Find a TenderAwarded without competition
Published 24 Jan 2022, 11:03 GMT

Official UK procurement notice

Controllable Floating Module · UK public procurement notice

Official notice

Authority: Offshore Renewable Energy Catapult

GoodsAward procedure without prior publication of a call for competition
Awarded value£229,960published contract · exc. VAT
Awarded 19 Nov 2021no call for competition
Awarded to Hutchinson Engineering

What is being bought

Published requirement description

The MARLIN STAR project is the next phase in the development and commercialisation of an innovation that

will enable coastal community access to stored and transferable energy from floating renewables.

CPV: Floating structures · Miscellaneous transport equipment and spare parts

The lotProcurement structure

single lot · no lot value published
Lot #1The MARLIN STAR project assesses the market and social conditions for implementation…Awarded

The MARLIN STAR project assesses the market and social conditions for implementation of floating offshore wind energy generation, storage and transfer in Bangladesh and India. A socio-technical approach will be used to inform the design, to optimise the longevity of future installations, and to enable local operation and maintenance by the communities independently. Numerical analysis and laboratory tests will be conducted at internationally recognised research facilities.

A prototype modular floating foundation with a wind turbine will be tested in a reduced water depth 'tow-out' condition in a drydock.

The Scope of this project facilitates:

  • Researchers conducting 'in country' socio-technical research in Bangladesh and India to provide analysis on the market pathway in these countries in terms of affordability, regulatory framework and local technical skill capacity.
  • Development of a Pilot scale prototype design covering all the main engineering systems and their integration.
  • Model scale hydrodynamic testing within a specialist physical testing environment to verify design assumption and calculations. This activity will bring validation and reduce prototype build out risk.
  • Physical construction of a spar type design and demonstration of tow-out condition in a flooded drydock.

Therefore, The purpose of the Marlin Star ‘Mid-Stage’ project is the application of the controllable float module innovation to reduce build, transport, installation, and operation and maintenance costs.

Delivery: North East

Procedure terms & legal framework

From the official record
Procedure method
Award procedure without prior publication of a call for competition
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Goods
Notice status
Awarded without competition
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Direct award (no call for competition)
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
24 Jan 2022, 11:03 GMT
Last source update
24 Jan 2022, 11:03 GMT
Authority reference
DN591848
FTS notice number
2022/S 000-001977
Classification (CPV)
Floating structuresMiscellaneous transport equipment and spare parts
Delivery area
North East (UKC1)
Official registry OCID
ocds-h6vhtk-030e52 Find a Tender
Why no open competition

The products involved are manufactured purely for the purpose of research, experiment, study or development under the conditions stated in the directive

Published justification

A single source tender will ensure the floating modules delivered for the project meet the client specification and will be fit for purpose when assembled together with the Britwind Wind Turbine.

Fontier Technical (the client) has already shared the work already undertaken with Hutchinson Engineering to develop the design and manufacture of the floating modules. Hutchinson Engineering is also working with Britwind (the Wind Turbine Supplier tendered under ref ORE20/056) who is modifying the tower section to be used on the prototype energy platform.

No other reasonable alternative or substitute exists, and the absence of a competition is not the result of artificially narrowing the parameters of the requirement. In addition, the

product involved is being manufactured purely for the purpose of research and development and will not include quantity production to establish commercial viability or to recover research and development costs.

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 1
Awarded value £229,9601 contract exc. VAT
Bids received 1
Contracts signed 1latest 19 Nov 2021
Awarded toValueDateStatus
Hutchinson Engineering£229,960 †—Awarded

Contracts

Bid statistics published by the authority

BidsSMEVCSEValid bid range
1bids · 1 electronic · 1 from abroad0——

Contracting authority & participating public bodies

Offshore Renewable Energy Catapult

Contracting authorityBody governed by public lawOffshore Renewable Energy Inovo, 121 George Street, Glasgow, UK, G1 1RDContact name, email, phone

Dispute resolution & review bodies

  • Royal Courts of JusticeMediation bodyReview body London

Bidders & participating suppliers

1 commercial party on the notice

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.