure in accordance with this Part in any of the following cases:-\n(e) where the modifications, irrespective of their value, are not substantial within the meaning of paragraph (8);\nThe Contracting Authority is of the opinion that had the X1 clause been included in the original tender, the tender selection would have remained unchanged. It would not have attracted additional participants to the tender process, nor would it have changed the candidates selected, nor the outcome of the tender selection.\nUnder the terms of the Public Procurement Regulations 72, a Voluntary Ex- Ante Transparency VEAT notice is required to cover a variation to the contract between Derry City and Strabane District Council, the Contracting Authority and the Integrated Consultant Team led by Todd Architects for the Maritime Museum Project in Derry~Londonderry.\nDerry City and Strabane District Council, the Contracting Authority is therefore publishing this Voluntary Ex Ante Transparency Notice to cover a variation to the stated contract and for additional tasks to be carried out necessary as a result of changes in legislation and lapses in statutory approvals. It should be noted that the scope of the original commission has not changed.",
        "awardCriteria": {
          "criteria": [
            {
              "name": "Methodology",
              "type": "quality",
              "description": "21"
            },
            {
              "name": "Programme",
              "type": "quality",
              "description": "7"
            },
            {
              "name": "Resources",
              "type": "quality",
              "description": "17.5"
            },
            {
              "name": "Coordination with Interpretative Designer",
              "type": "quality",
              "description": "17.5"
            },
            {
              "name": "Cost Management",
              "type": "quality",
              "description": "7"
            },
            {
              "type": "price",
              "description": "30"
            }
          ]
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryLocation": {
          "description": "Ebrington, Derry ~ Londonderry"
        },
        "deliveryAddresses": [
          {
            "region": "UKN0A"
          }
        ],
        "additionalClassifications": [
          {
            "id": "71541000",
            "scheme": "CPV",
            "description": "Construction project management services"
          }
        ]
      }
    ],
    "title": "Design Services New Maritime Museum & Archive ED-03-13",
    "status": "complete",
    "coveredBy": [
      "GPA"
    ],
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "description": "The Maritime Museum and Archive Project is for a new museum to be located in existing listed buildings at Ebrington in Derry~Londonderry. Derry City and Strabane District Council is the Contracting Authority.\nIn 2015, following a Public Procurement Exercise under the Restricted Procedure for the Appointment of a Multi Disciplinary Consultant Team for the delivery of the Maritime Museum and Archive Project, Todd Architects were the successful Economic Operator and were duly appointed for, the sum of £490,400.00, for the provision of architectural led integrated consultancy team professional consultancy services. At the time of their appointment, it was expected that the project would be completed in 2019.\nIn 2018 the project was put on hold prior to the procurement of the Contractor, as the Contracting Authority was awaiting funding. At that time, the Integrated Consultant Team (\"ICT\") had completed RIBA Stages 1-3 and 85% of RIBA Stage 4.\nThe project was on hold from 2018 until late 2023 due to funding issues. Funding is now in place for the completion of the project and such is required to be utilised very urgently. The original project completion was due in 2019. Currently it is anticipated that completion will occur in 2026.",
    "reviewDetails": "As per PCR2015",
    "classification": {
      "id": "71220000",
      "scheme": "CPV",
      "description": "Architectural design services"
    },
    "procurementMethod": "limited",
    "mainProcurementCategory": "services",
    "procurementMethodDetails": "Award procedure without prior publication of a call for competition",
    "procurementMethodRationale": "Under Public Procurement Regulations 72, a Voluntary Ex- Ante Transparency notice is required to cover a variation to the contract between Derry City & Strabane District Council, the Contracting Authority and the ICT led by Todd Architects for the Maritime Museum Project.\nThe Contracting Authority is publishing this VEAT Notice to cover variation to the contract and for additional tasks to be carried out necessary as a result of changes in legislation and lapses in statutory approvals. The scope of the original commission has not changed.\nIn 2015, following a Public Procurement Exercise for the Appointment of a Multi Disciplinary Consultant Team for delivery of the Maritime Museum, Todd Architects were appointed for the sum of £490,400.00. At the time of appointment project completion was intended to be in 2019.\nIn 2018 the project was put on hold, awaiting funding. At that time, the ICT had completed RIBA Stages 1-3 and 85% RIBA Stage 4. The project was on hold until late 2023. Funding is now in place for the completion of the project but must be utilised urgently. Currently it is anticipated that completion will be 2026.\nThe Contracting Authority, intends that the ICT appointed in 2015, complete the commission for which it was appointed.\nThere have been a number of consequences as a result of the prolonged stand still of the project. During this time, there have been changes in legislation, in particular building control, the statutory approvals for the project have lapsed and other changes have occurred that could not have been reasonably been foreseen, that have impacted the project. Additionally, the project has been adversely affected by extremely high rates of inflation during recent years. Neither the high rates of inflation nor the protracted period of standstill of the project could have been reasonably foreseen by the appointed consultant at the time of tendering in 2015.\nThe Contracting Authority, is minded to amend the contract, by the introduction of the X1 clause to the NEC3 PSC to address the inflationary impact on fees for the remainder of the contract.\nThe original appointment used a NEC3 Option A PSC that did not include an X1 Clause (Price Adjustment for inflation clause). At the time of appointment of the ICT, project completion was 2019. The anticipated completion date is currently 2026, some 7years later. During this time there have been unprecedented construction industry inflationary rises. In order to mitigate this significant increase, it is reasonable and necessary to apply the X1 clause for the remainder of the project.\nThe Contracting Authority is minded that the proposed change to the contract is in accordance with regulation 72 of the Public Procurement Regulations Contracts. In this regard, it states that:\n72.-(1) Contracts and framework agreements may be modified without a new procurement procedure in accordance with this Part in any of the following cases:-\n(e) where the modifications, irrespective of their value, are not substantial within the meaning of paragraph (8);\nThe Contracting Authority is of the opinion that had the X1 clause been included in the original tender, the tender selection would have remained unchanged from that concluded in 2015.\nHaving considered all the issues the Contracting Authority is of the view that the introduction of the X1 clause does not render the contract materially different in character from the one initially concluded; the modification would not have attracted additional participants to the tender process, nor would it have changed the candidates selected, or the ultimate outcome of the tender selection. Further the modification does not change the economic balance of the contract in favour of the ICT and nor does the modification extend the scope of the contract considerably.\nConsequently, having considered the matter the Contracting Authority is of the view that this matter comes within the scope of Regulation 72(1)(e) and the related Regulation 72(8).",
    "procurementMethodRationaleClassifications": [
      {
        "id": "D_OUTSIDE_SCOPE",
        "scheme": "TED_PT_AWARD_CONTRACT_WITHOUT_CALL",
        "description": "The procurement falls outside the scope of application of the directive"
      }
    ]
  },
  "parties": [
    {
      "id": "GB-FTS-112156",
      "name": "Derry City & Strabane District Council",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKN0A",
        "locality": "Derry",
        "postalCode": "BT487NN",
        "countryName": "United Kingdom",
        "streetAddress": "98 Strand Road"
      },
      "details": {
        "url": "http://www.derrystrabane.com",
        "classifications": [
          {
            "id": "REGIONAL_AUTHORITY",
            "scheme": "TED_CA_TYPE",
            "description": "Regional or local authority"
          },
          {
            "id": "01",
            "scheme": "COFOG",
            "description": "General public services"
          }
        ]
      },
      "identifier": {
        "legalName": "Derry City & Strabane District Council",
        "noIdentifierRationale": "notOnAnyRegister"
      },
      "contactPoint": {
        "name": "Colin Killeen",
        "email": "Tenders@derrystrabane.com",
        "telephone": "+44 2871253253"
      }
    },
    {
      "id": "GB-COH-NI021213",
      "name": "Todd Architects",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN06",
        "locality": "Belfast",
        "postalCode": "BT3 9DT",
        "countryName": "United Kingdom",
        "streetAddress": "2nd Floor Titanic House, 6 Queens Road"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "id": "NI021213",
        "scheme": "GB-COH",
        "legalName": "Todd Architects"
      }
    },
    {
      "id": "GB-FTS-80342",
      "name": "The Royal Courts of Justice NI",
      "roles": [
        "reviewBody",
        "mediationBody",
        "reviewContactPoint"
      ],
      "address": {
        "locality": "Belfast",
        "countryName": "United Kingdom"
      },
      "identifier": {
        "legalName": "The Royal Courts of Justice NI"
      }
    }
  ],
  "language": "en",
  "contracts": [
    {
      "id": "013638-2024-1",
      "title": "Design Services New Maritime Museum & Archive ED-03-13",
      "value": {
        "amount": 812906.34,
        "currency": "GBP"
      },
      "status": "active",
      "awardID": "013638-2024-1",
      "dateSigned": "2015-10-20T00:00:00+01:00"
    }
  ],
  "description": "Derry City & Strabane District Council will incorporate a standstill period at the point information on the award of the contract is communicated to suppliers by means of this VEAT notice. The Standstill period will be for a period of 10 calendar days expiring Midnight 7th May 2024",
  "initiationType": "tender"
}