Find a TenderAwarded
Published 10 Jun 2024, 14:19 BST

Official UK procurement notice

Award Notice CP7 Independent Reporter Framework

Official notice

Authority: NETWORK RAIL INFRASTRUCTURE LIMITED (Central government)

Framework agreement5 lotsServicesCompetitive procedure with negotiationSME suitable
Framework ceiling (notional)£9,800,000envelope for 5 lots · framework ceiling, not attributable revenue
Submissions closed 5 Jul 2024awarded 13 Jan 2025
Lots 5see the lot list below
Framework period 4 yrsends 31 Dec 2028 · extension options published · starts 1 Jan 2025

What is being bought5 lots · detail below

Published requirement description

Network Rail (NR) and Office of Rail and Road (ORR) undertook an Occasional joint procurement to create the CP7 Independent Reporter Services framework, which sets out the criteria for a supplier to be qualified to bid to undertake an Independent Reporter review as an Independent Reporter.

Each Independent Reporter review is allocated to the most appropriate Lot (as determined by ORR) and only those Independent Reporters qualified to bid for contracts under that Lot will be eligible to undertake the review.

Each Lot contains a minimum of one and a maximum of three Independent Reporters who are qualified to bid for contracts within the relevant Lot. The Lots available are:

  1. Analytical Support
  2. Programme, Project, and Cost Management
  3. Asset management and Engineering & Environmental Matters
  4. Railway Operations and Performance Management
  5. Efficiency and Financial Reporting

CPV: Accounting review services · Accounting, auditing and fiscal services · Data analysis services · Environmental engineering consultancy services · Financial auditing services · Financial consultancy services · Performance review services · Project management consultancy services · Railway engineering services

How this framework works

From the published notice
Places
up to 15 suppliers · 6 bids on the busiest of 5 lots (0.4 per place) · 8 appointed
Framework period
4 yrs from 1 Jan 2025

Lots and requirements (5)Procurement structure

5 lots · all with a published value

Every one of these 3 lots carries the same published figure, £1,100,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.

Lot #1Analytical SupportCancelled 4 yrsceiling above

Analytical support, focusing on appropriate use of sensitive data and data quality.

Contract period: 1 Jan 2025 – 31 Dec 2028 (4 yrs)
Delivery: UK · United Kingdom
Extensions: Option to extend up to two years in one year incrementsVariant bids: not allowed
Lot #2Programme, Project and Cost ManagementCancelled 4 yrsPublished value£2,750,000

Programme, project and cost management assessments in large infrastructure organisations

Contract period: 1 Jan 2025 – 31 Dec 2028 (4 yrs)
Delivery: UK · UK
Extensions: Option to extend up to two years in one year incrementsVariant bids: not allowed
Lot #3Asset Management and Engineering & Environmental MattersCancelled 4 yrsPublished value£3,300,000

Asset management, engineering and environmental sustainability reviews.

Contract period: 1 Jan 2025 – 31 Dec 2028 (4 yrs)
Delivery: UK · UK
Extensions: Option to extend up to two years in one year incrementsVariant bids: not allowed
Lot #4Railway Operations and Performance ManagementCancelled 4 yrsceiling above

Performance management and operational reviews within the rail industry.

Contract period: 1 Jan 2025 – 31 Dec 2028 (4 yrs)
Delivery: UK · UK
Extensions: Option to extend up to two years in one year incrementsVariant bids: not allowed
Lot #5Efficiency and Financial ReportingCancelled 4 yrsceiling above

Financial reviews on efficiency improvements, financial risks and recommendations on

improvements.

Contract period: 1 Jan 2025 – 31 Dec 2028 (4 yrs)
Delivery: UK · UK
Extensions: Option to extend up to two years in one year incrementsVariant bids: not allowed

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
What this means for your bid
  • “Award Notice CP7 Independent Reporter Framework” is a framework: the contest is a place on its panel, up to 15 suppliers, not a single contract.

Procedure terms & legal framework

From the official record · publisher note attached
Procedure method
Competitive procedure with negotiation
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Services
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use the vehicle
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
No (one-off requirement)
First published
10 Jun 2024, 14:19 BST
Last source update
14 Jan 2025, 11:40 GMT
FTS notice number
2025/S 000-001149
Classification (CPV)
Accounting review servicesAccounting, auditing and fiscal servicesData analysis servicesEnvironmental engineering consultancy servicesFinancial auditing servicesFinancial consultancy servicesPerformance review servicesProject management consultancy servicesRailway engineering services
Delivery area
UK
Official registry OCID
ocds-h6vhtk-046ea7 Find a Tender

Publisher note: The values for each Lots are estimates. The indicative work volume per Lot is included in the tender documents, entitled "Scope of Services" This is a zero value framework, with an estimated spend of £9.8m

How it was run

Official notice
Run through: Jaggaer · Who buys & how to bid on JAGGAER
Supplier login requiredLanguage: EN
Access & registration note: Free; latest Chrome/Edge/Firefox only — corporate browsers fail

Tender documents are also served through a separate tool: https://networkrail.bravosolution.co.uk ↗

Appointment period ends
5 Jul 2024, 12:00 BST
Submission channel
{"electronicSubmission","written"}
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Timeline

5 Jul 2024 → 14 Jan 2025 · 4 dates
  1. Admission / appointment period endsperiod end, not a bid countdown
    5 Jul 2024, 12:00 BST
  2. Invitations to tender expected
    14 Aug 2024, 00:00 BST
  3. Contract starts
    1 Jan 2025
  4. Notice published
    14 Jan 2025, 11:40 GMT

Notice history

1 event · 2 releases on Find a Tender
  1. Status changed to complete
    14 Jan 2025, 11:40 GMT

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 8admitted to the panel · see the list ↓
Bids received 61 from SMEs · busiest of 5 lots
Contracts signed 14latest 13 Jan 2025

14 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.

Contracts

All 8 of these contracts carry the same published figure, £1,100,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.

  • Analytical Support

    Signed
    13 Jan 2025
    Value
    ceiling above
    Period
    … – 31 Dec 2028
    Status
    active
  • Railway Operations & Performance Management

    Signed
    13 Jan 2025
    Value
    ceiling above
    Period
    … – 31 Dec 2028
    Status
    active
  • Railway Operations & Performance Management

    Signed
    13 Jan 2025
    Value
    ceiling above
    Period
    … – 31 Dec 2028
    Status
    active
  • Railway Operations & Performance Management

    Signed
    13 Jan 2025
    Value
    ceiling above
    Period
    … – 31 Dec 2028
    Status
    active
  • Efficiency & Financial Reporting

    Signed
    13 Jan 2025
    Value
    ceiling above
    Period
    … – 31 Dec 2028
    Status
    active
  • Efficiency & Financial Reporting

    Signed
    13 Jan 2025
    Value
    ceiling above
    Period
    … – 31 Dec 2028
    Status
    active
  • Analytical Support

    Signed
    13 Jan 2025
    Value
    ceiling above
    Period
    … – 31 Dec 2028
    Status
    active
  • Analytical Support

    Signed
    13 Jan 2025
    Value
    ceiling above
    Period
    … – 31 Dec 2028
    Status
    active
  • Programme, Project & Cost Management

    Signed
    13 Jan 2025
    Value
    £2,750,000
    Period
    … – 31 Dec 2028
    Status
    active
  • Programme, Project & Cost Management

    Signed
    13 Jan 2025
    Value
    £2,750,000
    Period
    … – 31 Dec 2028
    Status
    active
  • Programme, Project & Cost Management

    Signed
    13 Jan 2025
    Value
    £2,750,000
    Period
    … – 31 Dec 2028
    Status
    active
  • Asset Management, Engineering & Environmental Matters

    Signed
    13 Jan 2025
    Value
    £3,300,000
    Period
    … – 31 Dec 2028
    Status
    active
  • Asset Management, Engineering & Environmental Matters

    Signed
    13 Jan 2025
    Value
    £3,300,000
    Period
    … – 31 Dec 2028
    Status
    active
  • Asset Management, Engineering & Environmental Matters

    Signed
    13 Jan 2025
    Value
    £3,300,000
    Period
    … – 31 Dec 2028
    Status
    active

Bid statistics published by the authority

LotBidsSMEVCSEValid bid range
1 · Analytical Support5bids · 5 electronic1——
2 · Programme, Project and Cost Management6bids · 6 electronic———
3 · Asset Management and Engineering & Environmental Matters5bids · 5 electronic1——
4 · Railway Operations and Performance Management3bids · 3 electronic———
5 · Efficiency and Financial Reporting2bids · 2 electronic1——

Contracting authority & participating public bodies

Network Rail Infrastructure Ltd

Contracting authorityCentral GovernmentBody governed by public lawRail Industry Waterloo General Offices, London, UK, SE1 8SWContact email, phone Published organisation website ↗

Dispute resolution & review bodies

  • High CourtMediation bodyReview body London

Framework contractors & participating bidders

10 commercial parties on the notice

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.