Official UK procurement notice
Bogie Framework Repairs and Overhaul for Engineering Vehicles
Authority: Transport for London (Public body)
What is being bought
Published requirement descriptionThis contract award notice is issued in accordance with the UCR 2016 regulations to notify the market of the award of a contract for the provision of a requirement for the repairs and overhaul of 44 battery locomotive bogie framework to support the Engineering Vehicles maintenance schedule of works.
CPV: Railway transport services
The lotProcurement structure
single lot · no lot value publishedLot #1The procurement was conducted in accordance with the TfL's procurement procedures,…Awarded
The procurement was conducted in accordance with the TfL's procurement procedures, following an negotiated procedure with call for competition. The tender process comprising sequential technical and commercial evaluation stages. All submitted bids were first assessed against the published technical criteria to confirm compliance and evaluate quality, methodology, and capability. Bidders meeting the minimum technical thresholds were then progressed to the commercial evaluation, where pricing submissions were reviewed to determine overall value for money in line with the stated evaluation framework. The combined results of the technical and commercial assessments were used to derive the final weighted scores, with the highest‑scoring compliant bidder selected for contract award.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (2)
- Technical: 60%
- Commercial: 40%
Published award criteria (2)
- Technical: 60
- Commercial: 40
- Price carries 40 of 100 points: a 10% discount moves about 4 points. The method statement decides this lot, not the discount.
- “Bogie Framework Repairs and Overhaul for Engineering Vehicles” is a framework: the contest is a place on its panel, not a single contract.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Negotiated procedure with prior call for competition
- Legal basis
- CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
- Procurement category
- Services
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 3 Mar 2026, 15:15 GMT
- Last source update
- 3 Mar 2026, 15:37 GMT
- FTS notice number
2026/S 000-019111- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-06613aFind a Tender
How it was run
Official notice- Appointment period ends
- —
- Submission channel
- {"written"}
- Accepted languages
- en
Notice history
2 events · 2 releases on Find a Tender · since 3 Mar 2026- Status changed to complete3 Mar 2026, 15:37 GMT
- Procurement method changed3 Mar 2026, 15:37 GMT
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast1 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
Repair and Overhaul of the Battery Locomotive Bogie Framework
- Signed
- 17 Oct 2025
- Value
- £2,186,220
- Status
- active
Contracting authority & participating public bodies
Framework contractors & participating bidders
1 commercial party on the notice- William Cook Rail LimitedFramework contractor
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.