Find a Tender
planned
Official procurement procedure
Criterion Quay Flow Development Design and Construct Works Package
Marine construction works
Published value
Not published
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: Milford Haven Port Authority: "Criterion Quay Flow Development Design and Construct Works Package". Published status: planned. Published value: Value not published. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
| Contracting Authority | Milford Haven Port Authority | Scope & Categories | Not published | Submission Window | planned No deadline published |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | Not published |
Bidder Intelligence · Authority Profile: Milford Haven Port Authority
Market Analytics
Derived from OCDS awards & bid statistics
Published history for Milford Haven Port Authority. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Competition Density
4Bids / Report
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate availablePayment Terms
Check noticePublished terms
Coverage: 8 active published awards; 2 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityMilford Haven Port Authority | Procedure methodNot published | Procurement categoryNot published |
Statusplanned | Framework / DPSNot published | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published10 Jul 2023, 08:52 BST | Last source update10 Jul 2023, 08:52 BST | Recurring procurementNot published |
ClassificationMarine construction works | ||
Delivery area | ||
OCIDocds-h6vhtk-03e01a | ||
What is being bought
We envisage this will be a contract let in one lot for the design and construction of the items listed in the introduction above. The contractor’s designer will need to submit all aspects of the design for an independent check. Construction aspects will include land remediation, strengthening and surfacing, an over water jetty, rock and sediment dredging, reclamation (with beneficial use of the dredged rock) and either sheet piling and/or a rock revetment to contain the reclaimed area. There will be a new access into the site from an existing road and there will be security gates and fencing surrounding the site.
Dredging activity will be included within the works contract.
M&E works will include site distribution of 3phase electrical power, water supplies and perimeter lighting. It is expected there will be limited requirements for water supplies to serve temporary offices, together with associated foul sewerage. Surface water drainage will be required to all non-porous areas.
What changed
From the official release history
- Status changed to planned
10 Jul 2023, 08:52 BST - Official notice release published
10 Jul 2023, 08:52 BST - Buyer information updated
10 Jul 2023, 08:52 BST
Lots and requirements (1)
Published by the contracting authority
- Lot 1 · #1Individual lot title not publishedplannedPublished valueNot publishedThe Hobbs Point Floating Offshore Wind Development Project is envisioned to support the deployment of floating offshore wind infrastructure in the Celtic Sea. Delivery of this project will fortify the Pembroke Dock Marine project currently in development at Pembroke Dock, which is designed to create a world class centre for green energy development, acting as a catalyst for inward investment and the development of a regional Marine Centre of Excellence for current and future technology. Delivery of Hobbs Point Floating offshore wind will support the diversification of a strategic UK fossil fuel energy hub into a centre for the renewable energy industry. This will protect both the region and UK in terms of energy security, economy and inclusivity while also working towards achieving decarbonisation targets. Milford Haven Port Authority (PoMH), as part of its ongoing programme of development at Pembroke Port (PP) intends to rebuild and expand a facility at Criterion Way/Criterion Quay, initially to support Floating Offshore Wind (FLOW) Test and Demonstration stage projects. The currently envisaged works comprise the following: - Construction of a heavy lift jetty with associated mooring structures - Dredging (substantially in rock, some possibly requiring drilling and blasting) - Reclamation of about 2 Hectares of land over an intertidal area with anticipated beneficial use of the dredged material - Remediation of existing land - Surfacing of the reclaimed and remediated land with surface drainage - Perimeter security fencing and gates - Installation of internal electricity supplies for lighting and heavy duty power - Provision of external services and connections - Small ancillary buildings - Environmental mitigation measures The works are subject to grant funding which will have strict time limits.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Procedure published
10 Jul 2023, 08:52 BST
Commercial outcome and competition
AwardsNo award published |
ContractsNo contract published |
Bid statisticsNo aggregate bid statistics published |
Buyer and organisations in this procedure
Milford Haven Port Authority
Contracting authority GB-FTS-12533Documents (0)
Official links; attachments are not copied
No linked documents are published
Related procedures (0)
No related procedures published