Official UK procurement notice
Criterion Quay Flow Development Technical Support Package
Authority: Milford Haven Port Authority (Public body)
What is being bought
Published requirement descriptionThis comprises: Supervision of Ground Investigation and reporting, Exemplar Design, Technical Support during main works tender and Contractor Design Check and technical support and compliance checking of the works as they are built.
Our chosen approach will be to undertake the capital works via a design and construct contract. Our appointed consultant will undertake an exemplar design which will form part of the tender package. The consultant will then assist with queries during the tender process and assist with assessment of the returned tenders. Once the contractor is appointed the consultant will then undertake an independent check of the contractor’s design to ensure compliance with the project requirements. If timing is favourable we anticipate the consultant will undertake supervision of the ground investigation and will produce the factual report.
CPV: Civil engineering support services
The lotProcurement structure
single lot · no lot value publishedLot #1The Hobbs Point Floating Offshore Wind Development Project is envisioned to support…Planned
The Hobbs Point Floating Offshore Wind Development Project is envisioned to support the deployment of floating offshore wind infrastructure in the Celtic Sea. Delivery of this project will fortify the Pembroke Dock Marine project currently in development at Pembroke Dock, which is designed to create a world class centre for green energy development, acting as a catalyst for inward investment and the development of a regional Marine Centre of Excellence for current and future technology. Delivery of Hobbs Point Floating offshore wind will support the diversification of a strategic UK fossil fuel energy hub into a centre for the renewable energy industry. This will protect both the region and UK in terms of energy security, economy and inclusivity while also working towards achieving decarbonisation targets.
Milford Haven Port Authority (PoMH), as part of its ongoing programme of development at Pembroke Port (PP) intends to rebuild and expand a facility at Criterion Way/Criterion Quay, initially to support Floating Offshore Wind (FLOW) Test and Demonstration stage projects.
The currently envisaged works comprise the following:
- Construction of a heavy lift jetty with associated mooring structures
- Dredging (substantially in rock, some possibly requiring drilling and blasting)
- Reclamation of about 2 Hectares of land over an intertidal area with anticipated beneficial use of the dredged material
- Remediation of existing land
- Surfacing of the reclaimed and remediated land with surface drainage
- Perimeter security fencing and gates
- Installation of internal electricity supplies for lighting and heavy duty power
- Provision of external services and connections
- Small ancillary buildings
- Environmental mitigation measures
The works are subject to grant funding which will have strict time limits.
Procedure terms & legal framework
From the official record · publisher note attached- Legal basis
- CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
- Procurement category
- Services
- Notice status
- Past planning notice
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Unspecified in notice
- First published
- 10 Jul 2023, 08:50 BST
- Last source update
- 10 Jul 2023, 08:50 BST
- FTS notice number
2023/S 000-019561- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-03e017Find a Tender
Publisher note: NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=133013. (WA Ref:133013)
How it was run
Official notice- Submission deadline
- —
Timeline
10 Jul 2023 → 6 Nov 2023 · 2 dates- Notice published10 Jul 2023, 08:50 BST
- Tender notice expected6 Nov 2023
Commercial outcome & contract awards
Pipeline notice- Awards (0)
- No award published
- Contracts (0)
- No contract published
- Bid statistics
- No aggregate bid statistics published
Contracting authority & participating public bodies
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.