Find a Tender
planned
Official procurement procedure
96TS Jubilee Underframe Modification Project- Drawgear
Railway and tramway locomotives and rolling stock and associated parts
Published value
Not published
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: Transport for London: "96TS Jubilee Underframe Modification Project- Drawgear". Published status: planned. Published value: Value not published. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
| Contracting Authority | Transport for London | Scope & Categories | Not published | Submission Window | planned No deadline published |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | Not published |
Bidder Intelligence · Authority Profile: Transport for London
Market Analytics
Derived from OCDS awards & bid statistics
Published history for Transport for London. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Average Price Reduction
Not availableInsufficient comparable data
Competition Density
5.4Bids / Report
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate availablePayment Terms
Check noticePublished terms
Coverage: 15 active published awards; 14 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Price reduction compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityTransport for London | Procedure methodNot published | Procurement categoryNot published |
Statusplanned | Framework / DPSNot published | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published28 Jun 2021, 17:01 BST | Last source update28 Jun 2021, 17:01 BST | Recurring procurementNot published |
ClassificationRailway and tramway locomotives and rolling stock and associated parts | ||
Delivery area | ||
OCIDocds-h6vhtk-02c10c | ||
What is being bought
The Jubilee line Underframe Modifications Project (JUMP) is currently undertaking an option definition/feasibility exercise to correct structural and drawgear issues on the Jubilee line fleet. This questionnaire is the start of the project’s early market engagement to inform the options and understand the market capability and capacity to deliver a solution.
At the feasibility stage JUMP assumes that a contract will be awarded to a single supplier that will include the following works:
• Modify or replace the drawgear release elements across the entire Jubilee line fleet (except for DM Autocoupler positions). Options include, but are not limited to:
o Redesign of current mechanism
o Replacement of drawgear with alternative design
• To demonstrate that the proposed solution works in a collision scenario and does not fail in normal operations
• To demonstrate adequate proof and fatigue load requirements will be met through appropriate calculation at the design stage
• Production of prototype units for testing and analysis
• Static and dynamic testing of proposed solution to provide evidence that proof and fatigue load requirements have been met
• Manufacture of production units to replace entire fleet (except for DM Autocoupler positions)
• Replace coupler support bracket and inner longitudes across the entire fleet
What changed
From the official release history
- Status changed to planned
28 Jun 2021, 17:01 BST - Official notice release published
28 Jun 2021, 17:01 BST - Buyer information updated
28 Jun 2021, 17:01 BST
Lots and requirements (1)
Published by the contracting authority
- Lot 1 · #1Individual lot title not publishedplannedPublished valueNot publishedThe Jubilee line Underframe Modifications Project (JUMP) is currently undertaking an option definition/feasibility exercise to correct structural and drawgear issues on the Jubilee line fleet. This questionnaire is the start of the project’s early market engagement to inform the options and understand the market capability and capacity to deliver a solution. At the feasibility stage JUMP assumes that a contract will be awarded to a single supplier that will include the following works: • Modify or replace the drawgear release elements across the entire Jubilee line fleet (except for DM Autocoupler positions). Options include, but are not limited to: o Redesign of current mechanism o Replacement of drawgear with alternative design • To demonstrate that the proposed solution works in a collision scenario and does not fail in normal operations • To demonstrate adequate proof and fatigue load requirements will be met through appropriate calculation at the design stage • Production of prototype units for testing and analysis • Static and dynamic testing of proposed solution to provide evidence that proof and fatigue load requirements have been met • Manufacture of production units to replace entire fleet (except for DM Autocoupler positions) • Replace coupler support bracket and inner longitudes across the entire fleetContract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Procedure published
28 Jun 2021, 17:01 BST
Commercial outcome and competition
AwardsNo award published |
ContractsNo contract published |
Bid statisticsNo aggregate bid statistics published |
Buyer and organisations in this procedure
Transport for London
Contracting authority GB-FTS-2264Documents (0)
Official links; attachments are not copied
No linked documents are published
Related procedures (0)
No related procedures published