Museum of Two Halves Project, Wrexham - Enabling and Shell & Core Works Package

Official notice

Authority: Wrexham County Borough Council (Local council)

WorksOpen procedureSME suitable
Published estimate£4,000,000≈ £1.5m / year
Submissions closed 15 Nov 2023awarded 6 Aug 2024
Awarded to SWG Construction (Build and Renovate) Ltd4 awards
Contract term 2 yrs 7 moends 12 Dec 2026 · starts 20 May 2024

What is being bought

Published requirement description

Award of contract for appoinment of a principle building contractor for the Base Build Construction Works (Shell & Core) for the refurbishment of the Grade II Listed Wrexham County Borough Museum & Archives building (County Buildings, Regent Street, Wrexham) as part of the Museum of Two Halves (MoTH) project. The Museum of Two Halves will incorporate a new National Football Museum for Wales (Amgueddfa Bêl-droed Cymru) and refreshed Wrexham Museum (Amgueddfa Wrecsam).

CPV: Building construction work

The lotProcurement structure

single lot · value published
Lot #1Appointment of a principle building contractor for the Base Build Construction Works…Awarded 2 yrs 7 moPublished value£4,000,000

Appointment of a principle building contractor for the Base Build Construction Works (Shell & Core) for the refurbishment of the Grade II Listed Wrexham County Borough Museum & Archives building (County Buildings, Regent Street, Wrexham) as part of the Museum of Two Halves (MoTH) project. The Museum of Two Halves will incorporate a new National Football Museum for Wales (Amgueddfa Bêl-droed Cymru) and refreshed Wrexham Museum (Amgueddfa Wrecsam).

This procurement process had two stages. First there was a Pre-Qualification Questionnaire Stage (PQQ) (pqq_33477), following which a shortlist of the 6 highest scoring bidders were progressed to Invitation to Tender Stage (ITT) (itt_107461). The procurement process was hosted on the eTenderWales (Bravo Solutions) online e-sourcing portal (etenderwales.bravosolution.co.uk ↗).

This contract modification is to notify an increase in the contract price to GBP 5,540,000.00 (all figures excluding VAT). This accounts for client instructed amends, variations, adjustments and valuation. Client scheme amends for additional works could not have been foreseen. Many amends arose during the works due to the challenging nature of the old historic building. Changing contractor in the middle of the works was unviable due to economic (switching would cause significant inconvenience and duplication of costs) and technical reasons (requirements to meet grant funder timescales). The changes do not alter the overall nature of the contract. The project reached Practical Completion 08/05/26. 12-month defects rectification period ends 08/05/2027.

Contract period: 20 May 2024 – 12 Dec 2026 (2 yrs 7 mo)
Delivery: Wales · Wrexham Museum, County Buildings, Regent St, Wrexham LL11 1RB
Variant bids: not allowed

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
Quality: 65%Price: 35%
Published sub-criteria (2)
  • Technical / Quality Questions: 65%
  • price: 35%
Published award criteria (2)
  • Technical / Quality Questions: 65
  • Price: 35
Conditions of participation1
  • Suitability

    See tender documentation

What this means for your bid
  • Price carries 35 of 100 points: a 10% discount moves about 3.5 points. The method statement decides this lot, not the discount.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record · publisher note attached
Procedure method
Open procedure
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Works
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
No (one-off requirement)
First published
17 Oct 2023, 09:42 BST
Last source update
24 Jul 2026, 11:46 BST
Award evaluation window
9 Feb 2024 – …
Authority reference
Proc-23-26
FTS notice number
2026/S 000-070202
Classification (CPV)
Building construction work
Delivery area
Wales (UKL23)
Official registry OCID
ocds-h6vhtk-040c90 Find a Tender
Contract terms
Electronic trading
e-invoicing allowed · electronic ordering · electronic payment
Performance terms

Please see procurment documentation

Publisher note: This contract modification is to notify an increase in the contract price to GBP 5,540,000.00 (all figures excluding VAT). This accounts for client instructed amends, variations, adjustments and valuation. Client scheme amends for additional works could not have been foreseen. Many amends arose during the works due to the challenging nature of the old historic building. Changing contractor in the middle of the works was unviable due to economic (switching would cause significant inconvenience and duplication of costs) and technical reasons (requirements to meet grant funder timescales). The changes do not alter the overall nature of the contract. The project reached Practical Completion 08/05/26. 12-month defects rectification period ends 08/05/2027. (WA Ref:168307)

How it was run

Official notice
Run through: Jaggaer · Who buys & how to bid on Sell2Wales
Supplier login requiredLanguage: EN
Access & registration note: Free; latest Chrome/Edge/Firefox only — corporate browsers fail

Tender documents are also served through a separate tool: https://etenderwales.bravosolution.co.uk/ ↗

Submission deadline
15 Nov 2023, 17:00 GMT
Submission channel
{"electronicSubmission"}
Accepted languages
en
Participation fee
document
Bids opened
9 Feb 2024, 17:00 GMT
Detailed submission instructions & authority contactsFrom official release

Timeline

15 Nov 2023 → 24 Jul 2026 · 4 dates
  1. Submission deadline
    15 Nov 2023, 17:00 GMT
  2. Bids opened
    9 Feb 2024, 17:00 GMT
  3. Contract starts
    20 May 2024, 00:00 BST
  4. Notice published83 days ago
    24 Jul 2026, 11:46 BST

Notice history

1 event · 5 releases on Find a Tender
  1. Status changed to complete
    7 Aug 2024, 08:52 BST
Routine re-releases (5)
  • 2024-08: 1 release · 7 Aug 2024
  • 2023-10: 1 release · 17 Oct 2023

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 4
Awarded value £20,346,9894 contracts exc. VAT
Bids received 44 from SMEs
Contracts signed 4latest 6 Aug 2024
Awarded toValueDateStatus
SWG Construction (Build and Renovate) LtdSMESubcontracting: Mechanical, Electrical, Stone repairs, Steel windows, Ceilings & Partitions, Steelwork, Roller shutter doors, Soft flooring, Zinc Roofing, Demolition, Lift, Render, Screed, Groundworks, Ceramic Tiling, Resin Bound Surfacing, Decoration, Masonry Repairs, Handrail, Staircase, Tarmac, Sanitary, IPS Curtain Walling, Blinds, Fencing, Guttering, Concrete Cutting, Kitchens Metal Decking, Landscaping, Folding Partitions, Hardwood Flooring, Intumescent Paint, Lift Removal, Single Ply roofing, Mansafe, Whiterock, Window Film, Specialist Finishes, Security Grills & Doors, Asbestos Survey, Structural Glazing.——Awarded
SWG Construction (Build and Renovate) LtdSME +1 morejoint award——Awarded
SWG Construction (Build and Renovate) LtdSMEMuseum of Two Halves – Base Build Construction Works (Shell & Core)——Awarded
SWG Construction (Build and Renovate) LtdSME——Awarded

Contracts

  • Contract 024765-2024-Proc-23-26; CR-2905-1 · SWG Construction (Build and Renovate) LtdSME

    Signed
    6 Aug 2024
    Value
    £4,174,397
    Period
    … – 12 Dec 2026
    Status
    active
  • Museum of Two Halves Project, Wrexham - Enabling and Shell & Core Works Package · SWG Construction (Build and Renovate) LtdSME +1 more

    Signed
    6 Aug 2024
    Value
    £5,196,074
    Period
    20 May 2024 – 9 Mar 2027
    Status
    active
    • Change This contract modification is to notify an increase in the contract price from GBP 4,174,397.04 to GBP 5,196,074.46 (all figures excluding VAT). This is to incorporate a number of unanticipated client scheme amends for additional works that could not have been foreseen and a resulting extended build programme. Many of these amends arose during the works due to the challenging nature of the old historic building. Changing contractor in the middle of the works was unviable due to economic (switching would cause significant inconvenience and duplication of costs) and technical reasons (requirements to meet grant funder timescales). The changes do not alter the overall nature of the contract. The End of Defects Liability Period has been extended to 9th March 2027., Need for additional works, services or supplies by the original contractor/concessionaire: This contract modification is to notify an increase in the contract price from GBP 4,174,397.04 to GBP 5,196,074.46 (all figures excluding VAT). This is to incorporate a number of unanticipated client scheme amends for additional works that could not have been foreseen and a resulting extended build programme. Many of these amends arose during the works due to the challenging nature of the old historic building. Changing contractor in the middle of the works was unviable due to economic (switching would cause significant inconvenience and duplication of costs) and technical reasons (requirements to meet grant funder timescales). The changes do not alter the overall nature of the contract. The End of Defects Liability Period has been extended to 9th March 2027.
  • Museum of Two Halves – Base Build Construction Works (Shell & Core) · SWG Construction (Build and Renovate) LtdSME

    Signed
    6 Aug 2024
    Value
    £5,436,517
    Period
    20 May 2024 – 8 May 2027
    Status
    active
    • Change This contract modification is to notify an increase in the contract price to GBP 5,436,517.49 (all figures excluding VAT). This is to incorporate a number of unanticipated client scheme amends for additional works that could not have been foreseen and a resulting extended build programme. Many of these amends arose during the works due to the challenging nature of the old historic building. Changing contractor in the middle of the works was unviable due to economic (switching would cause significant inconvenience and duplication of costs) and technical reasons (requirements to meet grant funder timescales). The changes do not alter the overall nature of the contract. The project reached Practical Completion 08/05/26. 12-month defects rectification period ends 08/05/2027., Need for additional works, services or supplies by the original contractor/concessionaire: This contract modification is to notify an increase in the contract price to GBP 5,436,517.49 (all figures excluding VAT). This is to incorporate a number of unanticipated client scheme amends for additional works that could not have been foreseen and a resulting extended build programme. Many of these amends arose during the works due to the challenging nature of the old historic building. Changing contractor in the middle of the works was unviable due to economic (switching would cause significant inconvenience and duplication of costs) and technical reasons (requirements to meet grant funder timescales). The changes do not alter the overall nature of the contract. The project reached Practical Completion 08/05/26. 12-month defects rectification period ends 08/05/2027.
  • Museum of Two Halves Project, Wrexham - Enabling and Shell & Core Works Package · SWG Construction (Build and Renovate) LtdSME

    Signed
    6 Aug 2024
    Value
    £5,540,000
    Period
    20 May 2024 – 8 May 2027
    Status
    active
    • Change This contract modification is to notify an increase in the contract price to GBP 5,540,000.00 (all figures excluding VAT). This accounts for client instructed amends, variations, adjustments and valuation. Client scheme amends for additional works could not have been foreseen. Many amends arose during the works due to the challenging nature of the old historic building. Changing contractor in the middle of the works was unviable due to economic (switching would cause significant inconvenience and duplication of costs) and technical reasons (requirements to meet grant funder timescales). The changes do not alter the overall nature of the contract. The project reached Practical Completion 08/05/26. 12-month defects rectification period ends 08/05/2027., Need for additional works, services or supplies by the original contractor/concessionaire: This contract modification is to notify an increase in the contract price to GBP 5,540,000.00 (all figures excluding VAT). This accounts for client instructed amends, variations, adjustments and valuation. Client scheme amends for additional works could not have been foreseen. Many amends arose during the works due to the challenging nature of the old historic building. Changing contractor in the middle of the works was unviable due to economic (switching would cause significant inconvenience and duplication of costs) and technical reasons (requirements to meet grant funder timescales). The changes do not alter the overall nature of the contract. The project reached Practical Completion 08/05/26. 12-month defects rectification period ends 08/05/2027.

Bid statistics published by the authority

BidsSMEVCSEValid bid range
4bids · 4 electronic · 4 from abroad4——

Contracting authority & participating public bodies

Wrexham County Borough Council

Contracting authorityLocal CouncilRegional or local authorityGeneral public services Commissioning Procurement and Contract Management Unit, Lampbit Street, Wrexham, Wales, LL11 1ARContact email, phone Published organisation website ↗

Dispute resolution & review bodies

  • High CourtReview body LondonContact phone

Bidders & participating suppliers

2 commercial parties on the notice

Official documents & specifications (2)

Official links; attachments are not copied

Tender pack and attachments

  • Economic and financial selection criteriatenderEconomic and financial selection criteria
  • Technical selection criteriatenderTechnical selection criteria