Official UK procurement notice
CEFAS25-91 ITT for provision of mudflat monitoring surveys at Hinkley Point C
Authority: Cefas
What is being bought
Published requirement descriptionThe BEEMS (British EDF Estuarine and Marine Studies) programme is funded by NNB Generation Company (HPC) Limited. Through this programme, Cefas provide authoritative scientific information on the marine and transitional waters in the vicinity of potential new build nuclear power stations and require a competent Supplier to deliver the element described below.
Cefas require services to conduct intertidal mudflat monitoring surveys for the Hinkley Point C (HPC) Nuclear New Build project to meet regulatory environmental monitoring requirements. The ongoing mudflat monitoring programme focuses on a bivalve species, the Baltic tellin, Macoma balthica. This species is a key component of the Hinkley Point mudflat community and was identified, during the HPC environmental impact assessment process, as potentially sensitive to localised seawater temperature increases brought about by the cooling water discharges from HPC. As such, biological samples and physical measurements are collected every year. The monitoring programme is focussed on mudflat intertidal areas around Bridgwater Bay and at a reference site in Wick St. Lawrence, located to the north of the bay.
Scope of Requirements:
Biological samples are collected at all the sampling stations in high shore and low shore and require the following:
a) Six replicate macrofauna samples are collected using a 0.01 m² corer to a depth of 15 cm. Each sample is placed in a sealed plastic bag and transported via private courier to a third-party laboratory for macrofauna analysis. The courier service, arranged by the Supplier, ensures delivery to the Cefas appointed UK based laboratory within 24 hours of collection. Alternative approaches to this analysis method are welcomed and should be outlined within your proposal. (Figure 2)
b) Some mud is then shovelled into a 1 mm mesh sieve and sieved on site to collect up to 75 Macoma balthica individuals by hand using tweezers for population dynamic analysis. Samples are stored in a plastic ziplock bags (Figure 3). If only small individuals are found, an additional 10 - 15 larger individual (>1 cm width) must be collected for the condition index measurements and placed in a separate ziplock bag for a condition assessment. Samples are stored in a fridge or in cool box to keep individuals alive for processing at the end of the sampling day. These are then sent to the Lowestoft Cefas Laboratory.
c) Sediment samples are collected using a 50 ml plastic syringe with a truncated tip to sample the first 2 cm of sediment as a core (five replicate). Four of the five samples (for pigment and nutrient analysis) are pooled together in a plastic ziplock bag to account for small scale variability and one sample is stored in a pot for Particle Size Analysis. Samples are stored in dry ice for the duration of the survey. These are then sent to the Lowestoft Cefas Laboratory.
Physical measurements are carried out at the low shore stations only and require the following:
a) Temperature and pressure sensors (Star-Oddi's Data Storage Tag DST centi-TD) are deployed on metal stakes (Figure 4) at the five low shore stations on stakes (see Figure 1). The sensors, which remain in situ, record temperature continuously and data need to be uploaded on a quarterly basis.
Biological samples must be collected twice a year during spring tide windows in February and in August. Physical measurement surveys must be carried out four times a year, in February, May, August and November. Note that the biological and physical measurements in February and August are completed during the same survey.
- The authority expects to re-tender this requirement around 1 Sept 2029, 23:59 BST.
CPV: Survey services
The lotProcurement structure
single lot · value publishedLot #1AwardedRenewalPublished value£170,000
- Economic & financial standing
As per Bidder Pack
- Technical & professional ability
As per Bidder Pack
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (3)
- Technical: 65%
- Price: 25%
- Social Value: 10%
Published award criteria (3)
- Technical
- Social Value
- Price
- Economic & financial standing
As per Bidder Pack
- Technical & professional ability
As per Bidder Pack
- Price carries 25 of 100 points: a 10% discount moves about 2.5 points. The method statement decides this lot, not the discount.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Services
- Notice status
- Awarded
- Procurement threshold
- Above threshold (FTS publication)
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Yes · next expected 1 Sept 2029
- First published
- 24 Nov 2025, 14:51 GMT
- Last source update
- 17 Feb 2026, 13:46 GMT
- Award evaluation window
- Submission end – 26 Jan 2026
- Authority reference
C31980- FTS notice number
2025/S 000-076538- Latest notice
- Contract details notice (UK7)
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-05e78eFind a Tender- Contract terms summary
As per Bidder Pack
- Risks
Prolonged Adverse Weather.
Due to tidal limitations on the surveys, prolonged adverse weather could impact the ability to obtain the dataset for a specific month.
This could result in additional costs and/or contract extension in order to meet the requirements.
Unable to address the risk upfront as weather is beyond control of Buyer or Supplier.
Proportionate mitigation for some weather risk is provided for in the Contract.
Risk assigned to both parties.
Change in frequency of survey requirements.
Due to changing requirements from Hinkley Point C, frequency or timings of surveys could change.
This could result in additional costs in order to meet the requirements.
Unable to address the risk upfront as neither Buyer or Supplier has control over the Hinkley Point C project planning or regulatory requirements.
Proportionate mitigations provided for in the Contract.
Risk assigned to Buyer.
How it was run
Official notice- Submission deadline
- 7 Jan 2026, 12:00 GMT
- Clarification deadline
- 18 Dec 2025, 17:00 GMT
- Submission channel
- Official e-sourcing portal
- Electronic submission
- Allowed
- Accepted languages
- en
atamis-9529.my.site.com/s/Welcome ↗
All bids to be submitted via the above eProcurement system.
Timeline
24 Nov 2025 → 17 Feb 2026 · 8 dates- Tender notice published332 days ago24 Nov 2025, 14:51 GMT
- Clarification questions by308 days ago18 Dec 2025, 17:00 GMT
- Submission deadline288 days ago7 Jan 2026, 12:00 GMT
- Assessment summaries sent276 days ago20 Jan 2026
- Award decision expected by269 days ago26 Jan 2026, 23:59 GMT
- Standstill ends266 days ago29 Jan 2026, 23:59 GMT
- Contract starts256 days ago9 Feb 2026
- Latest notice published247 days ago17 Feb 2026, 13:46 GMT
Notice history
5 events · 3 releases on Find a Tender · since 24 Nov 2025- Tender notice published24 Nov 2025, 14:51 GMTUK4
- Contract award notice published20 Jan 2026, 12:45 GMTUK6
- Status changed to complete20 Jan 2026, 12:45 GMT
- Contract signature expected2 Feb 2026, 23:59 GMTscheduled
- Contract details notice published17 Feb 2026, 13:46 GMTUK7
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| Marine Science Support LtdSMECEFAS25-91 Contract for the provision of mudflat monitoring surveys at Hinkley Point C2 Feb 2026 – 31 Dec 2028 · up to 31 Dec 2030Extensions: 2 x 12 month options | £250,000 | 20 Jan 2026standstill to 29 Jan 2026 | Standstill |
| Marine Science Support LtdSME | £300,000 † | — | Awarded |
Contracts
CEFAS25-91 Contract for provision of mudflat monitoring surveys at Hinkley Point C for the BEEMS programme · Marine Science Support LtdSME
- Signed
- 17 Feb 2026
- Value
- £300,000
- Period
- 18 Feb 2026 – 31 Dec 2028 · up to 31 Dec 2030 with extensions
- Status
- active
- Extensions
- 2 x 12 months
No agreed KPIs: Specification of Requirements sets out the deliverables in sufficient detail, KPIs not required for this Contract
Bid statistics published by the authority
| Bids | SME | VCSE | Valid bid range |
|---|---|---|---|
| 2final-stage tenders | 2 | 0 | — |
Contracting authority & participating public bodies
Bidders & participating suppliers
1 commercial party on the notice- Marine Science SupportAwarded supplier
Official documents & specifications (3)
Official links; attachments are not copiedNotices published for this procedure
- Contract details notice Contract details notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Tender notice Tender notice on Find a Tender