CP7 Eastern Region Renewals and Minor Enhancements
Building construction work
Building installation work
Construction work
+12 more
UK
Published value
£4,000,000,000
Submission deadline 13 May 2022, 12:00 BST
Lots published5
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: Network Rail Infrastructure Ltd: "CP7 Eastern Region Renewals and Minor Enhancements". Published status: active. Published value: £4,000,000,000. 5 published lots. Recorded submission deadline: 13 May 2022, 12:00 BST. See the official notice for participation instructions.
| Contracting Authority | Network Rail Infrastructure Ltd | Scope & Categories | Not published | Submission Window | Closed 13 May 2022, 12:00 BST |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | £4,000,000,000 |
Bidder Intelligence · Authority Profile: Network Rail Infrastructure Ltd
Market Analytics
Derived from OCDS awards & bid statistics
Published history for Network Rail Infrastructure Ltd. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Average Price Reduction
Not availableInsufficient comparable data
Competition Density
5.5Bids / Report
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate availablePayment Terms
Check noticePublished terms
Coverage: 111 active published awards; 67 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Price reduction compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityNetwork Rail Infrastructure Ltd | Procedure methodNot published | Procurement categoryNot published |
Statusactive | Framework / DPSFramework | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published7 Apr 2022, 18:38 BST | Last source update7 Apr 2022, 18:38 BST | Recurring procurementNo |
ClassificationBuilding construction work, Building installation work, Construction work, Construction work for buildings relating to railway transport, Construction work for railways and cable transport systems, High voltage installation work, Low-voltage installation work, Overhead line construction, Railway bridge construction work, Railway engineering services, Railway signalling works, Railway station construction work, Site preparation work, Track construction works, Works for complete or part construction and civil engineering work | ||
Delivery area UK | ||
OCIDocds-h6vhtk-030b8e | ||
What is being bought
Network Rail propose to procure renewals and minor enhancement adopting an integrated multi-discipline rail system approach that is flexible with a focus on productivity and passenger outcomes.
Network Rail has set 5 strategic focus areas – a railway system approach; capabilities; productivity; collaborative behaviours; and sustainability. All these focus areas support the Agile Client Eastern (ACE) Capital Delivery operating model. Further information on the ACE operating model can be found within the Procurement Documents.
Two Partnerships (North/South) will be created in the Eastern region. Key to their success will be aligned objectives and collaborative behaviours, where Network Rail will create competitive tension and adopt an incentivisation mechanism that will drive enhanced performance whilst fostering a culture of continuous improvement, quality driven outputs and delivering innovative solutions.
The partners can undertake works and/or services in relation to the scope of their Lot and in addition undertake those works as part of Work Orders led by other partners. For example, the Structures, Geotechnics and Buildings partner can undertake the Structures, Geotechnics and Buildings works associated with a Signalling or OLE Works Order.
In addition, where it provides value for money to do so for Network Rail, the partner may undertake works that are reasonably necessary to be supplied or installed contemporaneously with the Work Order. This could include but is not limited to the adjustment of Overhead Lines or track when undertaking a bridge replacement by a Lot 1 or 2 Structures, Geotechnics and Buildings partner.
The Framework terms and conditions will provide NR with the flexibility to request partners to undertake CP7 work bank projects in both the North and South partnership regions.
Network Rail is looking to appoint 14 construction partners to deliver the CP7 renewals and minor enhancement works across the Eastern Region. In addition, 5 secondary suppliers will also be appointed per Lot who sits outside the partnership. The partners will be appointed across 5 Lots as follows:-
Lot 1 Structures, Geotechnics & Buildings (North): 3 partners plus 1 secondary supplier
Lot 2 Structures, Geotechnics & Buildings (South): 3 partners plus 1 secondary supplier
Lot 3 Signalling and Telecoms North & South: 4 partners (2 per partnership region) plus 1 secondary supplier
Lot 4 Electrification & Power - Contact Systems North & South: 2 partners (1 per partnership region) plus 1 secondary supplier
Lot 5 Electrification & Power - Distribution and Plant North & South: 2 partners (1 per partnership region) plus 1 secondary supplier
The partners will be responsible for the design and construction works for the CP7 work bank for their respective Lot. The partners will be appointed via a Framework and a Partnering Agreement.
The partners may also be asked to undertake emergency works and services.
The Framework duration will be 5 years with an option to extend by a further 5 years with a 4-month mobilisation period and a further period to complete outstanding works.
The contract is divided into 5 Lots. Tenders may be submitted for a maximum of 2 Lots. The estimated total value of the Framework will be within the range of £3,500,000,000 to £4,000,000,000 for the 10-year duration.
What changed
From the official release history
- Published value updated to £4,000,000,000
7 Apr 2022, 18:38 BST - Status changed to active
7 Apr 2022, 18:38 BST - Official notice release published
7 Apr 2022, 18:38 BST - Submission deadline changed to 13 May 2022, 12:00 BST
7 Apr 2022, 18:38 BST - Status changed to planned
14 Jan 2022, 22:45 GMT - Official notice release published
14 Jan 2022, 22:45 GMT - Buyer information updated
14 Jan 2022, 22:45 GMT
Lots and requirements (5)
Published by the contracting authority
- Lot 1 · #1Structures, Geotechnics & Buildings (North)activePublished value£850,000,000Network Rail is looking to appoint construction partners to deliver the building & civils work bank. The scope of work type to be delivered includes but not limited to the following:- Building/civils and associated mechanical and electrical works for: stations, depots, maintenance delivery units and lineside buildings Structural works for: footbridges, overbridges, underbridges, tunnels, retaining walls and culverts Geotechnic works for: earthwork cuttings and embankments, rock cuttings, drainage and piling. The scope of works may also include Asbestos removal. Additional information: The lot value is for guidance only and is based on the projected spend for the 10 year framework duration.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
- Lot 2 · #2Structures, Geotechnics & Buildings (South)activePublished value£850,000,000Network Rail is looking to appoint construction partners to deliver the building & civils work bank. The scope of work type to be delivered includes but not limited to the following:- Building/civils and associated mechanical and electrical works for: stations, depots, maintenance delivery units and lineside buildings Structural works for: footbridges, overbridges, underbridges, tunnels, retaining walls and culverts Geotechnic works for: earthwork cuttings and embankments, rock cuttings, drainage and piling The scope of works may also include Asbestos removal. Additional information: The lot value is for guidance only and is based on the projected spend for the 10 year framework duration.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
- Lot 3 · #3Signalling & TelecomsactivePublished value£300,000,000Network Rail is looking to appoint construction partners to deliver the signalling and telecoms work bank. The scope of work type to be delivered includes but not limited to the following:- Refurb and partial: signal renewals, signal conversions, point conversion, track circuit conversions Refurb: ground frame conversion to Ground Switch Panel (GSP), alterations to scalable IECC / West Cad, provision of staff protection systems, location case renewals including minor alterations to signalling power supplies, TDM renewals, removal of obsolete equipment – transmission (CCTV, TDM & FDM), targeting component renewals – HABDs / REBs, Provision of FTNX / FTNX points of presence in signalling equipment rooms (inc. REBs) Partial: interlocking re-lock, interlocking re-control, re-platform of interlocking Minor works: intelligent infrastructure installations, alterations to existing Solid State Interlockings (SSI), alterations to Track Protections Systems Level crossings: level crossing Life Extension Works (LEW) for all types of crossings, level crossings renewals for all types of level crossings, conversion of mechanical winding barriers, conversion of level crossings interlockings to processor based systems Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
- Lot 4 · #4Electrification & Power - Contact SystemsactivePublished value£480,000,000Network Rail is looking to appoint construction partners to deliver the contact systems work bank. The scope of work type to be delivered includes but not limited to the following:- AC Contact systems (OLE): OHL-Structure Renewal, structural, civils, overhead line installation, OLE design, structural assessment, design, refurbishment and renewal (as required), geotechnical assessment, OLE campaign changes, Insulator renewals (public areas / general campaign changes), dropper renewals, cantilever adjustments, OLE Re-wire, contact wire renewal (including the use of High Output plant (wiring trains)), catenary wire renewal (including the use of High Output plant (wiring trains)), crossovers (including potential re-design if required), section insulator, mid-life refurbishment, carrier wire style neutral section ,OLE power connections (switch relocation / redesign) DC Contact systems: solid conductor beam refurbishment (+ bonding), alterations to existing Solid State Interlockings (SSI), alterations to Track Protections Systems Other: pantograph monitoring systems, forensic analysis (root cause analysis of failures), isolation diagram corrections and reviews, legacy equipment renewal (design knowledge required), surveys e.g. drone, point cloud, etc. for structures, tunnel renewals (fixed overhead line equipment, steelwork), SCADA / isolations, reduced clearance locations resulting in flashovers Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
- Lot 5 · #5Electrification & Power – Distribution & PlantactivePublished value£520,000,000Network Rail is looking to appoint construction partners to deliver the distribution and power work bank. The scope of work type to be delivered includes but not limited to the following:- HV non-traction distribution, HV traction distribution plant, HV circuit breakers, Switchgear units, transformers, signalling power (inc. DNO supplies), lighting and associated LV distribution, LV non-traction distribution, walkway lighting and columns., operational lighting (buffer stops etc.), Rail yard lighting and columns, Tunnel lighting, Level crossing CCTV and lighting, Lineside operational equipment and monitoring devices (e.g. wheelchex and panchax, trackside drainage pumps (including tunnel drainage pumps) and ventilation, points heating systems (inc. DNO supplies, heat retainers, remote monitoring) Swing bridge controls replacement Additional information: The lot value is for guidance only and is based on the projected spend for the 10-year framework duration.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Procedure published
7 Apr 2022, 18:38 BST - Submission deadline
13 May 2022, 12:00 BST
Commercial outcome and competition
AwardsNo award published |
ContractsNo contract published |
Bid statisticsNo aggregate bid statistics published |
Buyer and organisations in this procedure
Network Rail Infrastructure Ltd
Contracting authority GB-FTS-448Documents (0)
Official links; attachments are not copied
No linked documents are published