Design, development, and construction of the Casement Park Stadium new build for Ulster Council

Construction work
Construction work in connection with structures for sports ground
Design and construction
+2 more
Published value
Not published
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: The Department for Communities and The Ulster Council of the Gaelic Athletic Association: "Design, development, and construction of the Casement Park Stadium new build for Ulster Council". Published status: complete. Published value: Value not published. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
Contracting AuthorityThe Department for Communities and The Ulster Council of the Gaelic Athletic AssociationScope & CategoriesNot publishedSubmission Window
complete
No deadline published
Submission GatewayDirect notice routeLegal Basis & RegimeStandard procurementEstimated Value (exc. VAT)Not published
Bidder Intelligence · Authority Profile: The Department for Communities and The Ulster Council of the Gaelic Athletic Association
Market Analytics
View Authority Profile →
Derived from OCDS awards & bid statistics
Published history for The Department for Communities and The Ulster Council of the Gaelic Athletic Association. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Requires at least 5 comparable procedures
Competition Density
Not availableNo published reports
Bid counts are not published for this buyer
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate available
Payment Terms
Check noticePublished terms
Payment obligations depend on the applicable regime and contract. Consult the official documents.
Coverage: 1 active published awards; 0 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Procedure methodNot published
Procurement categoryNot published
Statuscomplete
Framework / DPSNot published
CompetitionNot published
Above thresholdNot published
Legal basisNot published
Tender period startsNot published
Clarification deadlineNot published
Electronic submissionNot published
Submission languagesNot published
Published17 Jul 2023, 21:42 BST
Last source update17 Jul 2023, 21:42 BST
Recurring procurementNot published
ClassificationConstruction work, Construction work in connection with structures for sports ground, Design and construction, Engineering works and construction works, Stadium construction work
OCIDocds-h6vhtk-03e2bd
What is being bought
In December 2013 the Ulster Council of the Gaelic Athletic Association ("GAA") concluded a contract with Heron Buckingham Joint Venture ("HBJV"; "the Contract") after a procurement advertised on 15 January 2013. Invitations to tender were originally issued in May 2013, and reissued in July 2013. GAA is not a contracting authority, but the Contract is one to which the Public Contracts Regulations 2015 (the "PCR 2015") (and previously the Public Contracts Regulations 2006 (the "PCR 2006")) apply by virtue of Regulation 13 of the PCR 2015. The Department for Communities is the relevant contracting authority, and has a funding agreement with GAA, originally made by the Department of Culture Arts & Leisure ("DCAL"), including terms to ensure compliance with procurement law including the PCR 2015 (and previously the PCR 2006), as required by Regulation 13. GAA is not awarding a new contract, but instead now proposes to modify the Contract, considering that, if the proposed modifications amount to a substantial modification of the Contract within the meaning of PCR 2015, they are permissible without a new procurement procedure because the conditions set out in Regulation 72(1)(c) and 72(1)(f) of the PCR 2015 are fulfilled.
What changed
From the official release history
  1. Status changed to complete
    17 Jul 2023, 21:42 BST
  2. Official notice release published
    17 Jul 2023, 21:42 BST
  3. Buyer information updated
    17 Jul 2023, 21:42 BST
Lots and requirements (1)
Published by the contracting authority
  • Lot 1 · #1
    Individual lot title not published
    Status not published
    Published valueNot published
    The Contract is for the reconstruction of the Casement Park stadium in Belfast. It uses the NEC3 Engineering & Construction (Option A) form with additional clauses and requires the contractor to develop the RIBA Stage E design to Stage K and to construct the stadium in accordance with that design, for a specified price. This VEAT notice relates to permitted modification of the Contract. The modifications are connected with changes to the original design, as explained in Annex D1 below. Planning permission for the revised design was granted on 28 July 2021. Implementing it will involve modifying the Contract in relation to: a change to the Stage E design; further services similar to those pre-construction services for which the Contract originally provided; and a resulting increase in the contract price. The overall nature of the Contract will remain the same, i.e. demolition of the existing stadium and construction at the same location of a new stadium for Gaelic sports and ancillary activities. The design has been modified to reduce the capacity of the stadium from approximately 38,000 to 34,500 and incorporate a 360˚ circulation zone around the proposed structure, accommodated by a change to the topography and insertion of a mezzanine standing terrace. The other principal changes flowing from or made possible by these changes include: reduced seating height, and the use of a cantilevered roof covering all spectators (in place of the original truss roof enclosing only three sides of the stadium), producing an overall reduction in the height of the building; and the construction of a new inner crowd loaded wall with a planting zone around the boundary. The anticipated cost for the contractor to deliver remaining works required under the modified contract has been assessed and is expected to be in the range of £112M to £140M. These figures have been reflected in II.1.7 above and V.2.4 below (as 'lowest offer considered' and 'highest offer considered'). This represents an increase of between c.£52M and c.£80M above the original contract value, which was estimated at c.£60m. Such increase in costs can be broadly attributed to inflation since the time of contract award, the cost of design changes and other additional costs associated with the implementation of the proposed modification, noting that all figures presented have been subject to estimating tolerances which have been contributed to the range quoted above. Additional information: Refer to section VI.3
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
Timeline
  1. Procedure published
    17 Jul 2023, 21:42 BST
  2. Award active
    Not published · Not published
  3. Contract active
    Signed 11 Jul 2023, 00:00 BST · Not published
Commercial outcome and competition
Awards
Heron Buckingham JV
Not published · Not published · active
Contracts
Casement Park Stadium Redevelopment and Rebuild for Ulster Council GAA
Not published · signed 11 Jul 2023, 00:00 BST · active
Bid statistics
highestValidBidValue: 140000000
lowestValidBidValue: 112000000
highestValidBidValue: 140000000 (lot 1)
lowestValidBidValue: 112000000 (lot 1)
Buyer and organisations in this procedure

The Department for Communities and The Ulster Council of the Gaelic Athletic Association

Contracting authority GB-FTS-87491
View buyer profile
Documents (0)
Official links; attachments are not copied
No data
No linked documents are published
Related procedures (0)
No data
No related procedures published
Planning and rationale
Planning budgetNot published
No-engagement rationaleNot published
Procedure rationaleGAA proposes to modify the Contract now due to the anticipated advantages of being economically advantageous for the public purse (including Contract cost and risk profile) and more expedient delivery of a functional stadium. The modifications do not alter the overall nature of the Contract. The majority of the proposed modifications result from circumstances a diligent authority in GAA's position could not have foreseen when the Contract was originally procured (in particular, when issuing invitations to tender in July 2013). The remainder of the proposed modifications are not substantial or the value of which, taken together, is below the values described in regulation 72(5) of PCR 2015 in respect of regulation 72(1)(f). When GAA sought planning consent in June 2013, it believed in good faith the design would permit safety certification for stadium operation with up to 38,000 spectators. It was not foreseeable that the responsible bodies would take a contrary view. The original design was produced by experienced professional advisers and considered by a Safety Technical Group (STG) established by DCAL, including persons from Sport NI (responsible for sports ground safety), Belfast CC (responsible for certification), and the police, ambulance and fire and rescue services. Its role included confirming to DCAL, before a planning submission, that relevant scenarios had been anticipated and the design was capable of operation at full capacity. In June 2013 it was confirmed to DCAL that the design had the potential to be operated in a manner enabling a safety certificate based on physical condition and safety management. As a result, the planning application was submitted, and the procurement proceeded. The STG later suggested that emergency evacuation to a place of relative safety must be possible within the time specified in safety guidance, even in a scenario involving closure of all exits along one side of the ground; and also that in such a scenario the pitch was not a place of relative safety. This was not foreseeable given: previous certification of the existing stadium; the way GAA's advisors understood the guidance; that this scenario had not been raised previously; and STG's confirmation prior to the planning submission. After the original grant of planning permission was quashed in 2015, in particular because of the planning authority's failure to correctly assess traffic and related implications of a 38,000- capacity stadium, GAA had no alternative but to alter the design so as to meet this new approach to emergency evacuation, as well as dealing with traffic issues and minimising the risk of a new planning application being rejected or challenged. This process (and associated legal challenges) resulted in five years' delay. Certain changes were made (including to roofing materials) to effect community engagement and mitigate risk of challenge to planning application. The design has also been altered to update floodlights and pitch specifications due to improved technologies and quality standards that have become available since 2013, and which are of a standard reflective of a stadium of the calibre Casement Park has always been intended to achieve.