Contract 91 - Dynamic Purchasing System ( DPS ) for Consultancy 2025-2027

Official notice

Authority: North Tyneside Council (Local council)

Dynamic market17 lotsServicesOpen procedure
Dynamic market estimateValue not publishedmarket-wide estimate, not attributable revenue
Submissions closed 6 Nov 2024
Lots 17see the lot list below

What is being bought17 lots · detail below

Published requirement description

The Authority is establishing a DYNAMIC PURCHASING SYSTEM (DPS) for the supply of Consultancy Services for Construction (Contract 91 - Dynamic Purchasing System for Consultancy 2025-2027)

The DPS has an initial duration of 2 years with options to extend for up to a further 2 x 12 months at the sole discretion of the Authority and is anticipated to commence Jan 2025.

Stage 1 - Compliance checking application stage and this does not any pricing. Interested suppliers simply complete the Questionnaire (application form) along with providing ALL the evidence as stated in the documents.

Stage 2 - 'Mini Competition' stage, is the request for pricing stage which when a need is identified in a Lot a request is issued to all suppliers successful to the relevant Lot via the NEPO Portal to submit a quote.

Full details are provided in the DPS documentation which is divided into the following Lots which are very high level which allows any work under the Title/ basic description to be issued as mini competition in that Lot. Further information can be found in the documents,although the information is very high level. Accreditation(s) where required, are pass or fail at the sole discretion of the Authority, are listed below each Lot

Lot 1 – Heritage & Conservation Architecture - RIBA Conservation Architect, RIBA Specialist Conservation Architect or AABC Architect Accredited in Building Conservation

Lot 2 – Tree Survey - ISA – International Society of Arboriculture

Lot 3 – Energy Assessment - BREEAM certified / CIBSE – Chartered Institute of Building Services Engineers

Lot 4 – Landscape Design - Chartered Member of the Landscape Institute

Lot 5 – Topographical / Measured Survey / Utility Survey - PUMA and / or Chartered Institution of Civil Engineering Surveyors

Lot 6 – Ecology Survey & Biodiversity Net Gain (BNG) - CIEEM – Chartered Institute of Ecology and Environmental Management

Lot 7 – Geo Environmental / Site Investigation / CMRA - CEng – Chartered Engineer / ICE – Institute of Civil Engineers, ISE – Institute of Structural Engineers or IHE – Institute of Highways Engineers

Lot 8 – Drone Inspection - Licensed professional

Lot 9 – Lighting Assessment - SLL – Society of Light and Lighting

Lot 10 – Archaeological Services - MCIfA – Member of Chartered Institute for Archaeologists

Lot 11 – Utility Management - CEng – Chartered Engineer / ICE – Institute of Civil Engineers or ISE – Institute of Structural Engineers or IHE – Institute of Highways Engineers or NRSWA (contractors)

Lot 12 – Noise Assessment & Acoustic Design Services - IOA – Institute of Acoustics

Lot 13 – 3D visualisation

Lot 14 – Damp proofing surveys - CSRT - Certified Surveyor in Remedial Treatment, CSSW - Certified Surveyor in Structural Waterproofing or CSTDB - Certificated Surveyor of Timber and Dampness in buildings

Lot 15 – Fire integrity service - IFE – Institution of Fire Safety Engineers

Lot 16 – Flood Risk Assessment (FRA) - CIWEM – Chartered Institute of Water and Environmental Management

Lot 17 – Civil and Structural Design Services - ICE - Institute of Civil Engineers

Further information relating to the operation of the DPS and the Authority Requirements are available in the Tender pack which can be downloaded immediately on registering an interest in this opportunity. Interested Suppliers must access the Tender documents for further information, which are available to download immediately in the NEPO Portal after registering an interest via the link below. Unregistered Suppliers will be re-directed to a registration page, registration is free via the link provided: procontract.due-north.com ↗ and searching via opportunities or looking at our current Tenders via:

North Tyneside Tendering Opportunities or my.northtyneside.gov.uk/category/606/tender-… ↗

  • Recurrence: Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with thes

CPV: Architectural, construction, engineering and inspection services · Forestry services · Research and development services and related consultancy services · Tree seeding

Lots and requirements (17)Procurement structure

17 lots · no lot values published
Lot #1Heritage & Conservation ArchitectureRenewal

The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025.

Stage 1 - Compliance checking application stage and this does not any pricing. Interested suppliers simply complete the Questionnaire (application form) along with providing ALL the evidence as stated in the documents.

Stage 2 - 'Mini Competition' stage, is the request for pricing stage which when a need is identified in a Lot a request is issued to all suppliers successful to the relevant Lot via the NEPO Portal to submit a quote.

The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is:

Lot 1 – Heritage & Conservation Architecture - RIBA Conservation Architect, RIBA Specialist Conservation Architect or AABC Architect Accredited in Building Conservation

Delivery: North East
Extensions: Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework. · Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework.Variant bids: not allowed
Lot #2Tree SurveyRenewal

The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025.

Stage 1 - Compliance checking application stage and this does not any pricing. Interested suppliers simply complete the Questionnaire (application form) along with providing ALL the evidence as stated in the documents.

Stage 2 - 'Mini Competition' stage, is the request for pricing stage which when a need is identified in a Lot a request is issued to all suppliers successful to the relevant Lot via the NEPO Portal to submit a quote.

The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is:

Lot 2 – Tree Survey - ISA – International Society of Arboriculture

Delivery: North East
Extensions: Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework. · Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework.Variant bids: not allowed
Lot #3Energy AssessmentRenewal

The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025.

Stage 1 - Compliance checking application stage and this does not any pricing. Interested suppliers simply complete the Questionnaire (application form) along with providing ALL the evidence as stated in the documents.

Stage 2 - 'Mini Competition' stage, is the request for pricing stage which when a need is identified in a Lot a request is issued to all suppliers successful to the relevant Lot via the NEPO Portal to submit a quote.

The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is:

Lot 3 – Energy Assessment - BREEAM certified / CIBSE – Chartered Institute of Building Services Engineers

Delivery: North East
Extensions: Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework. · Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework.Variant bids: not allowed
Lot #4Landscape Design - Chartered Member of the Landscape InstituteRenewal

The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025.

Stage 1 - Compliance checking application stage and this does not any pricing. Interested suppliers simply complete the Questionnaire (application form) along with providing ALL the evidence as stated in the documents.

Stage 2 - 'Mini Competition' stage, is the request for pricing stage which when a need is identified in a Lot a request is issued to all suppliers successful to the relevant Lot via the NEPO Portal to submit a quote.

The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is:

Lot 4 – Landscape Design - Chartered Member of the Landscape Institute

Delivery: North East
Extensions: Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework. · Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework.Variant bids: not allowed
Lot #5Topographical / Measured SurveyRenewal

The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025.

Stage 1 - Compliance checking application stage and this does not any pricing. Interested suppliers simply complete the Questionnaire (application form) along with providing ALL the evidence as stated in the documents.

Stage 2 - 'Mini Competition' stage, is the request for pricing stage which when a need is identified in a Lot a request is issued to all suppliers successful to the relevant Lot via the NEPO Portal to submit a quote.

The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is:

Lot 5 – Topographical / Measured Survey / Utility Survey - PUMA and / or Chartered Institution of Civil Engineering Surveyors

Delivery: North East
Extensions: Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework. · Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework.Variant bids: not allowed
Lot #6Ecology Survey & Biodiversity Net Gain (BNG) - CIEEM – Chartered Institute of Ecology and Environmental ManagementRenewal

The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025.

Stage 1 - Compliance checking application stage and this does not any pricing. Interested suppliers simply complete the Questionnaire (application form) along with providing ALL the evidence as stated in the documents.

Stage 2 - 'Mini Competition' stage, is the request for pricing stage which when a need is identified in a Lot a request is issued to all suppliers successful to the relevant Lot via the NEPO Portal to submit a quote.

The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is:

Lot 6 – Ecology Survey & Biodiversity Net Gain (BNG) - CIEEM – Chartered Institute of Ecology and Environmental Management

Delivery: North East
Extensions: Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework. · Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework.Variant bids: not allowed
Lot #7Geo Environmental / Site Investigation / CMRARenewal

The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025.

Stage 1 - Compliance checking application stage and this does not any pricing. Interested suppliers simply complete the Questionnaire (application form) along with providing ALL the evidence as stated in the documents.

Stage 2 - 'Mini Competition' stage, is the request for pricing stage which when a need is identified in a Lot a request is issued to all suppliers successful to the relevant Lot via the NEPO Portal to submit a quote.

The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is:

Lot 7 – Geo Environmental / Site Investigation / CMRA - CEng – Chartered Engineer / ICE – Institute of Civil Engineers, ISE – Institute of Structural Engineers or IHE – Institute of Highways Engineers

Delivery: North East
Extensions: Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework. · Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework.Variant bids: not allowed
Lot #8Drone InspectionRenewal

The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025.

Stage 1 - Compliance checking application stage and this does not any pricing. Interested suppliers simply complete the Questionnaire (application form) along with providing ALL the evidence as stated in the documents.

Stage 2 - 'Mini Competition' stage, is the request for pricing stage which when a need is identified in a Lot a request is issued to all suppliers successful to the relevant Lot via the NEPO Portal to submit a quote.

The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is:

Lot 8 – Drone Inspection - Licensed professional

Delivery: North East
Extensions: Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework. · Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework.Variant bids: not allowed
Lot #9Lighting AssessmentRenewal

The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025.

Stage 1 - Compliance checking application stage and this does not any pricing. Interested suppliers simply complete the Questionnaire (application form) along with providing ALL the evidence as stated in the documents.

Stage 2 - 'Mini Competition' stage, is the request for pricing stage which when a need is identified in a Lot a request is issued to all suppliers successful to the relevant Lot via the NEPO Portal to submit a quote.

The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is:

Lot 9 – Lighting Assessment - SLL – Society of Light and Lighting

Delivery: North East
Extensions: Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework. · Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework.Variant bids: not allowed
Lot #10Archaeological ServicesRenewal

The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025.

Stage 1 - Compliance checking application stage and this does not any pricing. Interested suppliers simply complete the Questionnaire (application form) along with providing ALL the evidence as stated in the documents.

Stage 2 - 'Mini Competition' stage, is the request for pricing stage which when a need is identified in a Lot a request is issued to all suppliers successful to the relevant Lot via the NEPO Portal to submit a quote.

The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is:

Lot 10 – Archaeological Services - MCIfA – Member of Chartered Institute for Archaeologists

Further information relating to the operation of the DPS and the Authority Requirements are

Delivery: North East
Extensions: Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework. · Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework.Variant bids: not allowed
Lot #11Utility ManagementRenewal

The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025.

Stage 1 - Compliance checking application stage and this does not any pricing. Interested suppliers simply complete the Questionnaire (application form) along with providing ALL the evidence as stated in the documents.

Stage 2 - 'Mini Competition' stage, is the request for pricing stage which when a need is identified in a Lot a request is issued to all suppliers successful to the relevant Lot via the NEPO Portal to submit a quote.

The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is:

Lot 11 – Utility Management - CEng – Chartered Engineer / ICE – Institute of Civil Engineers or ISE – Institute of Structural Engineers or IHE – Institute of Highways Engineers or NRSWA (contractors)

Delivery: North East
Extensions: Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework. · Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework.Variant bids: not allowed
Lot #12Noise Assessment & Acoustic Design ServicesRenewal

The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025.

Stage 1 - Compliance checking application stage and this does not any pricing. Interested suppliers simply complete the Questionnaire (application form) along with providing ALL the evidence as stated in the documents.

Stage 2 - 'Mini Competition' stage, is the request for pricing stage which when a need is identified in a Lot a request is issued to all suppliers successful to the relevant Lot via the NEPO Portal to submit a quote.

The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is:

Lot 12 – Noise Assessment & Acoustic Design Services - IOA – Institute of Acoustics

Delivery: North East
Extensions: Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework. · Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework.Variant bids: not allowed
Lot #133D visualisationRenewal

The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025.

Stage 1 - Compliance checking application stage and this does not any pricing. Interested suppliers simply complete the Questionnaire (application form) along with providing ALL the evidence as stated in the documents.

Stage 2 - 'Mini Competition' stage, is the request for pricing stage which when a need is identified in a Lot a request is issued to all suppliers successful to the relevant Lot via the NEPO Portal to submit a quote.

The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is:

Lot 13 - 3D visualisation

Delivery: North East
Extensions: Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework. · Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework.Variant bids: not allowed
Lot #14Damp proofing surveysRenewal

The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025.

Stage 1 - Compliance checking application stage and this does not any pricing. Interested suppliers simply complete the Questionnaire (application form) along with providing ALL the evidence as stated in the documents.

Stage 2 - 'Mini Competition' stage, is the request for pricing stage which when a need is identified in a Lot a request is issued to all suppliers successful to the relevant Lot via the NEPO Portal to submit a quote.

The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is:

Lot 14 – Damp proofing surveys - CSRT - Certified Surveyor in Remedial Treatment, CSSW - Certified Surveyor in Structural Waterproofing or CSTDB - Certificated Surveyor of Timber and Dampness in buildings

Delivery: North East
Extensions: Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework. · Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework.Variant bids: not allowed
Lot #15Fire integrity serviceRenewal

The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025.

Stage 1 - Compliance checking application stage and this does not any pricing. Interested suppliers simply complete the Questionnaire (application form) along with providing ALL the evidence as stated in the documents.

Stage 2 - 'Mini Competition' stage, is the request for pricing stage which when a need is identified in a Lot a request is issued to all suppliers successful to the relevant Lot via the NEPO Portal to submit a quote.

The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is:

Lot 15 – Fire integrity service - IFE – Institution of Fire Safety Engineers

Delivery: North East
Extensions: Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework. · Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework.Variant bids: not allowed
Lot #16Flood Risk Assessment (FRA)Renewal

The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025.

Stage 1 - Compliance checking application stage and this does not any pricing. Interested suppliers simply complete the Questionnaire (application form) along with providing ALL the evidence as stated in the documents.

Stage 2 - 'Mini Competition' stage, is the request for pricing stage which when a need is identified in a Lot a request is issued to all suppliers successful to the relevant Lot via the NEPO Portal to submit a quote.

The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is:

Lot 16 – Flood Risk Assessment (FRA) - CIWEM – Chartered Institute of Water and Environmental Management

Delivery: North East
Extensions: Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework. · Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework.Variant bids: not allowed
Lot #17Civil and Structural Design ServicesRenewal

The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025.

Stage 1 - Compliance checking application stage and this does not any pricing. Interested suppliers simply complete the Questionnaire (application form) along with providing ALL the evidence as stated in the documents.

Stage 2 - 'Mini Competition' stage, is the request for pricing stage which when a need is identified in a Lot a request is issued to all suppliers successful to the relevant Lot via the NEPO Portal to submit a quote.

The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is:

Lot 17 – Civil and Structural Design Services - ICE - Institute of Civil Engineers

Delivery: North East
Extensions: Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework. · Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework.Variant bids: not allowed

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
What this means for your bid
  • “Contract 91 - Dynamic Purchasing System ( DPS ) for Consultancy…” is a dynamic market: the contest is a place on its panel, not a single contract.

Procedure terms & legal framework

From the official record
Procedure method
Open procedure
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Services
Notice status
Closed
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Dynamic market
Who may use this agreement
Any qualifying supplier may apply while the market is open
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement

Yes · Contract Duration

The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with thes

First published
1 Oct 2024, 10:50 BST
Last source update
2 Oct 2024, 11:29 BST
Award evaluation window
1 Nov 2024 – …
Authority reference
DN745280
FTS notice number
2024/S 000-031510
Classification (CPV)
Architectural, construction, engineering and inspection servicesForestry servicesResearch and development services and related consultancy servicesTree seeding
Delivery area
North East (UKC22)
Official registry OCID
ocds-h6vhtk-04a472 Find a Tender

How it was run

Official notice
Run through: ProContract (Due North) · Who buys & how to bid on ProContract
Supplier login requiredLanguage: EN
Access & registration note: Free · short registration with manual review; public opportunity list
Admission period ends
6 Nov 2024
Submission channel
{"electronicSubmission"}
Accepted languages
en
Bid validity
120 days from the deadline
Bids opened
1 Nov 2024, 12:00 GMT
Detailed submission instructions & authority contactsFrom official release

Timeline

2 Oct 2024 → 6 Nov 2024 · 3 dates
  1. Notice published
    2 Oct 2024, 11:29 BST
  2. Bids opened
    1 Nov 2024, 12:00 GMT
  3. Admission / appointment period endsperiod end, not a bid countdown
    6 Nov 2024

Notice history

2 releases on Find a Tender
Published amendments (1 · 0 deadline changes)
WhenWhatBeforeAfterShift
—TextII.1.4The Authority is establishing a DYNAMIC PURCHASING SYSTEM (DPS) for the supply of Consultancy Services for Construction (Contract 91 - Dynamic Purchasing System for Consultancy 2025-2027) The DPS has an initial duration of 2 years with options to extend for up to a further 2 x 12 months at the sole discretion of the Authority and is anticipated to commence Jan 2025. Stage 1 - Compliance checking a…The Authority is establishing a DYNAMIC PURCHASING SYSTEM (DPS) for the supply of Consultancy Services for Construction (Contract 91 - Dynamic Purchasing System for Consultancy 2025-2027) The DPS has an initial duration of 2 years with options to extend for up to a further 2 x 12 months at the sole discretion of the Authority and is anticipated to commence Jan 2025. Stage 1 - Compliance checking a…
—Text1.3https://procontract.due-north.com/Opportunities/Index?p=1c9e782c-541e-e611-8114-000c29c9ba21&v=1https://procontract.due-north.com/Advert?advertId=0e0a72f5-237f-ef11-8130-005056b64545&p=1c9e782c-541e-e611-8114-000c29c9ba21

1 amendment published without a description.

Contracting authority & participating public bodies

North Tyneside Council

Contracting authorityLocal CouncilRegional or local authorityGeneral public services Quadrant, Cobalt Business Park, The Silverlink North, North Tyneside, North East, NE27 0BYContact name, email, phone Published organisation website ↗

Dispute resolution & review bodies

  • High Court of Justice Technology and Construction CourtReview body Rolls Building LondonContact phone