← Back to search results

ClosedFind a Tender · UK4

Design, Build, Install and Maintenance Contract for Halton Microgrid

Buyer: Halton Borough Council →

View official notice ↗Official source

BuyerHalton Borough Council
StatusClosed
Deadline16 Mar 2026
Value£15,600,000
Published12 Feb 2026

What is being bought

BACKGROUND INFORMATION Halton Borough Council (HBC) is a Unitary Authority based in Cheshire, North West England, comprising the main towns of Runcorn and Widnes. The Council declared a Climate Emergency on the 16th October 2019. Following the declaration, the Council developed an Action Plan which is predominantly focused on reducing the Council's own carbon production. The Council has developed a number of rooftop solar PV schemes and a 1.2MWp solar farm. Whilst these projects have been invaluable, it became apparent to the Council that larger interventions would also be required in order to meet the Council's 2040 net zero target. With this in mind, the Council commissioned a feasibility study in early 2020 to evaluate the potential to construct a solar farm on Council owned wasteland. The study concluded that the potential existed to construct a 3.62MWp solar farm on a closed landfill site located immediately north of Ditton Rd in Widnes (postcode WA8 0PG - Coordinates E: 350056, N: 385004). The site was historically used as a chemical waste landfill site, before being converted to a municipal golf course (St Michael's Golf Course). The course was subsequently closed, and the site has been unused since. The Council are now planning to construct a 3.62MWp solar farm at the closed landfill site, which will be connected to the existing 1.2MWp solar farm via a new 11kV link. The resulting 5.2MWp of solar PV generation will provide power to a number of council owned facilities in Widnes town via an extensive 11kV ring main which is to be installed as part of the project. The scheme will also incorporate a 2MW/4MWh battery storage scheme and a high-power electric vehicle charging hub at the Council's Lower House Lane transport depot. On 1st June 2021 the Council secured a 6.1MVA export and 5.0MVA import grid connection offer from the local DNO (SP Energy Networks). On 27th June 2024, the Council submitted a planning application for the project, and the application was approved on 23rd January 2025. During 2024, the Council has negotiated the necessary agreements to obtain construction access to the site. The Council own the land on which the scheme is to be built, all of the buildings, and will own the Microgrid once it is commissioned and handed over. The Council are now seeking EPC (Engineer Procure and Construct) proposals for the turn-key detailed design, installation and commissioning of the Smart Microgrid Project, which will encompass the following key components; (a) A 3.62MWp solar farm, including all associated building and civil engineering works. (b) An 11kV link between the existing 1.2MWp solar farm and the new 3.62MWp solar farm. (c) A 2MW/4MWh battery storage system at the new solar farm site. (d) An 11kV link from the new solar farm substation to a new Intake Substation located at the Council's Lower House Lane depot, including an associated horizontal drill under a major A Road. (e) A new 33kV / 11kV Intake Substation (ISS) at the Council's Lower House Lane Depot. (f) New 11kV distribution substation infrastructure at four Council sites (Halton Stadium, Halton Leisure Centre, Municipal Offices and Lower House Lane Transport Depot) (g) A buried HV ring connecting the new Intake Substation (ISS) with the four distribution substations. (h) High power EV and eRCV charging infrastructure at the Lower House Lane transport depot. (i) A SCADA control system to enable the efficient and optimal management of the completed microgrid system and the associated generation and storage assets. The Tenderer's scope will include all works required to deliver a fully compliant, safe, efficient and working installation. Following completion of the construction works. The EPC Tenderer shall be responsible for providing EPC warranty and O&M (Operations and Maintenance) services for a minimum period of two years, with options for multiple contract extensions.

Delivery location

UKD71, GB

Categories

Electricity 09310000Solar energy 09330000Electrical installation work 45310000

Lot details

Lot 1

No lot description published.

Statusactive
Value£15,600,000
Contract periodFrom 1 Jul 2026 to 31 Jul 2029
SME suitabilitySuitable for SMEs

Award criteria
Quality (70%)
Price (30%)

What is included

ItemCategoryQuantity
1Electricity, Solar energy, Electrical installation workNot published

Comparable-procurement analytics

Benchmarked against retained Find a Tender procedures with CPV division 09. The category anchor is Electricity (09310000); this is a deliberately broad market comparator. The comparison is shown at several levels rather than pretending one company or region is always the best benchmark.

Comparison setProceduresReported bids per procedureNamed award suppliersPrice evidence
Market: CPV division 097273 median · 25.7 average (192 of 727 with a bid count)4.8 average (222 of 727 with named award suppliers)Not published
Same buyer0Not publishedNot publishedNot published
Delivery region: UKD710Not publishedNot publishedNot published
Similar published value (0.5×–2×)6658 median · 58 average (1 of 66 with a bid count)27 average (1 of 66 with named award suppliers)Not published

“Reported bids” is an official aggregate, sometimes reported per lot; it is the closest available competition measure. “Named award suppliers” are winners, not all applicants.

Price-outcome signal

Not enough comparable procedures currently publish both a GBP tender value and a usable lowest-valid-bid value to calculate a responsible price-reduction benchmark. Tenderline deliberately does not infer a saving from named award suppliers or from missing award values.

Procurement strategy & market signals

Framework agreementNot published
Dynamic purchasing systemNot published
Competitive procurementNot published
Recurring requirementNot published
Procurement method rationaleNot published
Rationale classificationsNot published
Special regimeNot published
Covered byNot published
Submission policyallowed
Selection criteriaNot published
Risk detailsNot published

Planning & early market engagement

BudgetNot published
No-engagement rationaleNot published
Planning documents0
Planning milestones0

No planning milestones published.

Related procurements

No linked framework, prior procurement or reprocurement published.

Source data inventory

Diagnostic view. “Not published” means this current release does not provide a value.

OCIDocds-h6vhtk-050f2b
Latest release ID013053-2026
Latest release timestampThu Feb 12 2026 15:33:43 GMT+0000 (Coordinated Universal Time)
Sourcefind-a-tender
Official notice URLhttps://www.find-tender.service.gov.uk/Notice/013053-2026
Tender statusactive
Procurement methodopen
Procurement method detailsCompetitive flexible procedure
Main procurement categoryworks
Above thresholdYes
Legal basis2023/54
Tender period: startNot published
Tender period: end2026-03-16T15:00:00Z
Expression of interest deadlineNot published
Enquiry deadline2026-01-27T15:00:00Z
Award period: startNot published
Award period: end2026-04-30T23:59:59+01:00
Submission method detailsThe full tender pack can be accessed free of charge via The Chest procurement web portal at https://www.the-chest.org.uk/
Submission languagesen
Electronic catalogue policyNot published
Total tender value£15,600,000
Tender lots in source1
Tender items in source1
Tender documents in source3
Awards in latest release0
Contracts in latest release0
Parties in latest release1

Notice history

DateEventReference
12 Feb 2026tenderUpdate013053-2026
22 Dec 2025tenderUpdate085556-2025
20 Nov 2025tenderUpdate075855-2025
12 Nov 2025tender073277-2025
8 May 2025planning019853-2025

All source data

Unmodified official OCDS data retained by Tenderline for this procurement process.

Complete current OCDS release JSON
{
  "id": "013053-2026",
  "tag": [
    "tenderUpdate"
  ],
  "date": "2026-02-12T15:33:43Z",
  "ocid": "ocds-h6vhtk-050f2b",
  "buyer": {
    "id": "GB-PPON-PLTJ-1788-CBLR",
    "name": "Halton Borough Council"
  },
  "tender": {
    "id": "DN797010",
    "lots": [
      {
        "id": "1",
        "value": {
          "currency": "GBP",
          "amountGross": 15600000
        },
        "status": "active",
        "renewal": {
          "description": "Contract extensions for the operation and maintenance and related services.  The extension options available are for 3 years and 5 x 5 years.  A total of 6 available extensions.\nExtensions are subject to a review of performance, requirements and agreement on pricing."
        },
        "hasRenewal": true,
        "suitability": {
          "sme": true
        },
        "awardCriteria": {
          "criteria": [
            {
              "name": "Quality",
              "type": "quality",
              "numbers": [
                {
                  "number": 70,
                  "weight": "percentageExact"
                }
              ]
            },
            {
              "name": "Price",
              "type": "price",
              "numbers": [
                {
                  "number": 30,
                  "weight": "percentageExact"
                }
              ]
            }
          ]
        },
        "contractPeriod": {
          "endDate": "2029-07-31T23:59:59+01:00",
          "startDate": "2026-07-01T00:00:00+01:00",
          "maxExtentDate": "2057-05-31T23:59:59Z"
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UKD71",
            "country": "GB",
            "countryName": "United Kingdom"
          }
        ],
        "additionalClassifications": [
          {
            "id": "09310000",
            "scheme": "CPV",
            "description": "Electricity"
          },
          {
            "id": "09330000",
            "scheme": "CPV",
            "description": "Solar energy"
          },
          {
            "id": "45310000",
            "scheme": "CPV",
            "description": "Electrical installation work"
          }
        ]
      }
    ],
    "title": "Design, Build, Install and Maintenance Contract for Halton Microgrid",
    "value": {
      "currency": "GBP",
      "amountGross": 15600000
    },
    "status": "active",
    "documents": [
      {
        "id": "conflictOfInterest",
        "description": "Not published",
        "documentType": "conflictOfInterest"
      },
      {
        "id": "L-1",
        "url": "www.the-chest.org.uk",
        "description": "The full access of the tender pack is available free of charge  on The Chest procurement web portal at www.the-chest.org.uk\nReference number DN797010.",
        "documentType": "biddingDocuments"
      },
      {
        "id": "013053-2026",
        "url": "https://www.find-tender.service.gov.uk/Notice/013053-2026",
        "format": "text/html",
        "noticeType": "UK4",
        "description": "Tender notice on Find a Tender",
        "documentType": "tenderNotice",
        "datePublished": "2026-02-12T15:33:43Z"
      }
    ],
    "procedure": {
      "features": "This tender notice relates to the award of a public contract through a Competitive Flexible Procedure in accordance with section 20(1) and 20(2)(b) of the Procurement Act 2023.\nFor a description of the process including conditions of participation , the process for submitting initial and final tenders (including the negotiation stage) and the award criteria and assessment methodology, please refer to the documents available on the procurement web portal The Chest which can be accessed from the following link https://www.the-chest.org.uk/ .  The project reference for the opportunity is DN797010.\nThe contracting authority reserves the right to rely on section 31 PA 2023 to modify the terms of the procurement."
    },
    "legalBasis": {
      "id": "2023/54",
      "uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents",
      "scheme": "UKPGA"
    },
    "awardPeriod": {
      "endDate": "2026-04-30T23:59:59+01:00"
    },
    "description": "BACKGROUND INFORMATION\nHalton Borough Council (HBC) is a Unitary Authority based in Cheshire, North West England, comprising the main towns of Runcorn and Widnes. The Council declared a Climate Emergency on the 16th October 2019. Following the declaration, the Council developed an Action Plan which is predominantly focused on reducing the Council's own carbon production.\nThe Council has developed a number of rooftop solar PV schemes and a 1.2MWp solar farm.  Whilst these projects have been invaluable, it became apparent to the Council that larger interventions would also be required in order to meet the Council's 2040 net zero target. With this in mind, the Council commissioned a feasibility study in early 2020 to evaluate the potential to construct a solar farm on Council owned wasteland. The study concluded that the potential existed to construct a 3.62MWp solar farm on a closed landfill site located immediately north of Ditton Rd in Widnes (postcode WA8 0PG - Coordinates E: 350056, N: 385004).\nThe site was historically used as a chemical waste landfill site, before being converted to a municipal golf course (St Michael's Golf Course). The course was subsequently closed, and the site has been unused since.\nThe Council are now planning to construct a 3.62MWp solar farm at the closed landfill site, which will be connected to the existing 1.2MWp solar farm via a new 11kV link. The resulting 5.2MWp of solar PV generation will provide power to a number of council owned facilities in Widnes town via an extensive 11kV ring main which is to be installed as part of the project. The scheme will also incorporate a 2MW/4MWh battery storage scheme and a high-power electric vehicle charging hub at the Council's Lower House Lane transport depot.\nOn 1st June 2021 the Council secured a 6.1MVA export and 5.0MVA import grid connection offer from the local DNO (SP Energy Networks).\nOn 27th June 2024, the Council submitted a planning application for the project, and the application was approved on 23rd January 2025.\nDuring 2024, the Council has negotiated the necessary agreements to obtain construction access to the site.  The Council own the land on which the scheme is to be built, all of the buildings, and will own the Microgrid once it is commissioned and handed over.\nThe Council are now seeking EPC (Engineer Procure and Construct) proposals for the turn-key detailed design, installation and commissioning of the Smart Microgrid Project, which will encompass the following key components;\n(a) A 3.62MWp solar farm, including all associated building and civil engineering works.\n(b) An 11kV link between the existing 1.2MWp solar farm and the new 3.62MWp solar farm.\n(c) A 2MW/4MWh battery storage system at the new solar farm site.\n(d) An 11kV link from the new solar farm substation to a new Intake Substation located at the\nCouncil's Lower House Lane depot, including an associated horizontal drill under a major A\nRoad.\n(e) A new 33kV / 11kV Intake Substation (ISS) at the Council's Lower House Lane Depot.\n(f) New 11kV distribution substation infrastructure at four Council sites (Halton Stadium, Halton Leisure Centre, Municipal Offices and Lower House Lane Transport Depot)\n(g) A buried HV ring connecting the new Intake Substation (ISS) with the four distribution\nsubstations.\n(h) High power EV and eRCV charging infrastructure at the Lower House Lane transport depot.\n(i) A SCADA control system to enable the efficient and optimal management of the completed microgrid system and the associated generation and storage assets.\nThe Tenderer's scope will include all works required to deliver a fully compliant, safe, efficient and working installation.\nFollowing completion of the construction works. The EPC Tenderer shall be responsible for providing EPC warranty and O&M (Operations and Maintenance) services for a minimum period of two years, with options for multiple contract extensions.",
    "tenderPeriod": {
      "endDate": "2026-03-16T15:00:00Z"
    },
    "enquiryPeriod": {
      "endDate": "2026-01-27T15:00:00Z"
    },
    "aboveThreshold": true,
    "submissionTerms": {
      "languages": [
        "en"
      ],
      "electronicSubmissionPolicy": "allowed"
    },
    "procurementMethod": "open",
    "mainProcurementCategory": "works",
    "submissionMethodDetails": "The full tender pack can be accessed free of charge  via The Chest procurement web portal at https://www.the-chest.org.uk/",
    "procurementMethodDetails": "Competitive flexible procedure"
  },
  "parties": [
    {
      "id": "GB-PPON-PLTJ-1788-CBLR",
      "name": "Halton Borough Council",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKD71",
        "country": "GB",
        "locality": "Widnes",
        "postalCode": "WA8 7QF",
        "countryName": "United Kingdom",
        "streetAddress": "Municipal Building"
      },
      "details": {
        "classifications": [
          {
            "id": "publicAuthoritySubCentralGovernment",
            "scheme": "UK_CA_TYPE",
            "description": "Public authority - sub-central government"
          }
        ]
      },
      "identifier": {
        "id": "PLTJ-1788-CBLR",
        "scheme": "GB-PPON"
      },
      "contactPoint": {
        "email": "procurement@halton.gov.uk"
      }
    }
  ],
  "language": "en",
  "initiationType": "tender"
}
Complete JSON history (5 releases)
12 Feb 2026 · 013053-2026 · tenderUpdate
{
  "id": "013053-2026",
  "tag": [
    "tenderUpdate"
  ],
  "date": "2026-02-12T15:33:43Z",
  "ocid": "ocds-h6vhtk-050f2b",
  "buyer": {
    "id": "GB-PPON-PLTJ-1788-CBLR",
    "name": "Halton Borough Council"
  },
  "tender": {
    "id": "DN797010",
    "lots": [
      {
        "id": "1",
        "value": {
          "currency": "GBP",
          "amountGross": 15600000
        },
        "status": "active",
        "renewal": {
          "description": "Contract extensions for the operation and maintenance and related services.  The extension options available are for 3 years and 5 x 5 years.  A total of 6 available extensions.\nExtensions are subject to a review of performance, requirements and agreement on pricing."
        },
        "hasRenewal": true,
        "suitability": {
          "sme": true
        },
        "awardCriteria": {
          "criteria": [
            {
              "name": "Quality",
              "type": "quality",
              "numbers": [
                {
                  "number": 70,
                  "weight": "percentageExact"
                }
              ]
            },
            {
              "name": "Price",
              "type": "price",
              "numbers": [
                {
                  "number": 30,
                  "weight": "percentageExact"
                }
              ]
            }
          ]
        },
        "contractPeriod": {
          "endDate": "2029-07-31T23:59:59+01:00",
          "startDate": "2026-07-01T00:00:00+01:00",
          "maxExtentDate": "2057-05-31T23:59:59Z"
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UKD71",
            "country": "GB",
            "countryName": "United Kingdom"
          }
        ],
        "additionalClassifications": [
          {
            "id": "09310000",
            "scheme": "CPV",
            "description": "Electricity"
          },
          {
            "id": "09330000",
            "scheme": "CPV",
            "description": "Solar energy"
          },
          {
            "id": "45310000",
            "scheme": "CPV",
            "description": "Electrical installation work"
          }
        ]
      }
    ],
    "title": "Design, Build, Install and Maintenance Contract for Halton Microgrid",
    "value": {
      "currency": "GBP",
      "amountGross": 15600000
    },
    "status": "active",
    "documents": [
      {
        "id": "conflictOfInterest",
        "description": "Not published",
        "documentType": "conflictOfInterest"
      },
      {
        "id": "L-1",
        "url": "www.the-chest.org.uk",
        "description": "The full access of the tender pack is available free of charge  on The Chest procurement web portal at www.the-chest.org.uk\nReference number DN797010.",
        "documentType": "biddingDocuments"
      },
      {
        "id": "013053-2026",
        "url": "https://www.find-tender.service.gov.uk/Notice/013053-2026",
        "format": "text/html",
        "noticeType": "UK4",
        "description": "Tender notice on Find a Tender",
        "documentType": "tenderNotice",
        "datePublished": "2026-02-12T15:33:43Z"
      }
    ],
    "procedure": {
      "features": "This tender notice relates to the award of a public contract through a Competitive Flexible Procedure in accordance with section 20(1) and 20(2)(b) of the Procurement Act 2023.\nFor a description of the process including conditions of participation , the process for submitting initial and final tenders (including the negotiation stage) and the award criteria and assessment methodology, please refer to the documents available on the procurement web portal The Chest which can be accessed from the following link https://www.the-chest.org.uk/ .  The project reference for the opportunity is DN797010.\nThe contracting authority reserves the right to rely on section 31 PA 2023 to modify the terms of the procurement."
    },
    "legalBasis": {
      "id": "2023/54",
      "uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents",
      "scheme": "UKPGA"
    },
    "awardPeriod": {
      "endDate": "2026-04-30T23:59:59+01:00"
    },
    "description": "BACKGROUND INFORMATION\nHalton Borough Council (HBC) is a Unitary Authority based in Cheshire, North West England, comprising the main towns of Runcorn and Widnes. The Council declared a Climate Emergency on the 16th October 2019. Following the declaration, the Council developed an Action Plan which is predominantly focused on reducing the Council's own carbon production.\nThe Council has developed a number of rooftop solar PV schemes and a 1.2MWp solar farm.  Whilst these projects have been invaluable, it became apparent to the Council that larger interventions would also be required in order to meet the Council's 2040 net zero target. With this in mind, the Council commissioned a feasibility study in early 2020 to evaluate the potential to construct a solar farm on Council owned wasteland. The study concluded that the potential existed to construct a 3.62MWp solar farm on a closed landfill site located immediately north of Ditton Rd in Widnes (postcode WA8 0PG - Coordinates E: 350056, N: 385004).\nThe site was historically used as a chemical waste landfill site, before being converted to a municipal golf course (St Michael's Golf Course). The course was subsequently closed, and the site has been unused since.\nThe Council are now planning to construct a 3.62MWp solar farm at the closed landfill site, which will be connected to the existing 1.2MWp solar farm via a new 11kV link. The resulting 5.2MWp of solar PV generation will provide power to a number of council owned facilities in Widnes town via an extensive 11kV ring main which is to be installed as part of the project. The scheme will also incorporate a 2MW/4MWh battery storage scheme and a high-power electric vehicle charging hub at the Council's Lower House Lane transport depot.\nOn 1st June 2021 the Council secured a 6.1MVA export and 5.0MVA import grid connection offer from the local DNO (SP Energy Networks).\nOn 27th June 2024, the Council submitted a planning application for the project, and the application was approved on 23rd January 2025.\nDuring 2024, the Council has negotiated the necessary agreements to obtain construction access to the site.  The Council own the land on which the scheme is to be built, all of the buildings, and will own the Microgrid once it is commissioned and handed over.\nThe Council are now seeking EPC (Engineer Procure and Construct) proposals for the turn-key detailed design, installation and commissioning of the Smart Microgrid Project, which will encompass the following key components;\n(a) A 3.62MWp solar farm, including all associated building and civil engineering works.\n(b) An 11kV link between the existing 1.2MWp solar farm and the new 3.62MWp solar farm.\n(c) A 2MW/4MWh battery storage system at the new solar farm site.\n(d) An 11kV link from the new solar farm substation to a new Intake Substation located at the\nCouncil's Lower House Lane depot, including an associated horizontal drill under a major A\nRoad.\n(e) A new 33kV / 11kV Intake Substation (ISS) at the Council's Lower House Lane Depot.\n(f) New 11kV distribution substation infrastructure at four Council sites (Halton Stadium, Halton Leisure Centre, Municipal Offices and Lower House Lane Transport Depot)\n(g) A buried HV ring connecting the new Intake Substation (ISS) with the four distribution\nsubstations.\n(h) High power EV and eRCV charging infrastructure at the Lower House Lane transport depot.\n(i) A SCADA control system to enable the efficient and optimal management of the completed microgrid system and the associated generation and storage assets.\nThe Tenderer's scope will include all works required to deliver a fully compliant, safe, efficient and working installation.\nFollowing completion of the construction works. The EPC Tenderer shall be responsible for providing EPC warranty and O&M (Operations and Maintenance) services for a minimum period of two years, with options for multiple contract extensions.",
    "tenderPeriod": {
      "endDate": "2026-03-16T15:00:00Z"
    },
    "enquiryPeriod": {
      "endDate": "2026-01-27T15:00:00Z"
    },
    "aboveThreshold": true,
    "submissionTerms": {
      "languages": [
        "en"
      ],
      "electronicSubmissionPolicy": "allowed"
    },
    "procurementMethod": "open",
    "mainProcurementCategory": "works",
    "submissionMethodDetails": "The full tender pack can be accessed free of charge  via The Chest procurement web portal at https://www.the-chest.org.uk/",
    "procurementMethodDetails": "Competitive flexible procedure"
  },
  "parties": [
    {
      "id": "GB-PPON-PLTJ-1788-CBLR",
      "name": "Halton Borough Council",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKD71",
        "country": "GB",
        "locality": "Widnes",
        "postalCode": "WA8 7QF",
        "countryName": "United Kingdom",
        "streetAddress": "Municipal Building"
      },
      "details": {
        "classifications": [
          {
            "id": "publicAuthoritySubCentralGovernment",
            "scheme": "UK_CA_TYPE",
            "description": "Public authority - sub-central government"
          }
        ]
      },
      "identifier": {
        "id": "PLTJ-1788-CBLR",
        "scheme": "GB-PPON"
      },
      "contactPoint": {
        "email": "procurement@halton.gov.uk"
      }
    }
  ],
  "language": "en",
  "initiationType": "tender"
}
22 Dec 2025 · 085556-2025 · tenderUpdate
{
  "id": "085556-2025",
  "tag": [
    "tenderUpdate"
  ],
  "date": "2025-12-22T16:25:47Z",
  "ocid": "ocds-h6vhtk-050f2b",
  "buyer": {
    "id": "GB-PPON-PLTJ-1788-CBLR",
    "name": "Halton Borough Council"
  },
  "tender": {
    "id": "DN797010",
    "lots": [
      {
        "id": "1",
        "value": {
          "currency": "GBP",
          "amountGross": 15600000
        },
        "status": "active",
        "renewal": {
          "description": "Contract extensions for the operation and maintenance and related services.  The extension options available are for 3 years and 5 x 5 years.  A total of 6 available extensions.\nExtensions are subject to a review of performance, requirements and agreement on pricing."
        },
        "hasRenewal": true,
        "suitability": {
          "sme": true
        },
        "awardCriteria": {
          "criteria": [
            {
              "name": "Quality",
              "type": "quality",
              "numbers": [
                {
                  "number": 70,
                  "weight": "percentageExact"
                }
              ]
            },
            {
              "name": "Price",
              "type": "price",
              "numbers": [
                {
                  "number": 30,
                  "weight": "percentageExact"
                }
              ]
            }
          ]
        },
        "contractPeriod": {
          "endDate": "2029-07-31T23:59:59+01:00",
          "startDate": "2026-07-01T00:00:00+01:00",
          "maxExtentDate": "2057-05-31T23:59:59Z"
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UKD71",
            "country": "GB",
            "countryName": "United Kingdom"
          }
        ],
        "additionalClassifications": [
          {
            "id": "09310000",
            "scheme": "CPV",
            "description": "Electricity"
          },
          {
            "id": "09330000",
            "scheme": "CPV",
            "description": "Solar energy"
          },
          {
            "id": "45310000",
            "scheme": "CPV",
            "description": "Electrical installation work"
          }
        ]
      }
    ],
    "title": "Design, Build, Install and Maintenance Contract for Halton Microgrid",
    "value": {
      "currency": "GBP",
      "amountGross": 15600000
    },
    "status": "active",
    "documents": [
      {
        "id": "conflictOfInterest",
        "description": "Not published",
        "documentType": "conflictOfInterest"
      },
      {
        "id": "L-1",
        "url": "www.the-chest.org.uk",
        "description": "The full access of the tender pack is available free of charge  on The Chest procurement web portal at www.the-chest.org.uk\nReference number DN797010.",
        "documentType": "biddingDocuments"
      },
      {
        "id": "085556-2025",
        "url": "https://www.find-tender.service.gov.uk/Notice/085556-2025",
        "format": "text/html",
        "noticeType": "UK4",
        "description": "Tender notice on Find a Tender",
        "documentType": "tenderNotice",
        "datePublished": "2025-12-22T16:25:47Z"
      }
    ],
    "procedure": {
      "features": "This tender notice relates to the award of a public contract through a Competitive Flexible Procedure in accordance with section 20(1) and 20(2)(b) of the Procurement Act 2023.\nFor a description of the process including conditions of participation , the process for submitting initial and final tenders (including the negotiation stage) and the award criteria and assessment methodology, please refer to the documents available on the procurement web portal The Chest which can be accessed from the following link https://www.the-chest.org.uk/ .  The project reference for the opportunity is DN797010.\nThe contracting authority reserves the right to rely on section 31 PA 2023 to modify the terms of the procurement."
    },
    "legalBasis": {
      "id": "2023/54",
      "uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents",
      "scheme": "UKPGA"
    },
    "awardPeriod": {
      "endDate": "2026-04-30T23:59:59+01:00"
    },
    "description": "BACKGROUND INFORMATION\nHalton Borough Council (HBC) is a Unitary Authority based in Cheshire, North West England, comprising the main towns of Runcorn and Widnes. The Council declared a Climate Emergency on the 16th October 2019. Following the declaration, the Council developed an Action Plan which is predominantly focused on reducing the Council's own carbon production.\nThe Council has developed a number of rooftop solar PV schemes and a 1.2MWp solar farm.  Whilst these projects have been invaluable, it became apparent to the Council that larger interventions would also be required in order to meet the Council's 2040 net zero target. With this in mind, the Council commissioned a feasibility study in early 2020 to evaluate the potential to construct a solar farm on Council owned wasteland. The study concluded that the potential existed to construct a 3.62MWp solar farm on a closed landfill site located immediately north of Ditton Rd in Widnes (postcode WA8 0PG - Coordinates E: 350056, N: 385004).\nThe site was historically used as a chemical waste landfill site, before being converted to a municipal golf course (St Michael's Golf Course). The course was subsequently closed, and the site has been unused since.\nThe Council are now planning to construct a 3.62MWp solar farm at the closed landfill site, which will be connected to the existing 1.2MWp solar farm via a new 11kV link. The resulting 5.2MWp of solar PV generation will provide power to a number of council owned facilities in Widnes town via an extensive 11kV ring main which is to be installed as part of the project. The scheme will also incorporate a 2MW/4MWh battery storage scheme and a high-power electric vehicle charging hub at the Council's Lower House Lane transport depot.\nOn 1st June 2021 the Council secured a 6.1MVA export and 5.0MVA import grid connection offer from the local DNO (SP Energy Networks).\nOn 27th June 2024, the Council submitted a planning application for the project, and the application was approved on 23rd January 2025.\nDuring 2024, the Council has negotiated the necessary agreements to obtain construction access to the site.  The Council own the land on which the scheme is to be built, all of the buildings, and will own the Microgrid once it is commissioned and handed over.\nThe Council are now seeking EPC (Engineer Procure and Construct) proposals for the turn-key detailed design, installation and commissioning of the Smart Microgrid Project, which will encompass the following key components;\n(a) A 3.62MWp solar farm, including all associated building and civil engineering works.\n(b) An 11kV link between the existing 1.2MWp solar farm and the new 3.62MWp solar farm.\n(c) A 2MW/4MWh battery storage system at the new solar farm site.\n(d) An 11kV link from the new solar farm substation to a new Intake Substation located at the\nCouncil's Lower House Lane depot, including an associated horizontal drill under a major A\nRoad.\n(e) A new 33kV / 11kV Intake Substation (ISS) at the Council's Lower House Lane Depot.\n(f) New 11kV distribution substation infrastructure at four Council sites (Halton Stadium, Halton Leisure Centre, Municipal Offices and Lower House Lane Transport Depot)\n(g) A buried HV ring connecting the new Intake Substation (ISS) with the four distribution\nsubstations.\n(h) High power EV and eRCV charging infrastructure at the Lower House Lane transport depot.\n(i) A SCADA control system to enable the efficient and optimal management of the completed microgrid system and the associated generation and storage assets.\nThe Tenderer's scope will include all works required to deliver a fully compliant, safe, efficient and working installation.\nFollowing completion of the construction works. The EPC Tenderer shall be responsible for providing EPC warranty and O&M (Operations and Maintenance) services for a minimum period of two years, with options for multiple contract extensions.",
    "tenderPeriod": {
      "endDate": "2026-02-20T22:00:00Z"
    },
    "enquiryPeriod": {
      "endDate": "2026-01-27T15:00:00Z"
    },
    "aboveThreshold": true,
    "submissionTerms": {
      "languages": [
        "en"
      ],
      "electronicSubmissionPolicy": "allowed"
    },
    "procurementMethod": "open",
    "mainProcurementCategory": "works",
    "submissionMethodDetails": "The full tender pack can be accessed free of charge  via The Chest procurement web portal at https://www.the-chest.org.uk/",
    "procurementMethodDetails": "Competitive flexible procedure"
  },
  "parties": [
    {
      "id": "GB-PPON-PLTJ-1788-CBLR",
      "name": "Halton Borough Council",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKD71",
        "country": "GB",
        "locality": "Widnes",
        "postalCode": "WA8 7QF",
        "countryName": "United Kingdom",
        "streetAddress": "Municipal Building"
      },
      "details": {
        "classifications": [
          {
            "id": "publicAuthoritySubCentralGovernment",
            "scheme": "UK_CA_TYPE",
            "description": "Public authority - sub-central government"
          }
        ]
      },
      "identifier": {
        "id": "PLTJ-1788-CBLR",
        "scheme": "GB-PPON"
      },
      "contactPoint": {
        "email": "procurement@halton.gov.uk"
      }
    }
  ],
  "language": "en",
  "initiationType": "tender"
}
20 Nov 2025 · 075855-2025 · tenderUpdate
{
  "id": "075855-2025",
  "tag": [
    "tenderUpdate"
  ],
  "date": "2025-11-20T18:03:57Z",
  "ocid": "ocds-h6vhtk-050f2b",
  "buyer": {
    "id": "GB-PPON-PLTJ-1788-CBLR",
    "name": "Halton Borough Council"
  },
  "tender": {
    "id": "DN797010",
    "lots": [
      {
        "id": "1",
        "value": {
          "currency": "GBP",
          "amountGross": 15600000
        },
        "status": "active",
        "renewal": {
          "description": "Contract extensions for the operation and maintenance and related services.  The extension options available are for 3 years and 5 x 5 years.  A total of 6 available extensions.\nExtensions are subject to a review of performance, requirements and agreement on pricing."
        },
        "hasRenewal": true,
        "suitability": {
          "sme": true
        },
        "awardCriteria": {
          "criteria": [
            {
              "name": "Quality",
              "type": "quality",
              "numbers": [
                {
                  "number": 70,
                  "weight": "percentageExact"
                }
              ]
            },
            {
              "name": "Price",
              "type": "price",
              "numbers": [
                {
                  "number": 30,
                  "weight": "percentageExact"
                }
              ]
            }
          ]
        },
        "contractPeriod": {
          "endDate": "2029-05-31T23:59:59+01:00",
          "startDate": "2026-06-01T00:00:00+01:00",
          "maxExtentDate": "2057-05-31T23:59:59Z"
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UKD71",
            "country": "GB",
            "countryName": "United Kingdom"
          }
        ],
        "additionalClassifications": [
          {
            "id": "09310000",
            "scheme": "CPV",
            "description": "Electricity"
          },
          {
            "id": "09330000",
            "scheme": "CPV",
            "description": "Solar energy"
          },
          {
            "id": "45310000",
            "scheme": "CPV",
            "description": "Electrical installation work"
          }
        ]
      }
    ],
    "title": "Design, Build, Install and Maintenance Contract for Halton Microgrid",
    "value": {
      "currency": "GBP",
      "amountGross": 15600000
    },
    "status": "active",
    "documents": [
      {
        "id": "conflictOfInterest",
        "description": "Not published",
        "documentType": "conflictOfInterest"
      },
      {
        "id": "L-1",
        "url": "www.the-chest.org.uk",
        "description": "The full access of the tender pack is available free of charge  on The Chest procurement web portal at www.the-chest.org.uk\nReference number DN797010.",
        "documentType": "biddingDocuments"
      },
      {
        "id": "075855-2025",
        "url": "https://www.find-tender.service.gov.uk/Notice/075855-2025",
        "format": "text/html",
        "noticeType": "UK4",
        "description": "Tender notice on Find a Tender",
        "documentType": "tenderNotice",
        "datePublished": "2025-11-20T18:03:57Z"
      }
    ],
    "procedure": {
      "features": "This tender notice relates to the award of a public contract through a Competitive Flexible Procedure in accordance with section 20(1) and 20(2)(b) of the Procurement Act 2023.\nFor a description of the process including conditions of participation , the process for submitting initial and final tenders (including the negotiation stage) and the award criteria and assessment methodology, please refer to the documents available on the procurement web portal The Chest which can be accessed from the following link https://www.the-chest.org.uk/ .  The project reference for the opportunity is DN797010.\nThe contracting authority reserves the right to rely on section 31 PA 2023 to modify the terms of the procurement."
    },
    "amendments": [
      {
        "id": "075855-2025",
        "description": "The deadline date for submission of initial tenders has been extended from 9th January 2026 at 20:00 to 20th January 2026 22:00."
      }
    ],
    "legalBasis": {
      "id": "2023/54",
      "uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents",
      "scheme": "UKPGA"
    },
    "awardPeriod": {
      "endDate": "2026-04-30T23:59:59+01:00"
    },
    "description": "BACKGROUND INFORMATION\nHalton Borough Council (HBC) is a Unitary Authority based in Cheshire, North West England, comprising the main towns of Runcorn and Widnes. The Council declared a Climate Emergency on the 16th October 2019. Following the declaration, the Council developed an Action Plan which is predominantly focused on reducing the Council's own carbon production.\nThe Council has developed a number of rooftop solar PV schemes and a 1.2MWp solar farm.  Whilst these projects have been invaluable, it became apparent to the Council that larger interventions would also be required in order to meet the Council's 2040 net zero target. With this in mind, the Council commissioned a feasibility study in early 2020 to evaluate the potential to construct a solar farm on Council owned wasteland. The study concluded that the potential existed to construct a 3.62MWp solar farm on a closed landfill site located immediately north of Ditton Rd in Widnes (postcode WA8 0PG - Coordinates E: 350056, N: 385004).\nThe site was historically used as a chemical waste landfill site, before being converted to a municipal golf course (St Michael's Golf Course). The course was subsequently closed, and the site has been unused since.\nThe Council are now planning to construct a 3.62MWp solar farm at the closed landfill site, which will be connected to the existing 1.2MWp solar farm via a new 11kV link. The resulting 5.2MWp of solar PV generation will provide power to a number of council owned facilities in Widnes town via an extensive 11kV ring main which is to be installed as part of the project. The scheme will also incorporate a 2MW/4MWh battery storage scheme and a high-power electric vehicle charging hub at the Council's Lower House Lane transport depot.\nOn 1st June 2021 the Council secured a 6.1MVA export and 5.0MVA import grid connection offer from the local DNO (SP Energy Networks).\nOn 27th June 2024, the Council submitted a planning application for the project, and the application was approved on 23rd January 2025.\nDuring 2024, the Council has negotiated the necessary agreements to obtain construction access to the site.  The Council own the land on which the scheme is to be built, all of the buildings, and will own the Microgrid once it is commissioned and handed over.\nThe Council are now seeking EPC (Engineer Procure and Construct) proposals for the turn-key detailed design, installation and commissioning of the Smart Microgrid Project, which will encompass the following key components;\n(a) A 3.62MWp solar farm, including all associated building and civil engineering works.\n(b) An 11kV link between the existing 1.2MWp solar farm and the new 3.62MWp solar farm.\n(c) A 2MW/4MWh battery storage system at the new solar farm site.\n(d) An 11kV link from the new solar farm substation to a new Intake Substation located at the\nCouncil's Lower House Lane depot, including an associated horizontal drill under a major A\nRoad.\n(e) A new 33kV / 11kV Intake Substation (ISS) at the Council's Lower House Lane Depot.\n(f) New 11kV distribution substation infrastructure at four Council sites (Halton Stadium, Halton Leisure Centre, Municipal Offices and Lower House Lane Transport Depot)\n(g) A buried HV ring connecting the new Intake Substation (ISS) with the four distribution\nsubstations.\n(h) High power EV and eRCV charging infrastructure at the Lower House Lane transport depot.\n(i) A SCADA control system to enable the efficient and optimal management of the completed microgrid system and the associated generation and storage assets.\nThe Tenderer's scope will include all works required to deliver a fully compliant, safe, efficient and working installation.\nFollowing completion of the construction works. The EPC Tenderer shall be responsible for providing EPC warranty and O&M (Operations and Maintenance) services for a minimum period of two years, with options for multiple contract extensions.",
    "tenderPeriod": {
      "endDate": "2026-01-20T22:00:00Z"
    },
    "enquiryPeriod": {
      "endDate": "2025-12-18T15:00:00Z"
    },
    "aboveThreshold": true,
    "submissionTerms": {
      "languages": [
        "en"
      ],
      "electronicSubmissionPolicy": "allowed"
    },
    "procurementMethod": "open",
    "mainProcurementCategory": "works",
    "submissionMethodDetails": "The full tender pack can be accessed free of charge  via The Chest procurement web portal at https://www.the-chest.org.uk/",
    "procurementMethodDetails": "Competitive flexible procedure"
  },
  "parties": [
    {
      "id": "GB-PPON-PLTJ-1788-CBLR",
      "name": "Halton Borough Council",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKD71",
        "country": "GB",
        "locality": "Widnes",
        "postalCode": "WA8 7QF",
        "countryName": "United Kingdom",
        "streetAddress": "Municipal Building"
      },
      "details": {
        "classifications": [
          {
            "id": "publicAuthoritySubCentralGovernment",
            "scheme": "UK_CA_TYPE",
            "description": "Public authority - sub-central government"
          }
        ]
      },
      "identifier": {
        "id": "PLTJ-1788-CBLR",
        "scheme": "GB-PPON"
      },
      "contactPoint": {
        "email": "procurement@halton.gov.uk"
      }
    }
  ],
  "language": "en",
  "initiationType": "tender"
}
12 Nov 2025 · 073277-2025 · tender
{
  "id": "073277-2025",
  "tag": [
    "tender"
  ],
  "date": "2025-11-12T15:46:13Z",
  "ocid": "ocds-h6vhtk-050f2b",
  "buyer": {
    "id": "GB-PPON-PLTJ-1788-CBLR",
    "name": "Halton Borough Council"
  },
  "tender": {
    "id": "DN797010",
    "lots": [
      {
        "id": "1",
        "value": {
          "currency": "GBP",
          "amountGross": 15600000
        },
        "status": "active",
        "renewal": {
          "description": "Contract extensions for the operation and maintenance and related services.  The extension options available are for 3 years and 5 x 5 years.  A total of 6 available extensions.  \nExtensions are subject to a review of performance, requirements and agreement on pricing."
        },
        "hasRenewal": true,
        "suitability": {
          "sme": true
        },
        "awardCriteria": {
          "criteria": [
            {
              "name": "Quality",
              "type": "quality",
              "numbers": [
                {
                  "number": 70,
                  "weight": "percentageExact"
                }
              ]
            },
            {
              "name": "Price",
              "type": "price",
              "numbers": [
                {
                  "number": 30,
                  "weight": "percentageExact"
                }
              ]
            }
          ]
        },
        "contractPeriod": {
          "endDate": "2029-05-31T23:59:59+01:00",
          "startDate": "2026-06-01T00:00:00+01:00",
          "maxExtentDate": "2057-05-31T23:59:59Z"
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UKD71",
            "country": "GB",
            "countryName": "United Kingdom"
          }
        ],
        "additionalClassifications": [
          {
            "id": "09310000",
            "scheme": "CPV",
            "description": "Electricity"
          },
          {
            "id": "09330000",
            "scheme": "CPV",
            "description": "Solar energy"
          },
          {
            "id": "45310000",
            "scheme": "CPV",
            "description": "Electrical installation work"
          }
        ]
      }
    ],
    "title": "Design, Build, Install and Maintenance Contract for Halton Microgrid",
    "value": {
      "currency": "GBP",
      "amountGross": 15600000
    },
    "status": "active",
    "documents": [
      {
        "id": "conflictOfInterest",
        "description": "Not published",
        "documentType": "conflictOfInterest"
      },
      {
        "id": "L-1",
        "url": "www.the-chest.org.uk",
        "description": "The full access of the tender pack is available free of charge  on The Chest procurement web portal at www.the-chest.org.uk \nReference number DN797010.",
        "documentType": "biddingDocuments"
      },
      {
        "id": "073277-2025",
        "url": "https://www.find-tender.service.gov.uk/Notice/073277-2025",
        "format": "text/html",
        "noticeType": "UK4",
        "description": "Tender notice on Find a Tender",
        "documentType": "tenderNotice",
        "datePublished": "2025-11-12T15:46:13Z"
      }
    ],
    "procedure": {
      "features": "This tender notice relates to the award of a public contract through a Competitive Flexible Procedure in accordance with section 20(1) and 20(2)(b) of the Procurement Act 2023.\nFor a description of the process including conditions of participation , the process for submitting initial and final tenders (including the negotiation stage) and the award criteria and assessment methodology, please refer to the documents available on the procurement web portal The Chest which can be accessed from the following link https://www.the-chest.org.uk/ .  The project reference for the opportunity is DN797010.    \nThe contracting authority reserves the right to rely on section 31 PA 2023 to modify the terms of the procurement."
    },
    "legalBasis": {
      "id": "2023/54",
      "uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents",
      "scheme": "UKPGA"
    },
    "awardPeriod": {
      "endDate": "2026-04-30T23:59:59+01:00"
    },
    "description": "BACKGROUND INFORMATION \nHalton Borough Council (HBC) is a Unitary Authority based in Cheshire, North West England, comprising the main towns of Runcorn and Widnes. The Council declared a Climate Emergency on the 16th October 2019. Following the declaration, the Council developed an Action Plan which is predominantly focused on reducing the Council's own carbon production. \nThe Council has developed a number of rooftop solar PV schemes and a 1.2MWp solar farm.  Whilst these projects have been invaluable, it became apparent to the Council that larger interventions would also be required in order to meet the Council's 2040 net zero target. With this in mind, the Council commissioned a feasibility study in early 2020 to evaluate the potential to construct a solar farm on Council owned wasteland. The study concluded that the potential existed to construct a 3.62MWp solar farm on a closed landfill site located immediately north of Ditton Rd in Widnes (postcode WA8 0PG - Coordinates E: 350056, N: 385004). \nThe site was historically used as a chemical waste landfill site, before being converted to a municipal golf course (St Michael's Golf Course). The course was subsequently closed, and the site has been unused since.\nThe Council are now planning to construct a 3.62MWp solar farm at the closed landfill site, which will be connected to the existing 1.2MWp solar farm via a new 11kV link. The resulting 5.2MWp of solar PV generation will provide power to a number of council owned facilities in Widnes town via an extensive 11kV ring main which is to be installed as part of the project. The scheme will also incorporate a 2MW/4MWh battery storage scheme and a high-power electric vehicle charging hub at the Council's Lower House Lane transport depot.\nOn 1st June 2021 the Council secured a 6.1MVA export and 5.0MVA import grid connection offer from the local DNO (SP Energy Networks).\nOn 27th June 2024, the Council submitted a planning application for the project, and the application was approved on 23rd January 2025.\nDuring 2024, the Council has negotiated the necessary agreements to obtain construction access to the site.  The Council own the land on which the scheme is to be built, all of the buildings, and will own the Microgrid once it is commissioned and handed over. \nThe Council are now seeking EPC (Engineer Procure and Construct) proposals for the turn-key detailed design, installation and commissioning of the Smart Microgrid Project, which will encompass the following key components;\n(a) A 3.62MWp solar farm, including all associated building and civil engineering works.\n(b) An 11kV link between the existing 1.2MWp solar farm and the new 3.62MWp solar farm.\n(c) A 2MW/4MWh battery storage system at the new solar farm site.\n(d) An 11kV link from the new solar farm substation to a new Intake Substation located at the \nCouncil's Lower House Lane depot, including an associated horizontal drill under a major A \nRoad.\n(e) A new 33kV / 11kV Intake Substation (ISS) at the Council's Lower House Lane Depot.\n(f) New 11kV distribution substation infrastructure at four Council sites (Halton Stadium, Halton Leisure Centre, Municipal Offices and Lower House Lane Transport Depot)\n(g) A buried HV ring connecting the new Intake Substation (ISS) with the four distribution \nsubstations.\n(h) High power EV and eRCV charging infrastructure at the Lower House Lane transport depot.\n(i) A SCADA control system to enable the efficient and optimal management of the completed microgrid system and the associated generation and storage assets.\nThe Tenderer's scope will include all works required to deliver a fully compliant, safe, efficient and working installation.\nFollowing completion of the construction works. The EPC Tenderer shall be responsible for providing EPC warranty and O&M (Operations and Maintenance) services for a minimum period of two years, with options for multiple contract extensions.",
    "tenderPeriod": {
      "endDate": "2026-01-09T20:00:00Z"
    },
    "enquiryPeriod": {
      "endDate": "2025-12-18T15:00:00Z"
    },
    "aboveThreshold": true,
    "submissionTerms": {
      "languages": [
        "en"
      ],
      "electronicSubmissionPolicy": "allowed"
    },
    "procurementMethod": "open",
    "mainProcurementCategory": "works",
    "submissionMethodDetails": "The full tender pack can be accessed free of charge  via The Chest procurement web portal at https://www.the-chest.org.uk/",
    "procurementMethodDetails": "Competitive flexible procedure"
  },
  "parties": [
    {
      "id": "GB-PPON-PLTJ-1788-CBLR",
      "name": "Halton Borough Council",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKD71",
        "country": "GB",
        "locality": "Widnes",
        "postalCode": "WA8 7QF",
        "countryName": "United Kingdom",
        "streetAddress": "Municipal Building"
      },
      "details": {
        "classifications": [
          {
            "id": "publicAuthoritySubCentralGovernment",
            "scheme": "UK_CA_TYPE",
            "description": "Public authority - sub-central government"
          }
        ]
      },
      "identifier": {
        "id": "PLTJ-1788-CBLR",
        "scheme": "GB-PPON"
      },
      "contactPoint": {
        "email": "procurement@halton.gov.uk"
      }
    }
  ],
  "language": "en",
  "initiationType": "tender"
}
8 May 2025 · 019853-2025 · planning
{
  "id": "019853-2025",
  "tag": [
    "planning"
  ],
  "date": "2025-05-08T16:34:49+01:00",
  "ocid": "ocds-h6vhtk-050f2b",
  "buyer": {
    "id": "GB-PPON-PLTJ-1788-CBLR",
    "name": "Halton Borough Council"
  },
  "tender": {
    "id": "DN773969",
    "lots": [
      {
        "id": "1",
        "status": "planning",
        "contractPeriod": {
          "endDate": "2036-12-31T23:59:59Z",
          "startDate": "2026-01-01T00:00:00Z"
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UKD71",
            "country": "GB",
            "countryName": "United Kingdom"
          }
        ],
        "additionalClassifications": [
          {
            "id": "09310000",
            "scheme": "CPV",
            "description": "Electricity"
          },
          {
            "id": "09330000",
            "scheme": "CPV",
            "description": "Solar energy"
          },
          {
            "id": "31000000",
            "scheme": "CPV",
            "description": "Electrical machinery, apparatus, equipment and consumables; lighting"
          },
          {
            "id": "45000000",
            "scheme": "CPV",
            "description": "Construction work"
          }
        ]
      }
    ],
    "title": "DESIGN, BUILD, INSTALL AND MAINTENANCE FOR HALTON MICROGRID",
    "status": "planning",
    "legalBasis": {
      "id": "2023/54",
      "uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents",
      "scheme": "UKPGA"
    },
    "description": "Halton Borough Council (HBC) is conducting a Preliminary Market Engagement (PME) for design, build, install and maintenance for Halton microgrid (incorporating solar farm, battery storage, EV charging and HV distribution. The purpose of this PME is to seek input from potential suppliers within the market to inform HBC's understanding of the market. This is NOT an invitation to tender. \nHBC has developed a number of rooftop solar PV schemes and a 1.2MWp solar farm om St Michael's Golf Course, Widnes.  The Council commissioned a feasibility study in early 2020 to evaluate the potential to construct an extended solar farm on St Michael's Golf Course, Widnes. The study concluded that the potential existed to construct a 3.62MWp solar farm on a closed landfill site located immediately north of Ditton Rd in Widnes (postcode WA8 0PG - Coordinates E: 350056, N: 385004). \nThe site was historically used as a chemical waste landfill site, before being converted to a municipal golf course (St Michael's Golf Course). The course was subsequently closed, and the site has been unused since.\nThe Council are now planning to construct a 3.62MWp solar farm at the closed landfill site, which will be connected to the existing 1.2MWp solar farm via a new 11kV link. The resulting 5.2MWp of solar PV generation will provide power to a number of council owned facilities in Widnes town via an extensive 11kV ring main which is to be installed as part of the project. The scheme will also incorporate a 2MW/4MWh battery storage scheme and a high-power electric vehicle charging hub at the Council's Lower House Lane transport depot.\nInterested suppliers are required to complete the preliminary market engagement questionnaire, the questions of which can be found from page 5 of this document.   This questionnaire is made available via The Chest (www.the-chest.org.uk), the Council's e-tendering portal. The Council will only be issuing and receiving documents for this PME via The Chest. Should you have any queries about this preliminary market engagement process, please send these via The Chest's Question and Answer section for a response. \nIn compliance with the Procurement Act 2023, it is mandatory for any interested suppliers to register on the new Central Digital Platform which is part of the enhanced Find a Tender Service. Please find here a link that will take you to the website to register. Suppliers: How to register your organisation and first administrator on Find a Tender in three easy steps (HTML) - GOV.UK",
    "mainProcurementCategory": "works"
  },
  "parties": [
    {
      "id": "GB-PPON-PLTJ-1788-CBLR",
      "name": "Halton Borough Council",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKD71",
        "country": "GB",
        "locality": "Widnes",
        "postalCode": "WA8 7QF",
        "countryName": "United Kingdom",
        "streetAddress": "Municipal Building"
      },
      "details": {
        "classifications": [
          {
            "id": "publicAuthoritySubCentralGovernment",
            "scheme": "UK_CA_TYPE",
            "description": "Public authority - sub-central government"
          }
        ]
      },
      "identifier": {
        "id": "PLTJ-1788-CBLR",
        "scheme": "GB-PPON"
      },
      "contactPoint": {
        "email": "julie.leong@halton.gov.uk"
      }
    }
  ],
  "language": "en",
  "planning": {
    "documents": [
      {
        "id": "019853-2025",
        "url": "https://www.find-tender.service.gov.uk/Notice/019853-2025",
        "format": "text/html",
        "noticeType": "UK2",
        "description": "Preliminary market engagement notice on Find a Tender",
        "documentType": "marketEngagementNotice",
        "datePublished": "2025-05-08T16:34:49+01:00"
      }
    ],
    "milestones": [
      {
        "id": "engagement",
        "type": "engagement",
        "status": "scheduled",
        "dueDate": "2025-05-28T23:59:59+01:00",
        "description": "There are two parts to this preliminary market engagement process, a Microsoft Teams presentation and a questionnaire to complete and return. All details and documents are made available via The Chest which can be accessed by the following link  https://www.the-chest.org.uk/  The Chest reference for this PME is DN773969\nThe Council will only be issuing and receiving documents for this PME via The Chest. Should you have any queries about this preliminary market engagement process, please send these via The Chest's Question and Answer section for a response."
      }
    ]
  },