Official UK procurement notice
Dartmoor Multi Academy Trust Network Infrastructure Upgrade
Authority: Dartmoor Multi Academy Trust (Central government)·On behalf of: PHP Law LLP
What is being bought
Published requirement descriptionDartmoor Multi-Academy Trust strategic aim is to improve its services across 17 educational institutions, to achieve the guidelines set by the Department for Education (DfE). The initiative was prompted by the critical need for a resilient, secure, and high-performing digital infrastructure to support the Trust’s educational objectives.
NGC Networks, in collaboration with Transformative were commissioned to undertake an audit of the Switch Level Network for each school and propose an action plan to deliver the improvements needed to deliver the project outcomes.
Whilst the Trust’s aim is to deliver the improvements at all schools, this is likely to take a number of years over a phased approach due to the costs involved.
Therefore, the Trust have initially prioritised works to be completed at the following two sites, with the tender being published by the end of the Spring Term 2025, with the works to be delivered during the summer holidays 2025.
a. Holsworthy College
b. Okehampton College
Contractors are referred to the following that provides the DfE guidance that was used in the audit of IT infrastructure at each school site to identify the required standards and improvements: https://www.gov.uk/guidance/meeting-digital-and-technology-standards-in-schools-and-colleges
A programme of AD surveys is being undertaken at all schools during the Easter holidays, with any required asbestos removal works being programmed in for the first two weeks of the summer holidays. Until these surveys are available, the impact of these works won’t be fully known.
The current plan is to schedule in the IT infrastructure works for the remaining four weeks of the summer holidays. This timescale may be able to be extended if the IT infrastructure can be organised around the asbestos removal, for example, Okehampton has separate buildings on site. Or, if minimal or no asbestos removal is needed.
The programme can be extended into future holiday periods to complete the works, but the Schools must be left fully operational in the interim.
The current plan also needs to factor in the need to keep both colleges operational during the summer holidays due to central staff working, lettings and the management of exam results.
There is a virtual Q&A on the 22nd April at 11am
There are site visits, on Wednesday 16th April at Okehampton College and Thursday 17th April at Holsworthy College.
Tenderers who wish to participate are requested to register for the virtual Q&A and/or the site visits via the tendering portal.
CPV: IT services: consulting, software development, Internet and support · Installation services (except software) · Network equipment · Networks
The lotProcurement structure
single lot · value publishedLot #1CancelledRenewalPublished value£550,000
- Value
- £550,000 exc. VAT · £660,000 inc. VAT
- Extensions
- Extensions may be used to incorporate any unknown delays to the project and if any additional school installations are added into the project.
- Economic & financial standingA financial appraisal will be based upon a credit check A minimum average annual turnover over the past two years of 1.5 times the Total Contract Value.
- Technical & professional abilityPrevious Project Examples Provide details of up to three contracts to meet conditions of participation relating to technical ability The contract examples provided shall be relevant to the requirement, with a sufficient level of detail that provides confidence in the Tenderer’s established past experience in similar and relevant projects/contracts. The contracts must be within the education sector and similar complexity and working on more than one site within the project. Insurance Please confirm whether you already have, or can commit to obtain, prior to the award of the contract, the levels of insurance cover indicated below: a. Employer’s (Compulsory) Liability Insurance* = [£5m] b. Public Liability Insurance = [£10m] c. Professional Indemnity Insurance = [£2m] d. Product Liability Insurance = [£1m]
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published — the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (10)
- Proposed Solution — 20%
- Case Study — 5%
- Project Team — 5%
- Technical Capabilities — 2.5%
- Project Management — 15%
- Innovation & Scalability — 2.5%
- Support & Maintenance — 5%
- Documentation & Training — 2.5%
- Added Value — 2.5%
- Cost Price — 40%
Published award criteria (10)
- Proposed Solution
- Case Study
- Project Team
- Technical Capabilities
- Project Management
- Innovation & Scalability
- Support & Maintenance
- Documentation & Training
- Added Value
- Cost Price — Overall Total Price Holsworthy College + Okehampton College
- Economic & financial standingA financial appraisal will be based upon a credit check A minimum average annual turnover over the past two years of 1.5 times the Total Contract Value.
- Technical & professional abilityPrevious Project Examples Provide details of up to three contracts to meet conditions of participation relating to technical ability The contract examples provided shall be relevant to the requirement, with a sufficient level of detail that provides confidence in the Tenderer’s established past experience in similar and relevant projects/contracts. The contracts must be within the education sector and similar complexity and working on more than one site within the project. Insurance Please confirm whether you already have, or can commit to obtain, prior to the award of the contract, the levels of insurance cover indicated below: a. Employer’s (Compulsory) Liability Insurance* = [£5m] b. Public Liability Insurance = [£10m] c. Professional Indemnity Insurance = [£2m] d. Product Liability Insurance = [£1m]
- Price carries 40 of 100 points — a 10% discount moves about 4 points. The method statement decides this lot, not the discount.
Price arithmetic assumes straight proportional scoring — the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Goods
- Notice status
- Cancelled
- Procurement threshold
- Above threshold (FTS publication)
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Unspecified in notice
- First published
- 25 Apr 2025, 13:12 BST
- Last source update
- 25 Apr 2025, 13:12 BST
- Award evaluation window
- Submission end — 25 Jun 2025
- Authority reference
DMAT01.22- FTS notice number
2025/S 000-013331- Latest notice
- Procurement termination notice (UK12)
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-04ee90Find a Tender- Contract terms summary
- Payment Terms: 30% upfront, 40% upon delivery, 30% upon completion. A project contingency of 15% has been added to the pricing schedule to allow for any unknown changes to the installation plan and if then also results in additional works for making good, A Schedule of Rates has been included that will be used to base any contingency works on. The contingency must not be committed to without prior agreement of the Trust. The site visits and pre-site survey must be used to mitigate the use of this contingency.
- Risks
- The project programme due to the installation being restricted to the school holidays. In addition a programme of AD surveys are being completed in the Easter Holiday. This may result in asbestos removal being completed in the summer holidays which will impact the programme of works and the timescale available to complete them during the summer holiday.
How it was run
Official notice- Submission deadline
- 16 May 2025, 12:00 BST
- Clarification deadline
- 9 May 2025, 12:00 BST
- Electronic submission
- Allowed
- Accepted languages
- en
Timeline
9 published dates · Europe/London- Planning notice published18 Mar 2025, 15:17 GMT
- Market engagement24 Mar 2025, 23:59 GMTIf you would like to participate in the Preliminary Market Engagement process please email [email protected] and an Instruction Pack will be emailed to you. This will include the Introduction Information to the project, the technical specifications from the school audits and the link to the MS Form which will enable you to complete a questionnaire. In addition, there is a preliminary market engagement virtual meeting available to attend, which you can join via MS Teams, Meeting ID: 329 972 062 270 Passcode: LD28se9f. This is for Tuesday 25th March at 12 noon.
- Next notice expected4 Apr 2025, 23:59 BST
- Tender notice published7 Apr 2025, 11:22 BST
- Latest notice published25 Apr 2025, 13:12 BST
- Clarification questions by9 May 2025, 12:00 BST
- Submission deadline16 May 2025, 12:00 BST
- Award decision expected by25 Jun 2025, 23:59 BST
- Contract starts28 Jul 2025, 00:00 BST
Commercial outcome & contract awards
Published awards, contracts and bid statistics — not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| supplier not published | — | 23 Apr 2025 | CancelledThe Trust have reassessed the project following the site visits and the virtual Q&A and have considered that the risk is too high to deliver the project as planned for the summer 2025. It has therefore assessed that a significant change in project delivery approach renders the current tender process obsolete. |
Notice history
15 events · 3 releases on Find a Tender · since 18 Mar 2025- Procurement termination notice published25 Apr 2025, 13:12 BSTUK12
- Published value updated25 Apr 2025, 13:12 BSTwas £550,000
- Status changed to cancelled25 Apr 2025, 13:12 BST
- Procurement method changed25 Apr 2025, 13:12 BST
- Deadline withdrawn25 Apr 2025, 13:12 BST
- Buyer details updated25 Apr 2025, 13:12 BST
- Tender notice published7 Apr 2025, 11:22 BSTUK4
- Published value published: £550,0007 Apr 2025, 11:22 BST
- Status changed to active7 Apr 2025, 11:22 BST
- Procurement method changed7 Apr 2025, 11:22 BST
- Deadline published: 16 May 2025, 12:00 BST7 Apr 2025, 11:22 BST
- Buyer details updated7 Apr 2025, 11:22 BST
- First tender notice published7 Apr 2025, 11:22 BST
- Preliminary market engagement notice published18 Mar 2025, 15:17 GMTUK2
- First planning notice published18 Mar 2025, 15:17 GMT
Contracting authority & participating public bodies
2 public bodies on the noticeConsortium members and other public bodies
- PHP Law LLPProcuring entityConsultant
Official documents & specifications (5)
Official links; attachments are not copiedTender pack and attachments
- Bidding documents and specifications My Tenders Tendering Portal
- Technical specifications Hardware includes cabinets routers, switches, servers, and cabling Software includes operating systems, network management tools, and security applications The solution needs to meet the DfE IT Infrastructure requirements https://www.gov.uk/guidance/meeting-digital-and-technology…
Notices published for this procedure
- Procurement termination notice Procurement termination notice on Find a Tender
- Tender notice Tender notice on Find a Tender
- Preliminary market engagement notice Preliminary market engagement notice on Find a Tender