Find a TenderAwardedContract award notice
Published 3 Nov 2025, 16:06 GMT

Official UK procurement notice

28-32 Flexible Procurement and Supply of Gas and/or Electricity

Official notice

Authority: Cantium Business Solutions Limited (Public body)

Framework agreement3 lotsGoodsOpen procedureAbove thresholdSME suitable
Framework ceiling (notional)£10,000,000,000initial estimate £3,100,000,000 · framework ceiling, not attributable revenue · 1 value update
Submissions closed 27 Mar 2026awarded 31 Jul 2026
Award (standstill) to EDF Energy Customers Limited +8 more3 awards
Framework period 6 yrsends 30 Sept 2032 · up to 30 Sept 2033 with extensions · starts 1 Oct 2026

What is being bought3 lots · detail below

Published requirement description

The Contracting Authority will establish a single, closed Framework Agreement for the flexible procurement and supply of Gas and/or Electricity, as well as Net Zero Energy related Innovation Solutions, to public sector organisations across the United Kingdom.

Following comprehensive market engagement, the framework structure has been confirmed and will comprise three distinct lots. Please be advised that the estimated value of the Framework, and the individual Lots, represent a greater value than current spend, but account for potential growth in customer volumes and energy costs.

Lot 1: Flexible Procurement and Supply of Electricity with Additional Services (covering Metered and Unmetered Electricity)

Lot 2: Flexible Procurement and Supply of Natural Gas with Additional Services

Lot 3: Supply of Innovation Solutions relating to renewable energy and flexibility services

The framework will support flexible procurement strategies, and offer two service levels to Participating Authorities. A Procurement Only Service Option (POSO) and a Fully Managed (FM) Service. Additional services within scope include:

Metering and data services (Meter Operations, Data Collection & Aggregation, AMR provision)

Net zero and renewable energy solutions (including PPAs, REGO-backed supply, demand-side response)

Virtual PPA facilitation and access to intraday electricity markets

Small generation opportunities (Smart Export Guarantee, Feed-in Tariff)

Innovation solutions for renewable energy and flexibility services

The framework will provide Participating Authorities with access to competitive, flexible energy procurement that supports their net zero commitments and delivers best value.

Framework Operation: Suppliers will be evaluated and ranked independently for each lot based on their tender responses. For Lots 1 and 2, one Primary supplier and one or more Secondary Suppliers will be awarded positions (pending meeting of minimum requirements for those Lots) and all suppliers on Lot 3 who meet the minimum requirements of the tender will be awarded positions. Suppliers will be ranked as either Primary or Secondary suppliers based on their evaluation scores for Lots 1 and 2, with Primary Suppliers being offered first opportunity for any Awards Without Competition via the framework.

Call-off procedures: Participating Authorities may award call-off contracts through either:

Award Without Competition to the Primary Supplier (highest-scoring supplier per lot), who will be given first consideration for call-off contracts; or

Award Without Competition to a Secondary Supplier where the Participating Authority has specific requirements that cannot be met by the Primary Supplier, or where other valid reasons apply; or

Further-competition among all framework suppliers capable of meeting the specific requirements.

Pricing determination: Prices for call-off contracts will be determined through the suppliers' framework pricing submissions and the specific requirements of the Participating Authority (for direct awards) or through competitive tendering in mini-competitions.

Supplier performance and transfer mechanisms: The Contracting Authority reserves the right to facilitate the transfer of Participating Authorities to alternative framework suppliers in circumstances including but not limited to: material supplier underperformance, supplier failure, force majeure, or where a Participating Authority's needs can only be served by an alternative supplier. Secondary suppliers provide essential resilience and optionality throughout the framework term.

The Contracting Authority reserves the right to remove or suspend suppliers from the framework where performance issues are not addressed satisfactorily in accordance with the dispute resolution procedures.

There is no restriction on the number of Lots a single supplier may be awarded, enabling the appointment of a single primary supplier across multiple Lots where this represents best value and meets strategic requirements.

CPV: Electrical services · Electricity · Energy and related services · Fuels · Natural gas · Petroleum products, fuel, electricity and other sources of energy

How this framework works

From the published notice
Type
Closed framework
Call-offs
call-offs may be awarded directly or by further competition
Bids received
6 bids on the busiest of 3 lots · 9 suppliers appointed
Framework period
6 yrs · up to 7 yrs from 1 Oct 2026
Published description of the framework

Suppliers will be evaluated and ranked independently for each lot based on their tender responses. Awards will be made to all suppliers meeting the minimum requirements, with suppliers ranked as either Primary or Secondary based on their evaluation scores.

Call-off procedures: Participating Authorities may award call-off contracts through either:

Direct award to the Primary Supplier (highest-scoring supplier per lot), who will be given first consideration for call-off contracts; or

Direct award to a Secondary Supplier where the Participating Authority has specific requirements that cannot be met by the Primary Supplier, or where continuity of supply or other valid reasons apply; or

Mini-competition among all framework suppliers capable of meeting the specific requirements (Lot 3 only).

Pricing determination: Prices for call-off contracts will be determined through the suppliers' framework pricing submissions and the specific requirements of the Participating Authority (for direct awards) or through competitive tendering in mini-competitions.

Supplier performance and transfer mechanisms: The Contracting Authority reserves the right to facilitate the transfer of Participating Authorities to alternative framework suppliers in circumstances including but not limited to: material supplier underperformance, supplier failure, force majeure, or where a Participating Authority's needs can be better served by an alternative supplier. Secondary suppliers provide essential resilience and optionality throughout the framework term.

The Contracting Authority reserves the right to remove or suspend suppliers from the framework where performance issues are not addressed satisfactorily in accordance with the dispute resolution procedures.

There is no restriction on the number of lots a single supplier may be awarded, enabling the appointment of a single primary supplier across multiple lots where this represents best value and meets strategic requirements.

Lots and requirements (3)Procurement structure

3 lots · all with a published value · evaluation weights differ by lot
Lot #1Flexible Procurement and Supply of Electricity with Additional ServicesAwardedRenewal 6 yrsPublished value£7,000,000,000

This lot covers the flexible procurement and supply of electricity to metered (Half Hourly and Non-Half Hourly) and unmetered supply sites across approximately 200 public sector Participating Authorities.

Scope of supply: Electricity procurement and supply including wholesale market access, flexible trading strategies, and portfolio management services for both Managed Service and Procurement Only Service Option (POSO) arrangements.

Indicative volumes: Approximately 2.4 TWh annually across circa 63,500 supply points, including schools, universities, police and fire stations, civic centres, housing portfolios, health trusts, and leisure centres. Volumes are indicative only and not guaranteed.

Metering and data services: Provision or accommodation of Meter Operation, Data Collection, and Data Aggregation services, working with both supplier-appointed and Participating Authority-nominated agents. Suppliers must support Market-wide Half-Hourly Settlement (MHHS) and future regulatory changes.

Additional services may include:

Power Purchase Agreements (PPAs) - physical, virtual, and sleeved arrangements

REGO-backed supply and renewable energy procurement

Demand-side response services

Access to intraday electricity markets (e.g., N2EX)

Small generation opportunities (Smart Export Guarantee, Feed-in Tariff)

Net zero and decarbonisation solutions

Flexible billing arrangements compatible with the Contracting Authority's systems

Contract period: 1 Oct 2026 – 30 Sept 2032 (6 yrs) · up to 30 Sept 2033 with extensionsValue: £7,000,000,000 exc. VAT · £7,000,000,000 inc. VAT
Delivery: UK
Extensions: The framework may be extended for up to one additional year beyond the initial 6-year term, at the Contracting Authority's sole discretion, subject to: Satisfactory supplier performance throughout the initial framework period Continued value for money and market competitiveness Compliance with the Procurement Act 2023 extension provisions Agreement with framework suppliers on extension terms Any extension will be confirmed in writing to suppliers with at least 6 months' notice before the initial framework expiry date (30/09/2032). Extension decisions will consider market conditions, regulatory changes, and the strategic requirements of the Contracting Authority and Participating Authorities at that time. The extension mechanism enables continuity of supply while a replacement framework procurement is conducted, avoiding service disruption to approximately 200 Participating Authorities.
Lot #2Flexible Procurement and Supply of Natural Gas, Daily Metered (DM) and Non-Daily Metered (NDM) with Additional ServicesAwardedRenewal 6 yrsPublished value£2,500,000,000

This lot covers the flexible procurement and supply of natural gas to Daily Metered (DM) and Non-Daily Metered (NDM) sites across approximately 200 public sector Participating Authorities.

Scope of supply: Natural gas procurement and supply including wholesale market access, flexible trading strategies, and portfolio management services for both Managed Service and Procurement Only Service Option (POSO) arrangements.

Indicative volumes: Approximately 4.2 TWh annually across circa 17,000 supply points, serving schools, universities, police and fire stations, civic centres, housing portfolios, health trusts, and leisure centres. Volumes are indicative only and not guaranteed.

Metering and data services: Provision or accommodation of meter reading services and AMR (Automatic Meter Reading) for profile classes, working with both supplier-appointed and Participating Authority-nominated agents.

Additional services may include:

Gas Purchase Agreements (GPAs) - for renewable gas sources

Sleeved gas transactions from third-party sources

Biomethane Certificates (BMCs) and Green Gas certification

Hydrogen mix certificate schemes (anticipating future grid injection)

Support for net zero decarbonisation goals

Flexible billing arrangements compatible with the Contracting Authority's systems

Load shaping and imbalance management

Contract period: 1 Oct 2026 – 30 Sept 2032 (6 yrs) · up to 30 Sept 2033 with extensionsValue: £2,500,000,000 exc. VAT · £2,500,000,000 inc. VAT
Delivery: UK
Extensions: The framework may be extended for up to one additional year beyond the initial 6-year term, at the Contracting Authority's sole discretion, subject to: Satisfactory supplier performance throughout the initial framework period Continued value for money and market competitiveness Compliance with the Procurement Act 2023 extension provisions Agreement with framework suppliers on extension terms Any extension will be confirmed in writing to suppliers with at least 6 months' notice before the initial framework expiry date (30/09/2032). Extension decisions will consider market conditions, regulatory changes, and the strategic requirements of the Contracting Authority and Participating Authorities at that time. The extension mechanism enables continuity of supply while a replacement framework procurement is conducted, avoiding service disruption to approximately 200 Participating Authorities.
Lot #3Supply of Innovation Solutions relating to renewable energy and flexibility servicesAwardedRenewal 6 yrsSMEPublished value£500,000,000

This lot establishes a panel of specialist providers offering innovative services that support renewable energy generation and electricity flexibility for public sector organisations. Services may be provided alongside or independently of electricity supply contracts under Lot 1.

The electricity market is undergoing significant transformation. This lot enables access to evolving flexibility and renewable energy solutions, with suppliers expected to develop their offerings throughout the framework term as market opportunities emerge.

Services include:

Flexibility Market Facilitators: Advising and/or facilitating public sector electricity assets to provide grid services including network flexibility auctions, Capacity Market participation, battery operation, Virtual Lead Party services (P415), wholesale market arbitrage, demand/generation control, Virtual Power Plant platforms, and asset aggregation.

Power Purchase Agreements: Licensed suppliers offering PPAs for generators with fixed price, flexible sale, index-linked (e.g. N2EX), or system price options.

Wholesale Energy Trading Alternatives: Solutions optimising locality and temporal matching of generation/demand, local energy markets, prosumer portfolio management, Complex Site Classes (P441), supply exemptions (P442), granular REGO matching, and financial hedging instruments.

Dynamic Electricity Tariffs: Licensed suppliers offering tariffs utilizing wholesale market, network pricing, or settlement signals to incentivize demand adjustment, load shifting, EV charging optimization, and behind-the-meter battery control.

Intermediary PPA Providers: Licensed suppliers acting as single offtaker for multiple renewable generators, packaging intermittent output into tradable blocks for on-supply to multiple end-user suppliers.

Balancing Services: Independent providers offering chargeable shaping and balancing services across import/export portfolios, settling with licensed suppliers or via the Contracting Authority.

Call-offs will be made via direct award or mini-competition based on Participating Authority requirements. Estimated project values vary from advisory services to substantial commercial arrangements.

Please note that the estimated value of this Lot is an indicative estimate only. Lot 3 is a call-off framework for project-based innovation services where demand is uncertain and will be driven by individual Participating Authority net zero programmes and market opportunities.

Contract period: 1 Oct 2026 – 30 Sept 2032 (6 yrs) · up to 30 Sept 2033 with extensionsValue: £500,000,000 exc. VAT · £500,000,000 inc. VAT
Delivery: UKEligibility: SME eligible
Extensions: The framework may be extended for up to one additional year beyond the initial 6-year term (to 30/09/2033), at the Contracting Authority's sole discretion. Extension decisions for Lot 3 will consider: Market maturity and evolution of flexibility/renewable energy services Supplier performance in delivering innovation solutions Continued availability of competitive and innovative offerings Value for money compared to re-procurement Regulatory and market developments (e.g., REMA implementation, local flexibility market evolution) Project pipeline and ongoing Participating Authority requirements Given the transformational nature of the electricity market during the framework term, the extension option provides continuity for multi-year projects while avoiding disruption to Participating Authorities' decarbonisation programmes. Extension decisions will be confirmed in writing to framework suppliers with at least 6 months' notice before the initial framework expiry date (30/09/2032). The Contracting Authority may extend some or all services within Lot 3 based on market assessment at that time.

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
What this means for your bid
  • Price carries 15–18 points depending on the lot. Read the split per lot below.
  • “28-32 Flexible Procurement and Supply of Gas and/or Electricity” is a framework: the contest is a place on its panel, not a single contract: call-offs may be direct or by further competition.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Open procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Goods
Notice status
Awarded
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
3 Nov 2025, 16:06 GMT
Last source update
31 Jul 2026, 09:18 BST
Award evaluation window
Submission end – 26 Jun 2026
Authority reference
Y26004
FTS notice number
2026/S 000-008262
Latest notice
Contract award notice (UK6)
Classification (CPV)
Electrical servicesElectricityEnergy and related servicesFuelsNatural gasPetroleum products, fuel, electricity and other sources of energy
Delivery area
UK
Official registry OCID
ocds-h6vhtk-05d93e Find a Tender

How it was run

Official notice
Run through: Delta eSourcing · Who buys & how to bid on Delta
Public notice page · account needed to bidElectronic submission allowedLanguage: EN
Access & registration note: Free Select account; no DUNS asked at signup
Appointment period ends
27 Mar 2026, 14:00 GMT
Clarification deadline
27 Feb 2026, 14:00 GMT
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Timeline

3 Nov 2025 → 1 Oct 2026 · 10 dates
  1. Planning notice published356 days ago
    3 Nov 2025, 16:06 GMT
  2. Next notice expected277 days ago
    20 Jan 2026, 23:59 GMT
  3. Tender notice published269 days ago
    29 Jan 2026, 19:05 GMT
  4. Clarification questions by240 days ago
    27 Feb 2026, 14:00 GMT
  5. Admission / appointment period ends212 days ago · period end, not a bid countdown
    27 Mar 2026, 14:00 GMT
  6. Award decision expected by120 days ago
    26 Jun 2026, 23:59 BST
  7. Assessment summaries sent86 days ago
    31 Jul 2026, 00:00 BST
  8. Latest notice published86 days ago
    31 Jul 2026, 09:18 BST
  9. Standstill ends73 days ago
    12 Aug 2026, 23:59 BST
  10. Contract starts24 days ago
    1 Oct 2026, 00:00 BST

Notice history

9 events · 4 releases on Find a Tender · since 3 Nov 2025
  1. Planned procurement notice published
    3 Nov 2025, 16:06 GMT
    UK3
  2. Tender notice published
    29 Jan 2026, 19:05 GMT
    UK4
  3. Status changed to active
    29 Jan 2026, 19:05 GMT
  4. Deadline moved to 27 Mar 2026, 14:00 GMT
    29 Jan 2026, 19:05 GMT
    +7 days · was 20 Mar 2026, 16:00 GMT
  5. Tender notice published
    16 Feb 2026, 10:05 GMT
    UK4
  6. Published value updated
    16 Feb 2026, 10:05 GMT
  7. Contract award notice published
    31 Jul 2026, 09:18 BST
    UK6
  8. Status changed to complete
    31 Jul 2026, 09:18 BST
  9. Contract signature expected
    30 Sept 2026, 23:59 BST
    scheduled
Published amendments (1)

The Estimated Value of this Framework and the Individual Lots have been increased to account for potential increases in volume and energy costs.

Routine re-releases (4)
  • 2025-11: 1 release · 3 Nov 2025

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 93 awards · see the list ↓
Bids received 6busiest of 3 lots
Named bidders 9published on the award notice
Awarded toValueDateStatus
Lot 1 · Flexible Procurement and Supply of Electricity with Additional Services1 award
EDF Energy Customers Limited, Npower Commercial Gas Limited, Total Energies Gas & Power1 Oct 2026 – 30 Sept 2032 · up to 30 Sept 2033Extensions: The framework may be extended for up to one additional year beyond the initial 6-year term, at the Contracting Authority's sole discretion, subject to: Satisfactory supplier performance throughout the initial framework period Continued value for money and market competitiveness Compliance with the Procurement Act 2023 extension provisions Agreement with framework suppliers on extension terms Any extension will be confirmed in writing to suppliers with at least 6 months' notice before the initial framework expiry date (30/09/2032). Extension decisions will consider market conditions, regulatory changes, and the strategic requirements of the Contracting Authority and Participating Authorities at that time. The extension mechanism enables continuity of supply while a replacement framework procurement is conducted, avoiding service disruption to approximately 200 Participating Authorities.£7,000,000,000 inc. VATvery large published value · not counted until verified, check the notice31 Jul 2026standstill to 12 Aug 2026Standstill
Lot 2 · Flexible Procurement and Supply of Natural Gas, Daily Metered (DM) and Non-Daily Metered (NDM) with Additional Services1 award
Corona Energy Retail 1 Limited, SEFE Energy Limited, Total Energies Gas & Power1 Oct 2026 – 30 Sept 2032 · up to 30 Sept 2033Extensions: The framework may be extended for up to one additional year beyond the initial 6-year term, at the Contracting Authority's sole discretion, subject to: Satisfactory supplier performance throughout the initial framework period Continued value for money and market competitiveness Compliance with the Procurement Act 2023 extension provisions Agreement with framework suppliers on extension terms Any extension will be confirmed in writing to suppliers with at least 6 months' notice before the initial framework expiry date (30/09/2032). Extension decisions will consider market conditions, regulatory changes, and the strategic requirements of the Contracting Authority and Participating Authorities at that time. The extension mechanism enables continuity of supply while a replacement framework procurement is conducted, avoiding service disruption to approximately 200 Participating Authorities.£2,500,000,000 inc. VATvery large published value · not counted until verified, check the notice31 Jul 2026standstill to 12 Aug 2026Standstill
Lot 3 · Supply of Innovation Solutions relating to renewable energy and flexibility services1 award
Brook Green Supply Limited, CUB (UK) LTDSME, EDF Energy Customers Limited, GRIDBEYOND LIMITEDSME, Npower Commercial Gas Limited, SSE Energy Supply Limited1 Oct 2026 – 30 Sept 2032 · up to 30 Sept 2033Extensions: The framework may be extended for up to one additional year beyond the initial 6-year term (to 30/09/2033), at the Contracting Authority's sole discretion. Extension decisions for Lot 3 will consider: Market maturity and evolution of flexibility/renewable energy services Supplier performance in delivering innovation solutions Continued availability of competitive and innovative offerings Value for money compared to re-procurement Regulatory and market developments (e.g., REMA implementation, local flexibility market evolution) Project pipeline and ongoing Participating Authority requirements Given the transformational nature of the electricity market during the framework term, the extension option provides continuity for multi-year projects while avoiding disruption to Participating Authorities' decarbonisation programmes. Extension decisions will be confirmed in writing to framework suppliers with at least 6 months' notice before the initial framework expiry date (30/09/2032). The Contracting Authority may extend some or all services within Lot 3 based on market assessment at that time.£500,000,000 inc. VAT31 Jul 2026standstill to 12 Aug 2026Standstill

Bid statistics published by the authority

LotBidsSMEVCSEValid bid range
1 · Flexible Procurement and Supply of Electricity with Additional Services3final-stage tenders · 5 at stage one00—
2 · Flexible Procurement and Supply of Natural Gas, Daily Metered (DM) and Non-Daily Metered (NDM) with Additional Services3final-stage tenders00—
3 · Supply of Innovation Solutions relating to renewable energy and flexibility services6final-stage tenders · 8 at stage one00—

Who bid

Bidders as named on the Procurement Act 2023 award notice. “Won” means the bidder holds an award on this notice.

Contracting authority & participating public bodies

Kent County Council (t/a Laser)

Contracting authorityPublic authority - sub-central government GB-PPON: PYCX-4938-CCHM 1 Abbey Wood Road, West Malling, South East, ME19 4YTContact email, phone

Framework contractors & participating bidders

9 commercial parties on the notice
  • Brook Green Supply LimitedFramework contractorGB-PPON: PDTD-3685-WGVD 245 Hammersmith Road, London, London, W6 8PWContact email
  • CUB (UK) LTDFramework contractorGB-PPON: PRYX-7436-MWYY 6 Melbourne Avenue, March, East of England, PE15 0ENContact email
  • Corona Energy Retail 1 LimitedFramework contractorGB-PPON: PRQL-7558-VRLN Building 2 Level 2, Watford, East of England, WD18 8YAContact email
  • EDF Energy Customers LimitedFramework contractorGB-PPON: PBLB-2611-LYMP Nova North, Bressenden Place, London, London, SW1E 5BYContact email
  • Gridbeyond LimitedFramework contractorGB-PPON: PQJL-8223-QHRT Office 7.08, Gridiron Building, 1 Pancras Square, London, London, N1C 4AGContact email
  • SEFE Energy LimitedFramework contractorGB-PPON: PBVD-1549-BYRH 20 Triton Street, London, London, NW1 3BFContact email
  • SSE Energy Supply LimitedFramework contractorGB-PPON: PCGX-2814-WLHL No. 1 Forbury Place, Reading, South East, RG1 3JHContact email
  • TotalEnergies Gas & Power LimitedFramework contractorGB-PPON: PDYB-5247-JVLW Kingswood Fields, Millfield Lane, Lower Kingswood, Tadworth, South East, KT20 6RPContact email
  • nPower Commercial Gas LimitedFramework contractorGB-PPON: PNPM-1457-MYHW Westwood Way, Coventry, West Midlands, CV4 8HSContact email

Official documents & specifications (6)

Official links; attachments are not copied

Notices published for this procedure

  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender
  • Planned procurement notice planningPlanned procurement noticeUK3Planned procurement notice on Find a Tender